| Location: | South Carolina |
|---|---|
| Posted: | Sep 19, 2025 |
| Due: | Oct 21, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Reconstruct an existing off-street parking lot (approx. 6,250 square feet, ~15 spaces) remove existing asphalt pavement, correct subgrade irregularities, and construct a full-depth hot-mix asphalt section within the existing footprint. The project includes incidental erosion and tree protection, minor grading and tie-ins, and site restoration within the project limits.

With GovernmentContracts, you can:
...Delivery Method: Design-Bid-Build Agency Project Coordinator: BLAKE BARBARE Email: BLAKE.BARBARE... of an engineering ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/17/2026
...School District One Anticipated Project Delivery Method: Design-Bid-Build Agency Project Coordinator... term Indefinite ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/07/2026
...of a conceptual design for the replacement new Miriam Brown Community Center. Full ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/06/2026
...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Jamie Caggiano Email... Be ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/30/2026