| Location: | South Carolina |
|---|---|
| Posted: | Sep 19, 2025 |
| Due: | Oct 17, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB #26031 |
| Publication URL: | To access bid details, please log in. |
The work consists of erosion mitigation off the embankment above athletic field #1, stabilization and repair at the storm drain outfall, and remediation of the sinkhole condition. All work must be coordinated to minimize disruption to park operations and public access to recreational facilities. A Non-Mandatory Pre-Proposal Meeting will be held at Butler Springs Park. Meet at the Picnic Shelter on October 7, 2025 at 11:30 AM EST.

With GovernmentContracts, you can:
...and erosion control measures. Pre-Bid Information: Optional Pre-Bid Meeting held at Lower Reedy ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/28/2026
...* Installation of erosion and sedimentation control facilities A non-mandatory pre-bid conference will ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/30/2026
...and wood habitat and stabilization structures, erosion and sediment control measures, and establishment...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/19/2026
...sidewalks, and concrete curb and gutter; installation of temporary and permanent erosion control..., ...
City of Charleston
Bid Due: 8/07/2026