CITY OF COLLEGE PARK Contracts and Procurement Department
Attention: Carl Hall, Purchasing Department
3667 Main Street City Hall
College Park, Georgia 30337
Email: Carlton.Hall@collegeparkga.gov Phone: (404)-767-1537
RE: REQUEST FOR QUOTE NO. 27-68
ELECTRIC FENCE INSTALLATION
OBJECTIVE
PURPOSE
The purpose of this RFQ is to obtain pricing for the furnishing, installation, integration, testing, and
commissioning of an electrified perimeter fencing and security system at the specified site, in
accordance with the project requirements and referenced site plans/layouts
MINIMUM QUALIFICATIONS & GENERAL REQUIREMENTS
Contractor shall be qualified and experienced in the installation of electrified perimeter fencing and
security systems. All work shall comply with applicable codes, manufacturer requirements, and site
conditions. Contractor shall provide all labor, materials, equipment, coordination, testing,
commissioning, and documentation necessary to deliver a complete and operational system.
PRICING
Lump Sum
SCOPE of SERVICE
Scope of Work – Electrified Fencing
1. Electrified Fence Installation – Furnish and install approximately 1,347 linear feet of
10-foot-tall electrified fencing, including 20 strands of electrified wire and required
warning signage.
2. Fence Zones – Provide and configure two fence zones as identified on the site
diagram/layout:
o Zone 3 – Yellow: 708 linear feet
o Zone 4 – Red: 608 linear feet
3. Gates & Access – Furnish and integrate two (2) secured gates with the electrified fence
and detection system.
4. Head-End / Sentinel Upgrade – Provide and configure one (1) Head-End with Sentinel
Upgrade, as identified by the blue square on the diagram/layout, for centralized system
control, zone management, alarm notification, and monitoring.
5. Detection & Alarm Integration – Configure intrusion detection and alarm functionality
for both fence zones, including audible/silent alarms, LED indicators, and real-time alarm
notification.
6. Virtual Access & Monitoring – Provide one (1) Virtual System Access connection and
integrate the system with 24/7 monitoring for alarm verification and response coordination.
7. Knox Box, Testing & Commissioning – Furnish/install one (1) Knox Box and complete
testing and commissioning of the fence zones, gates, Head-End/Sentinel system, alarms,
and remote monitoring.
Diagram/Layout Legend:
� Red = Zone 3 (708 LF)
� Yellow = Zone 4 (608 LF)
� Blue Square = Head-End / Sentinel Upgrade
LOCATION
College Park Power
1060 Forest Parkway
College Park, GA, 30349
(City may be listed as Atlanta)
INSURANCE REQUIREMENTS
Within ten (10) days of Notice of Award, and at all times that this contract is in force, the
contractor shall obtain, maintain, and furnish the City of College Park, Certificates of Insurance
from licensed companies doing business in the State of Georgia and acceptable to the City of
College Park covering:
1.
Worker’s Compensation
-
In accordance with O.C.G.A. Title 34, Chapter 9, as
amended
2.
Business Auto Policy
-
Not less than $500,000.00
3.
Commercial General
Liability
-
Minimum $1,000,000.00/claim
$2,000,000.00/occurrence for Personal Injury, Bodily
Injury, and Property Damage Liability
4.
Professional Liability
-
Not less than $1,000,000.00/occurrence
Copies of these Certificates of Insurance shall be furnished to the City of College Park prior to
execution of the contract. Such policies shall be non-cancellable except on a thirty-day (30)
written notice to the City of College Park.
1. The CITY OF COLLEGE PARK (and any applicable Authority) will be shown as an
additional insured on General Liability, Auto Liability, and Professional Liability
policies and noted accordingly on the Certificate of Insurance.
2. The cancellation provision should provide 30 days’ notice of cancellation.
3. Certificate Holder shall read:
City of College Park, Ga.
3667 Main Street
College Park, Ga. 30337
Pre-Proposal Conference
Not scheduled at this time
To schedule a site appointment, please contact Jayson Conn: jconn@collegeparkga.gov
Submittal Instructions
Bidders are required to submit all responses to this solicitation electronically through the designated
procurement platform-BidNet Direct. https://www.bidnetdirect.com/georgia/cityofcollegepark
If assistance is needed with registration, account access, or submission of documents, please contact
BidNet Direct’s Support Team at 800-835-4603, ext. 2.
Bidders are responsible for ensuring that all required documents are fully uploaded and submitted
prior to the solicitation deadline. Late or incomplete submissions may not be accepted. It is
recommended that bidders allow sufficient time to complete the electronic submission process to
avoid technical delays.
Right to Reject Quotations
The City reserves the right to accept or reject any or all written quotations received under this Request
for Quotations, or to eliminate any or all Contractors Selected Provider responding to this Request
for Quotations from further consideration for award, and to duly notify any such Selected Provider
of the City’s determination in the manner deemed most convenient by the City.
The City reserves the right to reject any written quotations that are submitted by a Contractor Selected
Provider using a form and/or format other than the form and/or format stipulated in the Scope of
Work Scope of Services and/or provided by the City, or an application that is in any way or manner
incomplete, illegible, irregular or non-compliant, and to duly notify any such Contractors Selected Provider
of the City’s determination in the manner deemed most convenient by the City.
Right to Eliminate Non-Qualified Selected Provider from Award Consideration
The City reserves the right to eliminate from award consideration any or all Contractors Selected Provider
who submit an incomplete and/or inadequate written quotation response or who are not responsive to any
and/or all of the requirements stipulated in the attached Scope of Work, Scope of Services and to duly notify
any such Contractors Selected Provider of the City’s determination in the manner the City deems most
convenient.
Right to Cancel Request for Quotations
This Request for Quotations does not obligate the City to select a Contractor or Selected Provider and/or to
procure and/or contract the Selected Provider for any goods and/or services whatsoever.
The City reserves the right to cancel this Request for Quotations, with or without substituting another Request
for Quotations, and, if so desired, terminate the process at any time. Cancellation of this Request for
Quotations may occur with or without cause or prior notification. Cancellation of this Request for
Quotations, with or without substitution, shall not result in any liability to any Contractor Selected Provider
for any reason whatsoever.
Time/Date
Thursday, September 10th, 2026, no later than 3:00 p.m.
Event
Request for Quotes Due