| Location: | Massachusetts |
|---|---|
| Posted: | Sep 28, 2026 |
| Due: | Nov 12, 2026 |
| Agency: | City of Lowell |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 27-10 |
| Publication URL: | To access bid details, please log in. |
| Bid Number: |
27-10
|
| Bid Title: |
CAD Mobile, LRMS and FRMS, pre-proposal link addenda 1
|
| Category: | Purchasing |
| Status: | Open |
City of Lowell, MA September 21, 2026
RFP #27-10 CAD/Mobile, LRMS and FRMS Page 1 of 3
Attachment 3 - Acceptance Test Requirements
Acceptance Tests
The City requires three types of acceptance tests: functional, performance and reliability. The
proposed Acceptance Test Plan (ATP) should address all three types of acceptance tests. After the
successful completion of each test, the City will notify the Proposer in accordance with task
completion requirements in the Statement of Work.
In the event a Level 1 Error is corrected by the Proposer, then subsequently fails on two (2)
additional occasions within the test period, the City has the right to be refunded all previous
payments under the Contract.
Functional Acceptance Testing Requirements
The City expects the Contract to include a baseline test plan with Functional Acceptance Testing
occurring before System go-live. The Proposer will provide functional test scripts that test all
contracted functionality. The City can add additional scenarios and tests to test site-specific
workflows. The Proposer will be responsible for mapping the test scripts to the requirements to
demonstrate to the City that all contracted functionality will be tested.
The City and Proposer will work together to confirm all System functionality. Each specific System
function agreed to as part of the final Contract should be tested and tracked from original
documentation (e.g., proposal to Contract to Acceptance Testing) by the successful Proposer.
During the Functional Acceptance Test, the successful Proposer will demonstrate the operation of
each proposed or required feature, function, and interface based on the test plan that will be
approved by the City prior to contract signing.
If a requirement fails a test, the successful Proposer will have up to ten (10) days to either correct
the discrepancy or work with the City to develop a mutually agreeable date of when it will be
corrected. Once a failed requirement is corrected, the successful Proposer and the City will
conduct additional testing of that requirement to verify that it passes the test.
Performance Testing Requirements
The purpose of the Performance Test is to demonstrate and document, as necessary, the
performance requirements as stated in Attachment 5.
The Performance Test will be conducted after the successful implementation and functional testing
of the CAD, Mobile, LRMS and FRMS applications, and again in a live integrated environment after
system cutover to ensure that performance standards are maintained when all public safety
systems are in use.
RFP #27-10 | Attachment 3 - Acceptance Test Requirements
City of Lowell, MA September 21, 2026
RFP #27-10 CAD/Mobile, LRMS and FRMS Page 2 of 3
As described below under Reliability Testing Requirements, the System must demonstrate that it
can conform to the performance requirements for 90 days after System cutover in the operational
and integrated environment. If the System fails to meet the performance criteria for any reason, the
problem will be corrected by the Proposer, and the Acceptance Period will restart upon correction.
Reliability Testing Requirements
The purpose of the Reliability Test is to demonstrate the operational capability and reliability of the
System, and to test the ability of the System to adhere to the performance standards in a live
environment over time.
Reliability Testing will be conducted for 90 consecutive days after the cutover of the System or each
application, if there is a staggered go-live for each application.
During Reliability Testing, errors will be classified and remedied as described in the following
paragraphs:
Level 1 Error - Error a(cid:431)ects multiple users, critical operations and/or database
functionality. Level 1 Errors result in data loss, data corruption, prevented productive use of
System, inoperative servers or systemic workstation failures. The successful Proposer will
have 24 hours to fix and test the problem. Once problem is resolved, a new acceptance test
period will begin. Once the System operates for the total number of intended consecutive
days without a Level 1 Error, the Reliability Test will be completed for that System
Component or the System.
Level 2 Error - Error a(cid:431)ects productive use and operations of the System Component or
System, or System or System Component does not meet performance or availability
standards. A procedural work-around is not available. The successful Proposer will have 24
hours to fix and test the problem. Once problem is resolved, a new acceptance test period
will begin. Once the System Component or System operates for the total number of
intended consecutive days without a Level 2 Error, the Reliability Test will be completed for
that System Component or the System.
Level 3 Error - System or functionality does not work as expected, resulting in an
incomplete, unintended or erroneous operation. Productive use of the System is not
significantly impacted and a procedural work-around is available. The successful Proposer
will attempt to fix the error during the Reliability Test period. If the successful Proposer is
not able to fix the error during the Reliability Test period, the successful Proposer and the
City will develop a mutually acceptable plan to remedy the error in a future fix release.
Level 4 Error - System contains minor errors that do not impact productive use of the
application or module. The successful Proposer and the City will develop a mutually
acceptable plan to remedy the error in a future fix release, and System will be accepted.
During the Reliability Test period, the CAD System must be available 99.999 percent of the time and
LRMS and FRMS must be available for 99.95 percent of the time.
RFP #27-10 | Attachment 3 - Acceptance Test Requirements
City of Lowell, MA September 21, 2026
RFP #27-10 CAD/Mobile, LRMS and FRMS Page 3 of 3
If availability degradation is discovered, the City may choose to stop use of the application or use
whatever operational portion may be available. The City will determine an acceptable error level
and the successful Proposer will remedy as per the above error classifications.
Final System Acceptance
Final System Acceptance will occur after the completion of the overall System 90-day Reliability
Test and a mutually agreed plan to remedy Level 3 and Level 4 errors has been developed.
RFP #27-10 | Attachment 3 - Acceptance Test Requirements

With GovernmentContracts, you can:
IFB-Water meters November 2, 2026 Town of North Andover, MA Notice-water-meters.pdf Notice- Invitation
Town of North Andover
Bid Due: 11/18/2026
Bid Number: PW-27-04 Bid Title: STORM DRAIN PIPELINE AND STRUCTURE CLEANING AND CCTV
Town of Tewksbury
Bid Due: 11/19/2026
LIQUID EMULSION POLYMER DEER ISLAND TREATMENT Event: 6866-0 Reference: WRA- 5891 REQ 318822
Massachusetts Water Resources Authority
Bid Due: 11/17/2026
Header Information Bid Number: BD-27-1068-1700-1-135084 Description: Underage Access To Sports Wagering Platforms Research
Commonwealth of Massachusetts
Bid Due: 12/15/2026