Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Brandon Road Interbasin Project, Increment 1-A

Location: Illinois
Posted: Aug 26, 2025
Due: Aug 28, 2025
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: W912EK25R0007
Publication URL: To access bid details, please log in.
Follow
Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Brandon Road Interbasin Project, Increment 1-A
Active
Contract Opportunity
Notice ID
W912EK25R0007
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
US ARMY CORPS OF ENGINEERS
Sub Command
ENGINEER DIVISION MISSISSIPPI VALLEY
Office
W07V ENDIST ROCK ISLAND
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Aug 26, 2025 12:07 pm CDT
  • Original Published Date: May 16, 2025 05:26 pm CDT
  • Updated Date Offers Due: Aug 28, 2025 01:00 pm CDT
  • Original Date Offers Due: Jun 30, 2025 01:00 pm CDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Aug 26, 2026
  • Original Inactive Date: May 16, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1KA - CONSTRUCTION OF DAMS
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:
    Joliet , IL 60436
    USA
Description View Changes

The U.S. Army Corps of Engineers, Rock Island District has a requirement for a construction contract for the project known as: Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Brandon Road Interbasin Project, Increment 1-A.

Project Description: The work includes, but is not limited to, construction of aquatic nuisance species (ANS) deterrents: Automated Barge Clearing Deterrent (ABCD); Bubble Curtain Deterrent (BCD); and Acoustic Deterrent; support facilities and access roads, excavation within the Short Engineered Channel (SEC) to include, but not limited to: demolition; clearing, grubbing, and stripping; underwater excavation of rock and sediment; fabricated building systems; electrical work; mechanical work; plumbing work; structural work; architectural finishes and specialties; TAB and commissioning; directional drilling; concrete work; sheet pile work; fabrications; emergency, interior and exterior lighting work; cybersecurity work; electronic security systems; earthwork; floating dock and boat ramp construction; asphalt paving; riprap placement; chain-link fencing and gates; salvage materials for reinstallation; generator installation; site and building signage; surveying; instrumentation and monitoring; and site restoration.

NAICS Code: 237990

Size Standard: $45,000,000.00

Estimated Range: Between $100,000,000 and $250,000,000

Unrestricted, Best Value Trade-Off

Questions regarding this solicitation shall be submitted via ProjNet by 2:00 PM CST on 11 June 2025. See Item #4 within the Instructions to Offerors - Important Notes Regarding the Acquisition section for additional information.

****Amendment 0001 - The purpose of this amendment is to update clauses 52.211-10 and 52.211-12, provide updated plans and specification documents, extend the due date for submission of questions via ProjNet to 2:00 PM CST on 14 July 2025, extend the due date for submission of proposals, and add another site visit date. Amendment document and two new plans and specs documents are accessible via the link below titled "PIEE Solicitation Module Link for W912EK25R0007." If you are unable to access the amendment, please email the Contract Specialist, Samantha Johanson at samantha.k.johanson@usace.army.mil.

****Amendment 0002 - The purpose of this amendment is to add Project Labor Agreement (PLA) requirement, add clauses FAR 52.222-33 and 52.222-34, update Attachment A - Past Performance Questionnaire, and include geotech reference documents as Attachments F, G, and H. Amendment document, updated Attachment A, and new Attachments F, G, and H are accessible in the Attachments/Links section below.

****Amendment 0003 - The purpose of this amendment is to extend the Q and A and proposal due dates, split option 1 into two options and create CLIN 0003 for Option 2, provide updated plans, specs, and sections L and M resulting from bidder inquiries, provide updated wage determinations to be used, updated clauses to appropriately reflect aforementioned changes. Amendment documents are accessible via the link below titled "PIEE Solicitation Module Link for W912EK25R0007." If you are unable to access the amendment, please email the Contract Specialist, Samantha Johanson at samantha.k.johanson@usace.army.mil.

****Amendment 0004 - The purpose of this amendment is to update the plans and specs. The updates include but are not limited to: revisions to civil cross sections; revisions to structural and electrical notes, details, and cross section; redesign of protection cells; building equipment and insulation additions; clarification on generator enclosure/building heating requirements; revisions to commissioning, concrete, painting, generator, security system, drilled shafts, and process controls specifications; addition of insulation and door specifications sections. Amendment documents are accessible via the link below titled "PIEE Solicitation Module Link for W912EK25R0007." If you are unable to access the amendment, please email the Contract Specialist, Samantha Johanson at samantha.k.johanson@usace.army.mil.

****Amendment 0005 - The purpose of this amendment is to: Update the Plans and Specs to include but not limited to: added I/O Points List, Revisions to various structural Bill of Material quantities, removed storm sew er w ork, revision to sheet pile dimensioning, revisions to rip rap CLINs, adjusted seismic monitoring requirements; update Section L to increase the max page limit for Factor 1 Technical Approach, and clarify that interim CPARS may be submitted in lieu of PPQ for projects over 50% complete; replace the Heavy and Highway Wage Determinations with the most up-to-date version; add informational reference documents as Attachment I. Amendment documents are accessible via the link below titled "PIEE Solicitation Module Link for W912EK25R0007." If you are unable to access the amendment, please email the Contract Specialist, Samantha Johanson at samantha.k.johanson@usace.army.mil.

****Amendment 0006 - The purpose of this amendment is to replace the Heavy and Highway Wage Determinations with the most up-to-date version. Amendment documents are accessible via the link below titled "PIEE Solicitation Module Link for W912EK25R0007." If you are unable to access the amendment, please email the Contract Specialist, Samantha Johanson at samantha.k.johanson@usace.army.mil.

Prebid Site Visit sign in sheets are available in the Attachments/Links section below.


Attachments/Links
Contact Information
Contracting Office Address
  • KO CONTRACTING DIVISION 1 ROCK ISLAND ARSENAL
  • ROCK ISLAND , IL 61299-5001
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Jan 22, 2025[Presolicitation (Original)] Illinois River Basin, Brandon Road L&D, Joliet, Illinois, Brandon Road Interbasin Project, Increment 1-A
May 16, 2025[Solicitation (Updated)] Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Brandon Road Interbasin Project, Increment 1-A
Jun 11, 2025[Solicitation (Updated)] Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Brandon Road Interbasin Project, Increment 1-A
Jun 27, 2025[Solicitation (Updated)] Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Brandon Road Interbasin Project, Increment 1-A
Jul 18, 2025[Solicitation (Updated)] Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Brandon Road Interbasin Project, Increment 1-A
Aug 6, 2025[Solicitation (Updated)] Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Brandon Road Interbasin Project, Increment 1-A
Aug 14, 2025[Solicitation (Updated)] Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Brandon Road Interbasin Project, Increment 1-A
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...five categories of work: (i) Architecture; (ii) Civil and Structural Engineering; (iii) Landscape... ...

Chicago Park District

Bid Due: 12/31/2027

...for one, some, or all five categories of work: (i) Architecture; (ii) Civil ...

Chicago Park District

Bid Due: 12/31/2027

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.