Solar System PV USING THE DESIGN/BUILD DELIVERY SYSTEM ADDENUM NO.1

Location: North Carolina
Posted: Jun 22, 2026
Due: Jul 2, 2026
Agency: Waynesville town
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.

REQUEST FOR QUALIFICATIONS

Solar System PV

USING THE DESIGN/BUILD DELIVERY SYSTEM

Proposal Date: 6/3/2026

Due Date: 7/2/2026 @ 3:00 pm

6/22/26:PLEASE CLICK HERE TO VIEW THE ADDENUM NO.1

In accordance with GS 143-128.1A the TOWN OF WAYNESVILLE is soliciting proposals from a qualified solar photovoltaic (solar PV) firm/team to design AND construct a roof mount solar PV system the site address. The Firm/Team is responsible for all project permitting. Respondents shall have demonstrated experience designing, planning, scheduling, permitting and constructing complete solar, have relationships with/knowledge of local utilities, provide project financial analysis and rebate support, provide system monitoring and maintenance, and have established onsite safety standards.

For more information on the proposal request and how to submit, please click here.

Attachment Preview

TOWN OF WAYNESVILLE
ADDENDUM NO. 1
Recreation Center Solar Photovoltaic (PV) Design-Build Project
Issue Date: 6/22/2026
NOTICE TO ALL PROSPECTIVE PROPOSERS
This Addendum forms a part of the Contract Documents for the Town of Waynesville Recreation
Center Solar Photovoltaic (PV) Design-Build Project. The purpose of this Addendum is to
provide clarifications in response to questions received during the pre-bid period.
All requirements of the original RFQ remain in effect except as modified by this Addendum.
GENERAL PROJECT CLARIFICATIONS
1. PV System Size
The Town is requesting that the successful proposer design and provide the maximum practical
photovoltaic system that can be accommodated on the designated upper roof of the Recreation
Center.
The final system size shall be determined by the proposer based upon:
* Available roof area
* Required fire code setbacks
* Roof access requirements
* Structural considerations
* Electrical system limitations
* Utility interconnection requirements
Proposers shall clearly identify the proposed DC and AC system capacities included in their
proposal.
2. Designated Roof Areas

Solar photovoltaic equipment shall be installed only on the large upper roof section of the
Recreation Center.
The lower roof areas and metal roof sections are excluded from this project and shall not be
utilized for PV installation.
3. Roof Replacement
The Recreation Center roof will receive a direct replacement Thermoplastic Polyolefin (TPO)
roofing system.
The new roof will include a twenty (20) year manufacturer's warranty.
The roofing project is currently being publicly procured under a separate solicitation, with
construction anticipated following contract award.
The roofing project has been developed with the understanding that a rooftop photovoltaic
system will be installed. Coordination between the roofing contractor and the successful solar
contractor will be required to maintain all applicable roof warranty requirements.
4. Roof Penetrations
Existing roof penetrations shall remain unless otherwise directed by the Town.
Proposers shall base their designs upon existing field conditions.
5. Structural Information
The Town has retained a structural engineer who has completed a preliminary review of the
existing roof structure for the proposed solar installation.
Formal structural documentation is currently being finalized and will be provided if available.
The successful proposer shall be responsible for all engineering necessary to complete a code-
compliant structural design.

6. Electrical Coordination
The Town of Waynesville operates its own municipal electric utility.
Final approval of the following shall be coordinated with the Town Electric Department during
final design:
* Point of interconnection
* Utility protection requirements
* Metering requirements
* Disconnect requirements
* Export limitations
* Any additional utility operational requirements
Proposers shall clearly identify any assumptions used in developing their proposals.
7. Electrical Documentation
An electrical one-line diagram is not currently available for distribution.
The successful proposer shall perform all field verification necessary to complete the final
electrical design.
8. Domestic Content and Incentives
As stated in the RFQ, the Town strongly encourages the use of American-made or domestically
manufactured components. Proposers should maximize the use of qualifying domestic content,
where practical, to enhance eligibility for available federal tax incentives associated with the
project.
Proposals shall identify:
* The manufacturer and country of origin for all major system components.
* The estimated domestic content of the proposed system, if applicable.
* Any domestic content tax credit bonuses or other federal tax incentives for which the
proposed system may qualify.
* Documentation supporting domestic content claims, if available.
Consistent with the RFQ evaluation criteria, the Town will consider the use of American-made
components and the ability to maximize available federal tax incentives during proposal
evaluation.

RESPONSES TO REQUESTS FOR
INFORMATION
RFI-1
Question
Please provide the required PV system size.
Response
Refer to General Project Clarification No. 1.
RFI-2
Question
Please clarify utility interconnection limitations and applicable renewable energy rate riders.
Response
The Town is not aware of any utility interconnection limitations that would preclude the
proposed project. The successful contractor shall be responsible for coordinating with the serving
electric utility and obtaining all required interconnection approvals in accordance with applicable
utility requirements. At this time, the Town is not utilizing, nor is it aware of, any applicable
renewable energy rate riders associated with this project. Proposers should base their proposals
on the Town's current electric service and applicable standard utility rates.
RFI-3
Question
Please identify the preferred electrical point of interconnection.
Response
At this time, the Town has not identified a preferred electrical point of interconnection. Proposers
shall evaluate the existing electrical system and propose the most appropriate point of
interconnection as part of their system design. The proposed interconnection location shall be

reviewed and coordinated with the Town's Electric Department during the design phase and shall
comply with all applicable codes and utility requirements.
RFI-4
Question
Are BABA-compliant products required?
Response
See General Project Clarification No. 8.
RFI-5
Question
Please provide an electrical one-line diagram.
Response
An electrical one-line diagram is not currently available. The successful proposer shall perform
the necessary field verification required for final design.
RFI-6
Question
Please provide the allowable roof loading.
Response
The Town has retained a structural engineer to review the existing roof structure. Additional
structural information will be provided if available.
RFI-7
Question

Please provide the pre-bid attendance sheet.
Response
The attendance sheet will be included as an attachment to this Addendum.
The Town has prepared an attendance record based on the pre-bid site visit conducted on June
10, 2026. If any attendee has been inadvertently omitted, please notify the Town within five (5)
business days so the attendance record may be updated.
RFI-8
Question
Please clarify Operations and Maintenance requirements, including module cleaning.
Response
Proposers shall include a recommended Operations and Maintenance program as part of their
proposal and clearly identify any module cleaning services, inspection schedules, and optional
maintenance services.
RFI-9
Question
Please clarify attic stock or spare parts requirements.
Response
Proposers shall identify any recommended spare parts or attic stock included within their
proposal.
RFI-10
Question
Please confirm whether Davis-Bacon or prevailing wage requirements apply.

Response
Yes. This project is subject to the Davis-Bacon Act. The successful contractor and all
subcontractors shall comply with all applicable federal prevailing wage requirements and
associated labor standards. Compliance with all Davis-Bacon reporting, payroll, and
documentation requirements shall be the responsibility of the contractor.
ADDITIONAL BIDDER QUESTIONS
Multiple Design Options
The Town will accept one (1) base proposal meeting all requirements of the RFQ.
Optional alternate designs or value engineering options may be submitted separately and clearly
identified as alternates.
Roof Areas
Only the designated upper roof shall be utilized for photovoltaic installation.
Roof Type
The roof replacement will consist of a direct replacement TPO roofing system with a twenty (20)
year manufacturer's warranty.
Roof Vents
Existing roof penetrations shall remain unless otherwise directed by the Town.
Operations and Maintenance
Proposers shall provide a recommended Operations and Maintenance plan and identify any
optional extended maintenance services available.

ATTACHMENTS
The following documents are anticipated to accompany this Addendum, as available:
* Pre-Bid Meeting Attendance Sheet
* Roof Replacement Project Information
* Structural Engineering Information (when available)
* Recreation Center Electrical Usage Information (highest monthly electric bill from the
previous 12 months)
* Additional Utility Requirements (if issued)
End of Addendum No. 1

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Project: Progressive Design-Build Services for Lee S. Dukes WTP Expansion Ref. #: FY27-DB-01... ...

City of Charlotte

Bid Due: 9/03/2026

...Project: Request for Qualifications for Progressive Design-Build Services for Commercial Burn... EDT Project ...

City of Charlotte

Bid Due: 8/11/2026

...Solicitation Number: 121-073126DD Project Title: North Campus Fire Training Phase III Design-Build... Services ...

State Government of North Carolina

Bid Due: 9/01/2026

...Project: Request for Qualifications for Progressive Design-Build Services for Commercial Burn... EDT Project ...

City of Charlotte

Bid Due: 8/11/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.