| Location: | Washington |
|---|---|
| Posted: | Aug 26, 2025 |
| Agency: | County of Clark |
| Type of Contract: | Awards |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Generally, the work includes but is not limited to selective demolition; new wall framing and gypsum board finishes; new doors, relites, door hardware, finishes, electrical / low voltage rough-ins and new LED light fixtures in areas of work only. Existing HVAC systems, fire alarms and fire sprinklers will need to be modified based on the new layout. The work area for the project is approximately +/-1,486 S.F.
A Non-Mandatory Pre-Bid Meeting is scheduled for 10:00 am on Monday, July 21, 2025.
Contractors shall meet on the 1st floor East side of the main lobby of the Public Service Center located at 1300 Franklin Street, Vancouver WA 98660.

With GovernmentContracts, you can:
...Paramount House Fire Alarm System Replacement Deadline: 06/03/2026...
King County Housing Authority
Bid Due: 6/03/2026
...system. Also included is the installation of fire alarm strobe lights at the ...
Longview Public Schools
Bid Due: 6/03/2026
...MAP PROJECT DESCRIPTION The Project consists of the replacement of the existing fire ...
Longview Public Schools
Bid Due: 6/03/2026
...of the existing fire alarm system. Also included is the installation of fire ...
Longview Public Schools
Bid Due: 6/03/2026