| Location: | Georgia |
|---|---|
| Posted: | Aug 10, 2026 |
| Due: | Sep 17, 2026 |
| Agency: | G. Ben Turnipseed Engineers |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Bid Date: Thursday, September 17, 2026
Bid Time: 2:30 p.m.
Contact: Alicia Addenbrook, (706) 863-8800
Contract 1: Sewerage System Improvements installing approximately 3,600 linear feet of DIP and PVC sewer including manholes, jack and bore, rock excavation, clearing, soil erosion and sediment control, and appurtenances. Contract 2: Little River Water Pollution Control Plant to include a screen and grit structure, (2) two aeration basins, two (2) final clarifiers, tertiary filters, ultraviolet disinfection unit, sludge pump station, plant pump station, chemical feed facilities, control building, digester and sludge dewatering building, all complete with appurtenances.

With GovernmentContracts, you can:
...SAC 30660 Runway 10 Tree Clearing Savannah Airport Commission Oct 09, 2026 @ ...
State Government of Georgia
Bid Due: 11/10/2026
...scope includes site preparation and demolition, clearing and grubbing, earthwork and grading...
City of Sandy Springs
Bid Due: 11/06/2026
...of the city of Columbus Georgia. The Lozada Range is a fan-shaped clearing ...
State Government of Georgia
Bid Due: 11/23/2026
...Muscogee Tech Park in Columbus, Georgia. The work generally includes site preparation, clearing... ...
State Government of Georgia
Bid Due: 11/13/2026