| Location: | Georgia |
|---|---|
| Posted: | Aug 10, 2026 |
| Due: | Sep 17, 2026 |
| Agency: | G. Ben Turnipseed Engineers |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Bid Date: Thursday, September 17, 2026
Bid Time: 2:30 p.m.
Contact: Alicia Addenbrook, (706) 863-8800
Contract 1: Sewerage System Improvements installing approximately 3,600 linear feet of DIP and PVC sewer including manholes, jack and bore, rock excavation, clearing, soil erosion and sediment control, and appurtenances. Contract 2: Little River Water Pollution Control Plant to include a screen and grit structure, (2) two aeration basins, two (2) final clarifiers, tertiary filters, ultraviolet disinfection unit, sludge pump station, plant pump station, chemical feed facilities, control building, digester and sludge dewatering building, all complete with appurtenances.

With GovernmentContracts, you can:
..., stripping, excavation, cut-and-fill operations, placement and compaction of suitable fill, and rough..., ...
State Government of Georgia
Bid Due: 11/13/2026
...System with electrical room and blowers, Chlorine Contact Chamber, including earth excavation...
G. Ben Turnipseed Engineers
Bid Due: 11/05/2026
...Contact Chamber, including earth excavation, backfilling, grading, concrete structures, piping...
G. Ben Turnipseed Engineers
Bid Due: 11/05/2026
..., Digging, Ditching, Road Grading, Rock Stabilization, etc. 91240 Demolition Services 91244 Excavation ...
State Government of Georgia
Bid Due: 11/19/2026