| Location: | Georgia |
|---|---|
| Posted: | Aug 10, 2026 |
| Due: | Sep 17, 2026 |
| Agency: | G. Ben Turnipseed Engineers |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Bid Date: Thursday, September 17, 2026
Bid Time: 2:30 p.m.
Contact: Alicia Addenbrook, (706) 863-8800
Contract 1: Sewerage System Improvements installing approximately 3,600 linear feet of DIP and PVC sewer including manholes, jack and bore, rock excavation, clearing, soil erosion and sediment control, and appurtenances. Contract 2: Little River Water Pollution Control Plant to include a screen and grit structure, (2) two aeration basins, two (2) final clarifiers, tertiary filters, ultraviolet disinfection unit, sludge pump station, plant pump station, chemical feed facilities, control building, digester and sludge dewatering building, all complete with appurtenances.

With GovernmentContracts, you can:
...WATER TREATMENT PLANT CHEMICAL FEED AND CONTROL BUILDING UPGRADES Cartersville, City Of Sep ...
State Government of Georgia
Bid Due: 10/16/2026
..., additional Backwash Pump at the Water Plant. SCADA system integration will be ...
State Government of Georgia
Bid Due: 11/03/2026
...Treatment Plant 91360 Construction, Water System, Plants, Main and Service Line 91361 Construction... ...
State Government of Georgia
Bid Due: 11/03/2026
...and Wastewater Treatment Services 22014 Energy Computerized Control Systems: HVAC, Lighting, Utilities, etc.... ...
State Government of Georgia
Bid Due: 10/22/2026