| Location: | South Carolina |
|---|---|
| Posted: | Jan 13, 2025 |
| Due: | Feb 14, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ITB 2025-01-001 |
| Publication URL: | To access bid details, please log in. |
Installation of approximately 3000 LF of curb and Gutter, 2500 LF of sidewalk with associated pedestrian ramp and ADA requirements, 1200 LF of storm drainage
and associated structures, 1200 LF drinking water distribution lines with associated distribution and service connections, installation of fire hydrants, and replacement of asphalt pavement, tree removal, pavement markings and erosion control for sidewalk installation.
(CDBG).

With GovernmentContracts, you can:
...Project Name: Design & Build Services Hangers W & Y at Downtown Airport ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/11/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Mosely... Designs Email: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Moseley Designs Email...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...19, 2026 - 2:00pm Project Location: Pendleton, SC Project Delivery Method: Design-Bid-Build... qualified ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/19/2026