| Location: | Michigan |
|---|---|
| Posted: | Dec 29, 2025 |
| Due: | Mar 11, 2026 |
| Agency: | Great Lakes Water Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | REQ-0007184 |
| Publication URL: | To access bid details, please log in. |
Project Description: Contractor shall conduct numerous improvements to the Hubbell-Southfield Combined Sewer Overflow (CSO) Facility located in Dearborn, Michigan. Hubbell-Southfield has a 22-million-gallon (MG) storage capacity and a design flow capacity of 2,200 cfs. The facility began operation in 1999 and requires rehabilitation and upgrades to ensure continued reliable treatment of wet weather flows. The facility discharges to the Northwest Interceptor with overflows discharging to the Rouge River.
This project is focused on improving facility treatment reliability, flexibility, operation, maintenance, and safety features at the Hubbell Southfield CSO Facility. This project encompasses improvements to basin flushing, dewatering, disinfection, screening, instrumentation and controls, architectural/HVAC, and electrical, as well as site work and other items. A major upgrade is to replace the existing flushing system used to clean the basin with a more effective system.

With GovernmentContracts, you can:
...Marquette Avenue Interceptor Sewer Rehabilitation Bid Ad ADVERTISEMENT CITY OF BAY CITY SEALED ...
City of Bay City
Bid Due: 8/12/2026
...Bid #2565 - Sanitary Sewer Pipes Rehabilitation SPECIFICATIONS For SANITARY SEWER PIPES... COMPANY ...
City of Riverview
Bid Due: 8/27/2026
...Project Bid/Proposal Bid Opening Date & Time bid Tab Industrial Bypass Sewer Project ...
City of Greenville
Bid Due: 8/11/2026
...Project: Ashland Relief, Linwood, Second Avenue, and Shiawassee Sewer Rehabilitation Ref. #: REQ... ...
Great Lakes Water Authority
Bid Due: 10/01/2026