The Clemson University Poultry Science Research Facility includes construction of two new utilitarian agricultural research buildings in Pendleton, SC: an 11,800 SF Broiler Building and a 9,980 SF Layer Building. Work includes animal housing systems, ventilation with evaporative cooling, durable wash-down interiors, and associated site utilities and infrastructure improvements.
SE-310
INVITATION FOR DESIGN-BID-BUILD CONSTRUCTION SERVICES
AGENCY: Clemson Public Service Authority
PROJECT NAME: Poultry Science Research Facility
PROJECT NUMBER: P20-N013-PD CONSTRUCTION COST RANGE: $5,000,000 to $6,000,000
PROJECT LOCATION: Clemson, SC
DESCRIPTION OF PROJECT/SERVICES: (450 character limit)
The Clemson University Poultry Science Research Facility includes construction of two new utilitarian agricultural
research buildings in Pendleton, SC: an 11,800 SF Broiler Building and a 9,980 SF Layer Building. Work includes animal
housing systems, ventilation with evaporative cooling, durable wash-down interiors, and associated site utilities and
infrastructure improvements.
BID/SUBMITTAL DUE DATE: 04/15/2026 TIME: 11:00 AM NUMBER OF COPIES: 1
PROJECT DELIVERY METHOD: Design-Bid-Build
AGENCY PROJECT COORDINATOR: Phillip Addington
EMAIL: padding@clemson.edu TELEPHONE: (864) 643-6164
DOCUMENTS OBTAINED FROM: https://cufacilities.sites.clemson.edu/pdc/projectManagement/projects
BID SECURITY IS REQUIRED IN AN AMOUNT NOT LESS THAN 5% OF THE BASE BID.
PERFORMANCE AND LABOR & MATERIAL PAYMENT BONDS: The successful Contractor will be required to
provide Performance and Labor and Material Payment Bonds, each in the amount of 100% of the Contract Price.
DOCUMENT DEPOSIT AMOUNT: $0.00 IS DEPOSIT REFUNDABLE: Yes No N/A
Bidders must obtain Bidding Documents/Plans from the above listed sources(s) to be listed as an official plan holder. Bidders that
rely on copies obtained from any other source do so at their own risk. All written communications with official plan holders &
bidders will be via email or website posting.
Agency WILL NOT accept Bids sent via email.
All questions & correspondence concerning this Invitation shall be addressed to the A/E.
A/E NAME: DLR Group A/E CONTACT: Soraya Saffouri
EMAIL: ssaffouri@dlrgroup.com TELEPHONE: (973) 362-8764
PRE-BID CONFERENCE: Yes No MANDATORY ATTENDANCE: Yes No
PRE-BID DATE: 03/19/2026 TIME: 01:00 PM
PRE-BID PLACE: 280 Seneca Creek Road Seneca, SC 29678-University Facilities Room A151
BID OPENING PLACE: 280 Seneca Creek Road Seneca, SC 29678-University Facilities Room A251
BID DELIVERY ADDRESSES:
HAND-DELIVERY: MAIL SERVICE:
Attn: Phillip Addington Attn: Phillip Addington
280 Seneca Creek Road Room A251 280 Seneca Creek Road
Seneca, SC 29678 Seneca, SC 29678
IS PROJECT WITHIN AGENCY CONSTRUCTION CERTIFICATION? Yes No
APPROVED BY: DATE: 04/07/2026
(OSE PROJECT MANAGER)

With GovernmentContracts, you can:
...Project Name: Design & Build Services Hangers W & Y at Downtown Airport ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/11/2026
...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Moseley Designs Email...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Mosely... Designs Email: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...Method: Design-Bid-Build Construction Cost Range: $2,800,000 to $3,000,000 Agency Project Coordinator... DESIGN-BID-BUILD CONSTRUCTION ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/19/2026