| Location: | New York |
|---|---|
| Posted: | Oct 2, 2024 |
| Due: | Oct 31, 2024 |
| Agency: | The New York State Contract Reporter |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Description: The work will include the complete removal and replacement of the existing bridge with a concrete three-sided frame structure with the 28-ft long clear-span units. Proposed roadway work will be limited to approach pavement reconstruction to accommodate the new culvert. Due Date: 10/31/2024 2:00 PMContract Term: The Contractor will start the work within ten days of receipt of the written Notice to Proceed issued by the Sponsor. The Contractor shall complete the work no later than November 15, 2025. Location: The work will include the complete removal and replacement of the existing bridge with a concrete three-sided frame structure with the 28-ft long clear-span units. Proposed roadway work will be limited to approach pavement reconstruction to accommodate the new culvert. Ad Type: General
|

With GovernmentContracts, you can:
...: Bureau of Architecture & Engineering Issue date: 6/8/2026 Due date: 6/30/2026 Location: ...
The New York State Contract Reporter
Bid Due: 6/30/2026
...@cityofrochester.gov City of Rochester Department of Environmental Services Bureau of Architecture and Engineering...
City of Rochester
Bid Due: 6/12/2026
...Program: ENGINEERING, DESIGN AND CONSTRUCTION Industry: Professional Services - Architecture.../Engineering EPIN: 82626P0025 Procurement ...
City of New York
Bid Due: 6/26/2026
...Program: Bridges Industry: Professional Services - Architecture/Engineering EPIN: 84126P0015...: Civil Engineering Show / ...
City of New York
Bid Due: 6/18/2026