26-119 IFB Sundust Preserve Well

Location: Missouri
Posted: Oct 23, 2026
Due: Nov 6, 2026
Agency: St. Charles County
Type of Government: State & Local
Category:
  • 13 - Ammunitions and Explosives
Solicitation No: 26-119
Publication URL: To access bid details, please log in.
Bid Number: 26-119
Bid Title: 26-119 IFB Sundust Preserve Well
Category: SCCMO Construction Projects
Status: Open
Publication Date/Time:
10/23/2026 8:00 AM
Closing Date/Time:
11/6/2026 11:00 AM
Related Documents:

Attachment Preview

LEGAL NOTICE

INVITATION FOR FORMAL BID

IFB 26-119

Sundust Preserve Dog Park

Public Water Supply Well

Engineering | Drilling | Pump Installation

ST. CHARLES COUNTY GOVERNMENT DEPARTMENT OF PARKS AND RECREATION ST. CHARLES, MISSOURI

St. Charles County is seeking sealed bids for the design, permitting, drilling, construction, testing, and certification of a public water supply well and associated pumping equipment at Sundust Preserve Dog Park. The County reserves the right to accept and/or reject any and all bids. Bid prices shall be guaranteed for ninety (90) days after the bid opening.

TABLE OF CONTENTS

Use the section headings and page numbers below to navigate this package. Complete and return the forms identified in the Bid Submission Checklist.

Package organization

The Project Requirements and Well Technical Specifications define this project. The County-Contractor Agreement and General Requirements establish the contractual and administrative requirements. The Bid Form provides a common pricing basis for all bidders. Project Exhibits identify the site and applicable wage schedule.

BID INSTRUCTIONS

Submission and opening

Submit two (2) signed copies of the complete Bid in a sealed envelope. Mark one copy "Original." An authorized representative shall sign in blue ink. Mark the envelope "IFB 26-119 Sundust Preserve Dog Park Public Water Supply Well" and show the bid-opening date and time in the lower left corner.

Submit bids to St. Charles County Finance Department, 201 North Second Street, Room 541, St. Charles, Missouri 63301, before the bid-opening deadline.

Bid opening: 11/06/2026 at 11:00AM Central Time, in Room 115/116, St. Charles County Administration Building, 201 North Second Street, St. Charles, Missouri 63301.

Submit complete pricing for the entire well project. Partial bids will not be accepted. The County intends to award one Contract to one responsive, responsible Bidder for the Work.

Bid results and addenda will be posted at . Select the applicable bid and related documents. The time required to post results depends on the complexity and cost of the project. No telephone requests for bid results, please.

Bid inquiries

Submit procurement questions in writing to:

Lenore Moore, Purchasing Coordinator St. Charles County Government, Finance Department 201 North Second Street, St. Charles, Missouri 63301 636-949-7465 |

Submit questions concerning the specifications in writing to:

Jake McDermott, Parks Project Manager St. Charles County Government, Parks Department 201 North Second Street, Room 510, St. Charles, Missouri 63301 | 636-949-7535

Reference the bid number and title on all correspondence. Questions must be received no later than 3:00PM Central Time on 10/29/2026. Questions received after the deadline may not be answered. Responses affecting the solicitation will be issued in writing through addenda. Check the County bid website frequently and acknowledge all addenda on the Bid Form.

Site visit and communications

Interested parties unable to attend may contact Jake McDermott at 636-949-7535 to request a site visit. The County will attempt to accommodate requests but does not guarantee availability. Site visits do not authorize entry into restricted areas or destructive investigation.

Contact with County representatives concerning this solicitation, other than through the procedure described in Bid Inquiries, is prohibited before bid opening. Representatives include elected and appointed officials, County employees, and agents. A Bidder engaging in prohibited communications may be disqualified at the County's sole discretion.

Bid basis and proposed equals

Base the Bid on the specified scope and quantities. Complete the unit-price schedule, lump-sum items, addenda acknowledgment, and required forms. Clearly identify every exception, exclusion, and proposed substitution on the Exceptions and Proposed Equals form; enter "None" if there are no exceptions.

The named pitless assembly establishes the basis of design. Proposed equals shall be supported by drawings, dimensions, materials, compatibility, potable-water suitability, and performance data. Submit requests for pre-bid clarification by the inquiry deadline. No oral statement, vendor quotation, or unaccepted qualification changes the Contract Documents.

Site information

Review the site and the County-issued location/access exhibit before bidding. Verify visible access restrictions, staging needs, utility conflicts, and protection requirements. Conceptual quantities describe the bidding basis; they do not constitute a subsurface investigation or guarantee the geology, water level, water quality, or sustainable yield.

Immediately notify the County of missing information or conflicts that prevent preparation of a common, complete Bid. Changes to the solicitation will be communicated to all bidders by addendum.

BID SUBMISSION CHECKLIST

Before submitting the Bid, confirm that the sealed package contains the following items. Submit the required forms from this package; attach additional sheets where needed.

Two signed copies; one marked "Original."

Completed and signed Bid Form and Unit Price Schedule for the entire well project, including the Total Base Bid.

Bid guaranty equal to 5% of the Total Base Bid.

Acknowledgment of every addendum.

Bidder qualifications, applicable Missouri well/pump contractor credentials, proposed engineering firm, and three references for similar projects completed within the last five years.

Completed Exceptions and Proposed Equals form, including "None" where applicable.

Signed Audit Clause and Vendor Information form.

Anti-Discrimination Against Israel Act certification, when applicable.

Affidavit of Work Authorization and E-Verify documentation, when not current on file with the County.

Domestic Products Procurement Act Exhibit A and supporting information as applicable.

Completed veteran-friendly employment policy response; attach the policy if one exists.

Signed Sample Contract Acknowledgment and General Requirements acceptance.

Authorized signatures in blue ink; prices and notations in blue ink or typewritten.

After award and before construction

The successful Bidder shall execute the Agreement, provide the required performance and payment bonds, certificates of insurance and endorsements, and preconstruction submittals. No field construction may begin before the County's written Notice to Proceed and the required regulatory construction authorization.

TERMS AND CONDITIONS

1. St. Charles County reserves the right to reject any and all bids or parts of a bid and waive technicalities, and to adjust quantities.

2. All bids will be considered final. No additions, deletions, corrections, or adjustments will be accepted after the time of bid opening.

3. All delivery costs or charges must be included in the F.O.B. destination bid price.

4. City, County and State of Missouri Sales Tax and Federal Taxes are not applicable to sales made to St. Charles County and must be excluded.

5. The executed Contract shall remain valid for twelve (12) months after the Notice of Award, and the County may issue the written Notice to Proceed at any time within that period. The 60-consecutive-calendar-day Contract Time begins on the date stated in the Notice to Proceed.

6. The electronic version of this IFB is available upon request. The document was entered into WORD for Microsoft Windows. The Purchasing Office does not guarantee the completeness and accuracy of any information provided on the electronic version. Therefore, respondents are cautioned that the hard copy of this IFB on file in the Purchasing Office governs in the event of a discrepancy between the information contained in or on the electronic version and that which is on the hard copy.

7. Vendors are required to clearly identify any deviations from the specifications in this document.

8. An authorized officer of the company submitting the bid must sign all bids, in blue ink.

9. Vendors must submit two (2) signed copies of their bid; one is to be an original and so marked.

10. All prices and notations must be in blue ink or typewritten on the attached form. Mistakes must be crossed out, corrections typed adjacent and must be initialed in blue ink by the person signing the bid.

11. St. Charles County will not award any bid to an individual or business having any outstanding amounts due from a prior Contract or business relationship with the County or who owes any amount(s) for delinquent Federal, State or Local taxes, fees and licenses.

12. Sealed bids received after the designated time of the receipt of the sealed bids will be considered as "No Bid" and "Void" and will not be opened.

13. The successful bidder is specifically denied the right of using in any form or medium the names of St. Charles County or any other public agency of St. Charles County Government for public advertising unless express written permission is granted.

14. All bidders must possess the necessary and appropriate business and/or professional licenses in their field.

15. Award will be made to the low responsive, responsible Bidder for the entire well project, subject to the County's right to reject any and all bids.

16. The Bid shall include all items solicited. The County intends a single award for the complete Work. Quantity adjustments after award shall be administered in accordance with the Contract Documents.

17. When applicable, provide unit prices and extension prices. Where there is disagreement in the unit and extension prices, the unit price shall govern.

Prevailing wage

The proposal for this Contract shall be based upon the required payment by the Bidder for wages for each craft or type of workmen required to execute the Contract as determined by the Department of Labor and Industrial Relations of Missouri, pursuant to Sections 290.210 to 290.340, RSMo. For those projects with a total cost greater than $75,000.00, a schedule of such prevailing hourly rate of wages as determined by the Department of Labor and Industrial Relations of Missouri, pursuant to said statutory provisions and made a part of this Contract, Annual Wage Order #33 effective May 28th, 2026, shall be used.

Effective August 28, 2018, the provisions of sections 290.210 to 290.340 shall not apply to the construction of public works for which either the engineer's estimate or the bid accepted by the County for the total project is in the amount of $75,000.00 or less. For any awarded bid in the amount of $75,000.00 or less that becomes subject to a contract amendment that increases the total project cost in excess of $75,000.00, the provisions of 290.210 to 290.340 shall apply only to that portion of the project that is in excess of $75,000.00.

The Contractor must comply with all provisions of the Prevailing Wage Law under Annual Wage Order #33 effective May 28, 2026, for this project. The contractor will forfeit a penalty to the County of $100 per day (or portion of a day) if a worker is paid less than the prevailing rate for any work done under the contract by the contractor or by any subcontractor (see section 290.250, RSMo). Certified payroll shall be submitted with request for payment.

The applicable St. Charles County wage determination and its required attachments shall be included in Project Exhibit 2. The Contractor shall furnish the required certified payrolls with each payment request and prevailing-wage affidavits at closeout.

Bonds

Bid guaranty: Provide a deposit equal to five percent (5%) of the Total Base Bid, in the form of a cashier's check, certified check, or bid bond payable to St. Charles County.

Performance and payment security: Provide a performance bond for 100% of the Contract Price and a payment and materials bond for 100% of the Contract Price, in forms acceptable to the County. Sureties shall be authorized to do business in Missouri and approved by the County. Execute the Contract and required bonds in quadruplicate. Include all bond costs in the Base Bid; no separate payment will be made.

Insurance

Worker's Compensation and Employer's Liability: Statutory WC limits as required by the Statutes of the State of Missouri, (or a qualified self-insurer) and Employers Liability in an amount of no less than $1.0 million.

Automobile, General Liability and Property Damage: The Contractor shall maintain the following minimum amounts of automobile, general liability, and property damage insurance coverage during the life of the contract: $1,000,000 for bodily injury or death to any one person and $3,000,000 per occurrence for automobile and general liability coverage; and property damage coverage of at least $1,000,000. A Combined Single Limit Policy in the amount of $3,000,000 is an acceptable alternative. Automobile coverage must include non-owned vehicles.

The Automobile & General Liabilities policies shall be endorsed to include the County as an additional insured and provide for 30 days advance written notice of any material change.

A Waiver of Subrogation in favor of the County shall be endorsed on each of the policies.

The required insurance shall be primary insurance with respect to any other insurance or self- insurance programs maintained by the County.

A Certificate of Insurance evidencing the above coverage(s) together with a copy of the required endorsements shall be provided to the County prior to the commencement of any work.

It shall be the contractor's responsibility to keep the respective insurance policies and coverages current and in force for the life of the contract.

Architects/Design Engineers: Errors and Omissions (Professional Liability): with limits of not less than 1,000,000.000 per claim/$3,000,000.00 aggregate covering all services provided by the Contract. Coverage to be written on a claims-made basis.

Work authorization

As a condition for the award of any contract or grant in excess of five thousand dollars by St. Charles County to a business entity, the business entity shall, by sworn affidavit and provision of documentation, affirm its enrollment and participation in a federal work authorization program (E- Verify) with respect to the employees working in connection with the contracted services. Every such business entity shall sign an affidavit affirming that it does not knowingly employ any person who is an unauthorized alien in connection with the contracted services. [RSMO 285.530 (2)]

An employer may enroll and participate in a federal work authorization program (E-Verify) and shall verify the employment eligibility of every employee in the employer's hire whose employment commences after the employer enrolls in a federal work authorization program. The employer shall retain a copy of the dated verification report received from the federal government. Any business entity that participates in such program shall have an affirmative defense that such business entity has not violated subsection 1 of this section. [RSMO 285.530 (4)]

Any entity contracting with St. Charles County shall only be required to provide the referenced affidavit on an annual basis. A copy of the affidavit is included in this bid request. Vendors may choose to send the required documentation using one of the following options:

Send the notarized affidavit and E-Verify MOU signature page to: St. Charles County, Attn: Purchasing Manager, 201 N Second Street, Room 541, St. Charles, MO 63301 prior to responding to any solicitations; OR

Send the notarized affidavit and E-Verify MOU signature page along with a bid solicitation response.

These documents will be kept on file. The notarized affidavit and E-Verify MOU signature page will remain current for one year from the date of the notarized affidavit.

Acceptable enrollment and participation documentation consists of a valid copy of the signature page of the E- Verify Memorandum of Understanding, completed and signed by the Contractor, and the Department of Homeland Security - Verification Division

Open records

Any and all information contained in or submitted with the bid becomes a public record subject to the Missouri Sunshine Law when the bids are opened. If the bidder believes that any information contained in or submitted with the bid is protected from disclosure by the Missouri Sunshine Law, the bidder must clearly identify what information the bidder believes is so protected and must also clearly identify the legal basis thereof.

Veteran friendly employment policy

Indicate whether you have developed a veteran friendly employment policy and, if so, attach a copy of such policy to your response as a point of information.

"YES" our company has a veteran friendly employment policy.

"NO" our company does not have a veteran friendly employment policy.

Please include a copy of your veteran friendly employment policy with your submission.

PROJECT REQUIREMENTS

1 Project scope and limits

Provide engineering, regulatory coordination, construction authorization, mobilization, drilling, surface and production casing, pressure grouting, development, sampling, pumping tests, pumping equipment, pitless assembly, setting materials, labor, bonds, insurance, restoration, and certification for one public water supply (PWS) well at Sundust Preserve Dog Park.

The Work is limited to the well and pumping installation described in this package. General language requiring a complete installation applies within these stated limits. It does not add the excluded well house, permanent site distribution piping, permanent electrical infrastructure, or engineering for those excluded improvements.

Project location: 400 Foristell Road, New Melle, MO 63365. Proposed well location: Project Exhibit 1.

2 Scope interfaces

Excluded work: well house; permanent site piping; permanent electrical and other site infrastructure; and additional engineering for those excluded improvements.

3 Contract administration

"County" and "Owner" mean St. Charles County, Missouri. "Bidder" means the entity submitting a Bid. "Contractor" means the successful Bidder after execution of the Agreement. "Work" means the services, materials, equipment, and construction within the expressly defined project scope. The County's Representative is the Parks Project Manager or another designated representative.

Read the Contract Documents as complementary. Written amendments and Change Orders govern the matters they modify. Addenda govern the solicitation provisions they modify. The executed Agreement governs contractual terms; project-specific requirements supplement the General Requirements. Approved plans and submittals do not change the Contract Price, Contract Time, or scope without the written authorization required by the Agreement. Refer unresolved conflicts to the County in writing before proceeding with affected Work.

Maintain the 90-day bid-price guarantee stated in the Invitation. Contract Time, the NTP issuance window, liquidated damages, payments, termination, and self-performance are governed by the Agreement. General Requirements govern routine site administration unless supplemented here.

4 Schedule and submittals

Within ten calendar days after the Notice to Proceed, submit a detailed schedule addressing engineering, County review, DNR review, permits, procurement, mobilization, drilling, casing, grouting, development, testing, pump installation, certification, restoration, and closeout. Update the schedule biweekly and identify dependencies on work by others. Obtain written County approval for after-hours testing when a continuous pumping test requires work outside normal hours.

Submit permit-ready well-design documents within 30 calendar days after the Notice to Proceed. Allow ten business days for County review of design documents and routine submittals. Include agency review and correction cycles in the schedule. County review does not transfer professional design responsibility or authorize construction before required permits are issued.

Final Completion shall be achieved within 60 consecutive calendar days after the date stated in the written Notice to Proceed. Contract Time includes design, review, permitting, procurement, construction, testing, correction of deficiencies, and closeout for the well scope.

The CONTRACTOR is expected to work closely with the COUNTY and prioritize this projects schedule as well as coordinate with 3rd party consultants as necessary.

5 Payment and quantity records

Invoices will be paid on a monthly basis. Show original Contract Price, approved changes, current and cumulative measured quantities, prior payments, retainage, and amount due. Withhold five percent (5%) retainage from partial payments, to be released upon County acceptance subject to the Contract Documents and applicable law.

Provide an accepted current schedule, required erosion/discharge controls, and current certified payrolls as conditions of payment. Submit drilling logs, casing records, grouting records, and other quantity support with payment requests for unit-price items. Final payment follows the Agreement and completion of closeout requirements.

6 Site protection and restoration

Before mobilization, document existing conditions of the well site, access routes, pavement, and nearby facilities with dated photographs. Obtain approval of access, staging, equipment setup, temporary facilities, and discharge arrangements. Protect utilities and comply with applicable locating requirements, including private utility coordination.

Provide temporary fencing and barricades around the drill site, open bore, equipment, and other hazards. Keep the well secure and sanitary when unattended. Preserve emergency access and protect park users. Provide the temporary water, power, sanitation, and other facilities necessary for the Work.

Submit an erosion-control and drilling-discharge management plan before ground disturbance. Contain drill cuttings, drilling fluids, grout waste, test water, and disinfection water; provide treatment, dechlorination, hauling, or disposal as required by applicable approvals. Do not discharge to streams, lakes, wetlands, storm sewers, adjacent property, or unapproved areas.

Remove surplus spoil and waste from County property unless the County expressly approves reuse or placement. Repair damage caused by the Work. Restore disturbed grades, drainage, topsoil, seed, mulch, pavement, and other surfaces to the specified condition or, where unspecified, substantially equal to or better than the preconstruction condition.

7 Warranty and closeout

Provide a minimum one-year warranty on materials, equipment, and workmanship beginning at Final Acceptance, unless a longer manufacturer warranty applies. Deliver available longer manufacturer warranties to the County. Correct defective Work in accordance with the Contract Documents. Respond to urgent warranty conditions within 24 hours and routine requests within five business days; participate in an 11-month warranty inspection if requested.

Submit three paper copies and one electronic copy of operation and maintenance information, warranties, and product data. Submit record documents in searchable PDF, and editable CAD files when requested and applicable. Include final well location and elevation, total depth, casing sizes and depths, grout intervals, static/pumping water levels, pump model and setting depth, pump curve, electrical characteristics, and pitless connection details.

Provide drilling and geologic logs; casing and grout records; development and pumping-test data and interpretation; required laboratory results; applicable permit approvals and well/pump certification records; the responsible engineer's completion documentation where required; and outstanding approvals for work by others clearly identified.

Final Completion requires acceptable completion of the contracted well scope, correction of deficiencies, restoration, and submission of required records. The well shall remain secured and shall not supply the public until the County has obtained the required system authorization to dispense water. Well certification alone does not authorize public operation.

WELL TECHNICAL SPECIFICATIONS

1 Design basis

2 Engineering and construction authorization

Provide the engineering report, site evaluation, plans, specifications, calculations, applications, review responses, and professional certification required for the well scope. Confirm the public-water-system classification and applicable DNR standards. Identify well-siting setbacks, sanitary protection, flood exposure, and any conditions that prevent approval of the proposed location.

Obtain the applicable DNR construction permit or written construction authorization before drilling or other regulated construction. Maintain the well and pump contractor permits required for the Work. Coordinate County permits and other approvals applicable to the well scope. Include engineering, application preparation, required filing/certification fees, and review responses in the Bid.

Submit the proposed drilling method, bore and casing profile, surface-casing details, production-casing details, grout mix and placement procedure, wellhead/pitless details, development procedure, sampling plan, pumping-test protocol, and discharge-management plan. Do not substitute conceptual depths for an approved sanitary casing and grouting design.

3 Drilling and casing

Drill one nominal 6-inch production well to the authorized depth using methods suitable for the geology and approved design. Provide enlarged bore sections necessary for casing installation and grouting. Maintain an accurate daily log of depths, formations, water-bearing zones, water levels, drilling interruptions, and unusual conditions. Collect and submit rock samples required by DNR.

Provide the specified surface and production casing quantities for the bidding basis. Furnish new casing of the size, material, wall thickness, joint type, strength, and potable-water suitability required by the approved design. Provide joints, shoes, centralizers, sanitary seals, and other accessories needed for a sound and properly aligned installation.

Coordinate final casing depths with the engineer and DNR. Protect water-bearing formations from surface contamination and cross-contamination. Measure and record the actual installed casing lengths and final casing elevation. Do not conceal casing or grout Work requiring observation until required notification and inspection are complete.

4 Pressure grouting

Pressure grout and cement the production casing over the approved interval, using 560 LF as the bid quantity. Furnish the grout, mixing and placement equipment, labor, tremie or other approved placement system, and records required by the approved procedure. Include surface-casing sealing/grouting requirements in the surface-casing item unless expressly included in the production-grouting interval; do not bill the same work twice.

Submit grout batch/mix records, quantities, placement pressures where applicable, depths, times, and observed returns. Observe approved curing periods before resuming affected operations. Correct grout-placement deficiencies in accordance with the engineer's and DNR's requirements.

5 Development and water sampling

Develop the well using methods compatible with the formation and approved design to remove drilling residues and improve production. Disinfect the well and installed pumping equipment as required by the applicable standards and approved procedures. Provide sampling taps or temporary sampling arrangements suitable for collecting representative samples.

Collect, preserve, transport, and submit all DNR-required rock and water samples. Provide required laboratory analyses, sampling documentation, chain-of-custody records, and reports. The engineer shall identify the required water-quality analytes and acceptance criteria in the approved sampling plan. Notify the County promptly of failed or adverse results; do not represent unaccepted water as suitable for public use.

6 Pumping test

Prepare and obtain acceptance of the pumping-test protocol before testing. Provide the test pump, power, controls, calibrated flow measurement, water-level measurement, piping, labor, and discharge management necessary to complete the required test. Coordinate witnessing and notices with the County, engineer, and DNR.

Conduct the required pumping and recovery test at the rate and duration required by DNR for the approved design. Record the static water level, pump setting, time, discharge rate, pumping water level, drawdown, recovery, and relevant observations. Submit the data and engineer's evaluation, including sustainable yield and recommended pump duty and setting. Obtain written approval before changing the specified design target or installing a different pump.

If yield, water quality, geology, or other conditions require deeper drilling, revised casing/grouting, additional treatment, relocation, or abandonment, promptly notify the County and submit findings and recommendations. Do not proceed with additional work beyond authorized quantities or scope without written authorization under the Agreement.

7 Pump and setting equipment

Provide a complete submersible pumping and setting assembly based on 15 hp, 230 V, and 90 gpm, subject to the confirmed duty point and approved design. Submit manufacturer, model, certified performance curve, efficiency data, motor electrical characteristics, materials, dimensions, check-valve arrangement, and installation requirements. Demonstrate compatibility with the 6-inch well and pitless assembly.

Size and select the pump and motor for the accepted duty point, actual pumping water level, required delivery pressure, friction losses, and operating range. Provide drop pipe, couplings, supports, check valves, cable/support accessories within the confirmed scope, and all setting labor.

8 Pitless assembly and wellhead

Provide one Baker pitless assembly identified conceptually as 6-inch x 5-foot x 3-inch x 3-inch, or an approved equal. Submit the manufacturer's sectional detail and show compatibility with the casing, pump setting assembly, removal equipment, and future waterline connection.

Provide sanitary wellhead construction, cap, vents, seals, casing termination, and fittings required by the approved design. Protect the outlet connection for future work, exclude insects and surface water, and maintain access for removal and servicing of the pump. Provide identification and protective measures required by DNR and the accepted site design.

9 Testing and acceptance records

Demonstrate operation of the installed pump and well components with temporary facilities where permanent infrastructure is not available. Record flow, water levels, voltage/current where applicable, and observed performance. Correct defects attributable to the Contractor's materials, equipment, or workmanship and repeat affected tests as necessary.

Submit the well and pump installation records and certifications required by DNR, applicable laboratory and pumping-test acceptance documentation, and construction completion documentation for the well scope. The Contractor remains responsible for correction of deficiencies in its Work; system-wide approvals involving excluded infrastructure shall be coordinated with the County.

10 Measurement and payment

Pay lump-sum items according to accepted progress under an approved schedule of values. Pay unit-price items using the accepted actual quantities installed within written authorization. The estimated quantities are for bid comparison; the Contract Price is adjusted for authorized increases or decreases using the accepted unit prices and the Agreement's change procedures.

Drilling is measured once by vertical bore depth from ground surface to accepted bottom. Surface and production casing are measured by accepted installed lengths of the respective casing; production grouting is measured by the accepted grouted interval, not by cement volume. Include all associated materials, labor, equipment, overhead, profit, and incidentals in the applicable item. Allocate costs once; do not duplicate mobilization, labor, bonds, insurance, bore enlargement, or grouting between items.

Include bore enlargement required for surface casing in Item 3 and enlargement required for production casing/grout in Item 5. Item 4 includes the nominal production bore. Item 6 includes production-casing pressure grouting. Include required surface-casing sealing in Item 3 unless it is the same work measured under Item 6.

BID FORM AND UNIT PRICE SCHEDULE

IFB 26-119 | Sundust Preserve Dog Park Public Water Supply Well

Bidder legal name ____________________________________________________

The undersigned submits this Bid for the entire Work described in the Contract Documents. Enter a price for every item. "Included" may be entered only for a lump-sum item, identifying the item that carries the cost; a numeric unit price is required for every LF item. LS = lump sum; LF = linear feet.

TOTAL BASE BID including all bonds: $________________________________________________

Total Base Bid in words: __________________________________________________________ ____________________________________________________________________________

The Total Base Bid is the sum of all extended unit-price and lump-sum amounts.

Bid acknowledgment and signature

I have examined the Contract Documents and site information; included all labor, materials, equipment, design, permits, taxes as applicable, bonds, insurance, and incidentals required for the stated scope; and identified exceptions only on the Exceptions and Proposed Equals form. I agree to hold the Bid for ninety (90) days after bid opening and to perform the Work within the Contract Time if awarded the Contract.

I acknowledge receipt of the following addenda. Enter "None" if no addenda were issued.

Company legal name ____________________________________________________

Mailing address ____________________________________________________

City state and ZIP ____________________________________________________

Authorized representative printed name _______________________________________________

Title ____________________________________________________

Authorized signature ____________________________________________________

Date ____________________________________________________

Telephone ____________________________________________________

Email ____________________________________________________

Bid guaranty enclosed: $________________ Type: _________________________________

The County's acceptance of a Bid does not constitute acceptance of undisclosed deviations or unapproved substitutions.

BIDDER QUALIFICATIONS AND EXCEPTIONS

Qualifications

Proposed Missouri well contractor and permit number ____________________________________

Proposed pump installer and permit number ____________________________________________

Proposed engineering firm (if applicable) _______________________________________________

Responsible Missouri professional engineer and license number ____________________________

On-site supervisor and telephone ____________________________________________________

Attach copies of current applicable credentials and a brief description of comparable public water supply well experience. Identify the proposed subcontractors and their scopes. The prime Contractor's self-performance requirement is stated in Article 8 of the Agreement.

Similar project references

Provide three similar projects completed within the last five years. Include a contact who can verify performance, final well depth, and approximate capacity.

Reference 1

Project and location: ___________________________________________________________ Owner/contact: _______________________________________________________________ Phone/email: _________________________________________________________________ Completion year, depth, capacity, and scope: ________________________________________

Reference 2

Project and location: ___________________________________________________________ Owner/contact: _______________________________________________________________ Phone/email: _________________________________________________________________ Completion year, depth, capacity, and scope: ________________________________________

Reference 3

Project and location: ___________________________________________________________ Owner/contact: _______________________________________________________________ Phone/email: _________________________________________________________________ Completion year, depth, capacity, and scope: ________________________________________

Exceptions and proposed equals

List all exceptions, exclusions, qualifications, alternate interpretations, and proposed equals. Identify the affected section, reason, proposed change, and effect on scope, price, and time. Attach technical documentation for proposed equals. Enter "None" if no exceptions or substitutions are proposed.

Section or item: _______________________________________________________________ Exception or proposed equal: ____________________________________________________ ____________________________________________________________________________ Effect on price and time: _________________________________________________________

Section or item: _______________________________________________________________ Exception or proposed equal: ____________________________________________________ ____________________________________________________________________________ Effect on price and time: _________________________________________________________

Section or item: _______________________________________________________________ Exception or proposed equal: ____________________________________________________ ____________________________________________________________________________ Effect on price and time: _________________________________________________________

Authorized signature ____________________________________________________

Date ____________________________________________________

An exception may cause the Bid to be deemed nonresponsive. The County is not bound by an exception or substitution unless expressly accepted in writing.

THIS FORM MUST BE COMPLETED AND ENCLOSED WITH THE BID

Audit Clause for Contracts

Examination of Records

The Contractor's records must include, but not be limited to, accounting records (hard copy, as well as computer readable data), written policies and procedures, subcontractor files, indirect cost records, overhead allocation records, correspondence, instructions, drawings, receipts, vouchers, memoranda, and any other data relating to this contract shall be open to inspection and subject to audit and/or reproduction by the County Auditor, or a duly authorized representative from the County, at the County's expense. The contractor must preserve all such records for a period of three years, unless permission to destroy them is granted by the County, or for such longer period as may be required by law, after the final payment. Since the Contractor is not subject to the Missouri Sunshine Law (Chapter 610, RSMo), information regarding the Contractor's operations, obtained during audits, will be kept confidential.

The Contractor will require all subcontractors under this contract to comply with the provisions of this article by including the requirements listed above in written contracts with the subcontractors.

Vendor Information

Company Name: ___________________________________

Business Address: ______________________________________

Business Hours: ____________________________________

Phone: ___________________________________________

Fax:_____________________________________________

Email address: _____________________________________

Contact Person: ____________________________________

Authorized Signature: ________________________________

(Indicates acceptance of all bid terms and conditions)

Date: ____________________

Anti Discrimination Against Israel Act certification

Pursuant to Section 34.600 of the Revised Statutes of Missouri, St. Charles County shall not enter into a contract to acquire or dispose of services, supplies, information technology, or construction unless the contract includes a written certification that the company is not currently engaged in and shall not, for the duration of the contract, engage in a boycott of goods or services from the State of Israel; companies doing business in or with Israel or authorized by, licensed by, or organized under the laws of the State of Israel; or persons or entities doing business in the State of Israel.

This requirement shall not apply to contracts with a total potential value of less than one hundred thousand dollars or to contractors with fewer than ten employees.

Vendor affirms they have reviewed the requirements and definitions contained in RSMo. 34.600. Vendor hereby certifies they have complied with the terms of RSMo 34.600, as applicable to this agreement, and will comply for the duration of the contract period.

Applicability: Certification applies. Exempt because contract value is below $100,000. Exempt because company has fewer than ten employees.

Vendor ____________________________________________________

Authorized signature ____________________________________________________

Date ____________________________________________________

Veteran friendly employment policy

Indicate whether your company has developed a veteran-friendly employment policy:

YES - attach a copy of the policy. NO - our company does not have such a policy.

THIS FORM MUST BE COMPLETED AND ENCLOSED WITH THE BID

AFFIDAVIT OF WORK AUTHORIZATION

The bidder/contractor who meets the section 285.525, RSMo definition of a business entity must complete and return the following Affidavit of Work Authorization.

Comes now ________________________________________________________________ (Name of Business Entity Authorized Representative) as __________________________________________ (Position/Title), first being duly sworn on my oath, affirm that ________________________________________________________ (Business Entity Name) is enrolled and will continue to participate in the E-Verify federal work authorization program with respect to employees hired after enrollment in the program who are proposed to work in connection with the services related to contract(s) with the County for the duration of the contract(s), if awarded in accordance with subsection 2 of section 285.530, RSMo.

I also affirm that ______________________________________________________________ (Business Entity Name) does not and will not knowingly employ a person who is an unauthorized alien in connection with the contracted services provided to the contract(s) for the duration of the contract(s), if awarded.

In Affirmation thereof, the facts stated above are true and correct. (The undersigned understands that false statements made in this filing are subject to the penalties provided under section 575.040, RSMo.)

Authorized Representative's Signature Printed Name

_____

Title Date

E-Mail Address

Subscribed and sworn to before me this _____________ of ___________________. I am (DAY) (MONTH, YEAR)

commissioned as a notary public within the County of , State of (NAME OF COUNTY)

_______________________, and my commission expires on _________________.

(NAME OF STATE) (DATE)

Signature of Notary Date

Sample Contract Acknowledgment

Sign below to indicate that you have read and agree to the terms of the County-Contractor Agreement included in this package, subject only to exceptions expressly identified in the Bid and accepted by the County in writing. An official Agreement will be signed after award.

Contractor representative printed name _______________________________________________

Title ____________________________________________________

Company ____________________________________________________

Contractor representative signature __________________________________________________

Date ____________________________________________________

The Agreement signature pages are for execution following award. The General Requirements acceptance page shall also be completed and returned with the Bid.

COUNTY-CONTRACTOR AGREEMENT

Sample Form for St. Charles County Park Improvements

Sundust Preserve Dog Park Public Water Supply Well | IFB 26-119

This Agreement, made by and between ____________________________________________, hereinafter called the CONTRACTOR, and St. Charles County, Missouri, hereinafter called the COUNTY.

Now therefore, CONTRACTOR and COUNTY, in consideration of mutual covenants herein set forth, agree as follows:

ARTICLE 1. CONTRACT PRICE

COUNTY shall pay CONTRACTOR in current funds, for completion of the Work designated in Article 2 in accordance with the Contract Documents, an amount equal to the sum established in the CONTRACTOR'S Bid, for the total amount of:

In words: ___________________________________________________________________ ____________________________________________________________________________

In figures: $_________________________________________________________________

For unit-price Work, the final amount due is based on accepted actual quantities at the Contract unit prices, together with accepted lump-sum amounts and authorized adjustments under the Contract Documents.

ARTICLE 2. SCOPE OF THE WORK

The scope of the Work is described in the Project Requirements and Well Technical Specifications for Sundust Preserve Dog Park Public Water Supply Well, IFB 26-119, which are incorporated herein by this reference.

ARTICLE 3. TIME OF COMPLETION

The CONTRACTOR shall commence operations upon receiving the written Notice to Proceed from the COUNTY. The COUNTY may issue the Notice to Proceed at any time within twelve (12) months after the Notice of Award.

The CONTRACTOR shall achieve Final Completion of the Work within sixty (60) consecutive calendar days after the date stated in the written Notice to Proceed. Final Completion means 100% completion of all Work, including correction of deficiencies.

The time of completion is an essential condition of this Contract.

ARTICLE 4. PROGRESS PAYMENT PROCEDURES

CONTRACTOR shall submit Applications for Payment monthly according to "General Requirements" section entitled "Progress Payments". Applications for Payment will be processed by the COUNTY. COUNTY shall make progress payments on account of the Contract Price on the basis of CONTRACTOR'S Applications for Payment as approved by the COUNTY. All progress payments will be on the basis of the progress of the Work measured by the schedule of values, and in the case of Unit Price Work based on the number of units completed. No progress payments will be made if the CONTRACTOR does not have a current progress schedule accepted by the COUNTY.

ARTICLE 4.a. LIQUIDATED DAMAGES

If the contract work is not fully completed according to the terms of the contract within the time limit specified, the contractor shall pay to the County, as liquidated damages, a sum equal to three hundred ($300.00) dollars per day for each calendar day until the job is 100% completed, accepted, and approved by the County.

ARTICLE 5. FINAL PAYMENT AND ACCEPTANCE

When all work provided for under this contract has been completed in conformance with the specifications and requirements of this contract, and accepted without regard to the provisions of guarantee as provided under the terms of this contract, a final cost estimate shall be prepared by the CONTRACTOR and approved by the COUNTY and filed with the COUNTY and with the CONTRACTOR within fifteen (15) days after the date of acceptance of the work as a statement of the amount due the CONTRACTOR. This estimate shall be based on appropriate unit quantities of material placed, including any charges for extra work ordered and properly chargeable under this contract, and deducting any sum properly deductible under this contract.

ARTICLE 6. THE CONTRACT DOCUMENTS

The CONTRACTOR shall provide the COUNTY with 2 full size paper sets of plans at no cost to the COUNTY. Additionally, the CONTRACTOR shall provide the COUNTY with digital plans within 3 business days of the request of the COUNTY and the CONTRACTOR shall send the COUNTY updated digital plans anytime a plan modification is approved.

The Contract Documents which comprise the entire agreement between COUNTY and CONTRACTOR concerning the Work consist of the following:

a. This County-Contractor Agreement.

b. Exhibits to this County-Contractor Agreement, including the General Requirements.

c. Performance and Payment Bonds.

d. Notice of Award.

e. Notice to Proceed.

f. Invitation for Formal Bid, Bid 26-119.

g. County-issued Project Exhibits included with the Invitation for Formal Bid, including the project location/access exhibit and applicable wage determination.

h. Addenda __________ through __________.

i. Accepted Bid Form and Unit Price Schedule and required certifications.

j. All Written Amendments and other documents amending, modifying, or supplementing the Contract Documents, which may be delivered or issued after the Effective Date of the Agreement, and are not attached hereto.

There are no Contract Documents other than those listed in this article. The Contract Documents may be amended, modified, or supplemented only in one or more of the following ways: (i) a Written Amendment; (ii) a Change Order; or (iii) a Work Change Directive.

The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work may be authorized, by a Field Order, or COUNTY'S written interpretation or clarification.

ARTICLE 7. RATES OF PAY

The CONTRACTOR hereby agrees that the prevailing rates of pay shall be paid to skilled and unskilled labor employed under the terms of this contract. The CONTRACTOR shall forfeit to the COUNTY one hundred dollars ($100) for each workman employed, for each calendar day, or portion thereof, such workman is paid less than the said stipulation rates for any work done under said contract, by him or by any subcontractor under him. Annual Wage Order #33 effective May 28, 2026, shall be in effect for this project.

ARTICLE 8. PERFORMANCE OF THE WORK

The CONTRACTOR, acting as an independent contractor, shall furnish all supervision, labor, equipment, tools, materials, and supplies necessary to perform and shall perform all work in accordance with the Contract Documents and any applicable County ordinances, and state and federal laws. CONTRACTOR represents and warrants that he has special skills which qualify him to perform the Work in accordance with the Contract and that he is free to perform all such Work and is not a party to any other agreement, written or oral, the performance of which would prevent or interfere with the performance, in whole or in part, of the Work. The prime CONTRACTOR must perform, with its own organization, contract work amounting to not less than 40% of the total original contract.

ARTICLE 9. SUPERVISION

The CONTRACTOR shall supervise and direct the Work, using the CONTRACTOR'S best skill and attention. The CONTRACTOR shall be solely responsible for and have control over construction means, methods, techniques, sequences, and procedures and for coordinating all portions of the Work under the Contract, unless Contract Documents give other specific instructions concerning those matters.

ARTICLE 10. SAFETY

The COUNTY and any consulting engineer hired by the COUNTY may have personnel on the project site from time to time. All information and/or instructions shall be requested in writing by the CONTRACTOR and responded to in writing. No opinion or instructions will be given to the CONTRACTOR on safety.

The CONTRACTOR shall be solely responsible for the safety on and around the project site including shoring, ladders, drop cords, scaffolding, barricades, construction means, methods, techniques, sequences and procedures.

The CONTRACTOR shall comply with all requirements of Section 292.675 RSMo., as amended, which is incorporated herein by this reference. Said statute relates to the OSHA Construction Safety Program. COUNTY hereby notifies CONTRACTOR that the penalties for failure to comply with the training and all other requirements set forth in said statute include the forfeiture of penalties to COUNTY of two thousand five hundred dollars ($2,500.00) plus one hundred dollars ($100.00) for each employee employed by CONTRACTOR or a subcontractor, for each calendar day, or portion thereof, such employee is employed without the required training.

ARTICLE 11. INDEMNITY

To the fullest extent permitted by law, the CONTRACTOR shall indemnify and hold harmless the COUNTY, any consulting engineer hired by the COUNTY, their consultants, and agents and employees of any of them from and against claims, damages, losses and expenses, including but not limited to attorneys' fees, arising out of or resulting from performance of the Work, provided that such claim, damage, loss or expense is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property other than the Work itself, including loss of use resulting there from, but only to the extent caused in whole or in part by negligent acts or omissions of the CONTRACTOR, a Subcontractor, or anyone directly or indirectly employed by them or anyone for whose acts they may be liable, regardless of whether or not such claim, damage, loss or expense is caused in part by a party indemnified hereunder. Such obligation shall not be construed to negate, abridge, or reduce other rights or obligations of indemnity, which would otherwise exist as to a party or person described in this Section.

In claims against any person or entity indemnified under the above paragraph by an employee of the CONTRACTOR, a Subcontractor, or anyone directly or indirectly employed by them or anyone whose acts they may be liable, the indemnification obligation under this paragraph shall not be limited by a limitation on amount or type of damages, compensation or benefits payable by or for the CONTRACTOR or a Subcontractor under workers' or workmen's compensation acts, disability benefit acts or other employee benefit acts.

The obligations of the CONTRACTOR under this Section shall not extend to the liability of the COUNTY, the COUNTY'S consultants, and agents and employees of any of them arising out of (1) the preparation or approval of maps, drawings, opinions, reports, surveys, Change Orders, designs or specifications, or (2) the giving of or the failure to give directions, after requested in writing by the CONTRACTOR, or instructions by the COUNTY, the COUNTY'S consultants, and agents and employees of any of them provided such instructions or failure to give is the primary cause of the injury or damage.

ARTICLE 12. TERMINATION BY COUNTY OR CONTRACTOR

a. If the CONTRACTOR is adjudged to be bankrupt, or if the CONTRACTOR makes a general assignment for the benefit of creditors, or if a receiver is appointed on account of the CONTRACTOR's insolvency, or if the CONTRACTOR fails, except in cases for which extension of time is provided, to make progress in accordance with the Construction Schedule, or if the CONTRACTOR fails to make prompt payment to Subcontractors or prompt payment for material or labor, or disregards laws, ordinances or the instructions of the COUNTY, or otherwise breaches any provision of the Contract, the COUNTY may, without prejudice to any other right or remedy, terminate the Contract by giving written notice to the CONTRACTOR and his surety. Upon such notification the COUNTY shall be entitled to take possession of the Work and of all materials and equipment thereon and finish the Work by whatever method the COUNTY may deem expedient, which may include, but is not limited to, the COUNTY itself completing the work or the COUNTY hiring others to complete said work. In such case, the CONTRACTOR shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Sum shall exceed the expenses of finishing the Work, including additional engineering, architectural, managerial and administrative expenses, such excess shall be paid to the CONTRACTOR. If such expenses and damages exceed the unpaid balance of the Contract Sum, the CONTRACTOR shall pay the difference to the COUNTY promptly upon demand. In the event of termination pursuant to this paragraph, the CONTRACTOR, upon the request of the COUNTY, shall promptly:

(1) assign to the COUNTY in the manner and to the extent directed by the COUNTY all right, title and interest of the CONTRACTOR under any subcontracts, purchase orders and construction equipment leases to which the CONTRACTOR is a party and which relate to the Work or to construction equipment required therefore, and

(2) make available to the COUNTY to the extent directed by the COUNTY all construction equipment owned by the CONTRACTOR and employed in connection with the Work.

b. Performance of the Work hereunder may be terminated by the COUNTY by giving three (3) days prior written notice to the CONTRACTOR if the COUNTY, in its sole discretion, decides to discontinue or suspend construction. In the event of such termination, as opposed to termination pursuant to paragraph (a) of this Article 12, the Contract Sum shall be reduced in an equitable manner by agreement between the parties.

ARTICLE 13. AUDIT CLAUSE

Examination of Records

The CONTRACTOR's records which shall include, but not be limited to, accounting records (hard copy, as well as computer readable data), written policies and procedures, subcontractor files, indirect cost records, overhead allocation records, correspondence, instructions, drawings, receipts, vouchers, memoranda, and any other data relating to this contract shall be open to inspection and subject to audit and/or reproduction by the County Auditor, or a duly authorized representative from the COUNTY, at the COUNTY's expense.

The CONTRACTOR shall preserve all such records for a period of three years, unless permission to destroy them is granted by the COUNTY, or for such longer period as may be required by law, after the final payment. Since the CONTRACTOR is not subject to the Missouri Sunshine Law (Chapter 610, RSMo), information regarding the CONTRACTOR's operations obtained during audits will be kept confidential.

IN WITNESS WHEREOF the parties hereto have caused this instrument to be executed in four (4) original counterparts as of the day and year last written below. CONTRACTOR:

By:

Date

Name (printed): Title: ATTESTED BY:

Secretary

ST. CHARLES COUNTY, MISSOURI

By:

Steve Ehlmann, County Executive

Date

ATTESTED BY:

County Registrar

CERTIFICATE OF FINANCE DIRECTOR

I certify pursuant to 50.660 RSMo., as amended, that there is a balance otherwise unencumbered to the credit of the appropriation to which this contract is chargeable, and a cash balance otherwise unencumbered in the treasury to the credit of the fund from which payment is to be made, each sufficient to meet this obligation.

Mike Sommer, Finance Director

GENERAL REQUIREMENTS

ST. CHARLES COUNTY PARKS Construction and Maintenance Projects

Standard Parks Project Requirements | September 2026

These General Requirements are incorporated into the County-Contractor Agreement. Project-specific supplements appear in the Project Requirements and Well Technical Specifications.

1. PURPOSE AND APPLICABILITY

These General Requirements apply to construction, repair, maintenance, and improvement projects administered by the St. Charles County Department of Parks and Recreation (COUNTY), to the extent applicable to the Work. The project-specific Bid Specifications, Technical Specifications, Drawings, Addenda, County-Contractor Agreement, and other Contract Documents may supplement or modify these requirements.

For purposes of these General Requirements, CONTRACTOR means the prime contractor responsible for the Work. COUNTY'S REPRESENTATIVE means the Parks Project Manager, other County employee, consulting engineer, architect, inspector, or other person designated by the COUNTY to administer or observe the Work.

If a project-specific requirement directly conflicts with these General Requirements, the project-specific requirement shall govern to the extent of the conflict. The CONTRACTOR shall request written clarification from the COUNTY before proceeding with Work affected by an apparent conflict, discrepancy, ambiguity, or omission.

2. SUMMARY OF WORK

The complete scope of the Work is described in the project-specific Contract Documents and is incorporated into these General Requirements by reference.

Unless specifically stated otherwise, the CONTRACTOR shall furnish all supervision, labor, materials, equipment, tools, transportation, temporary facilities, permits, and incidentals necessary for a complete and functional installation in accordance with the Contract Documents.

3. GENERAL

Where unit-price items are included, St. Charles County reserves the right to add or reduce quantities at the applicable Contract unit price, subject to the terms of the Contract Documents.

Unless a separate pay item is specifically provided, the cost of complying with these General Requirements shall be considered incidental to the Contract Price and no separate payment will be made.

The CONTRACTOR shall perform the Work in a professional and workmanlike manner and shall comply with all applicable federal, state, and local laws, regulations, ordinances, codes, permits, and lawful orders of authorities having jurisdiction.

4. CONTRACT DOCUMENTS, DRAWINGS, AND CLARIFICATIONS

The Drawings and Specifications are intended to be complementary. Work shown or described in one and reasonably required by the other shall be performed as though shown or described in both.

Computed or written dimensions shall take precedence over measurements by scale. Details shown at a larger scale shall take precedence over similar details shown at a smaller scale. The CONTRACTOR shall verify field dimensions and existing conditions before fabrication or installation and shall promptly report discrepancies to the COUNTY.

The CONTRACTOR shall not rely on oral interpretations to change the scope, Contract Price, Contract Time, materials, or quality requirements. Clarifications or changes affecting the Contract shall be documented in writing in accordance with the Contract Documents.

5. RECORD DRAWINGS

When Drawings are provided, the CONTRACTOR shall maintain at the project site a current record set showing material changes from the Contract Drawings as the Work proceeds. Record information shall include the location of concealed or underground improvements where the final location differs from the Contract Drawings.

At closeout, the CONTRACTOR shall provide clean record-drawing markups or other as-built information required by the project-specific Contract Documents. Surveyed or professionally certified record drawings shall be provided when specifically required by the Contract Documents.

6. REFERENCE STANDARDS, CODES, AND LAWS

References to standards, specifications, manuals, or codes of a technical society, organization, association, or governmental authority shall mean the edition in effect on the date Bids are opened, unless a different edition is specifically identified in the Contract Documents or required by law.

Referenced standards do not alter the duties and responsibilities assigned by the Contract Documents and do not transfer responsibility for construction means, methods, techniques, sequences, procedures, or safety to the COUNTY or the COUNTY'S consultants.

7. INSURANCE

The CONTRACTOR shall maintain all insurance required by the Request for Bid, County-Contractor Agreement, and other Contract Documents and shall provide certificates and required endorsements before beginning Work. Coverage shall remain in force for the periods required by the Contract Documents.

The CONTRACTOR is responsible for ensuring that subcontractors maintain insurance appropriate to their Work and any coverage specifically required by the Contract Documents.

8. BONDS

Bid, performance, payment, and materials bonds shall be provided when required by law or the project-specific Contract Documents. Required bond costs shall be included in the Contract Price unless expressly stated otherwise.

Sureties shall be authorized to do business in the State of Missouri and shall otherwise meet the requirements stated in the Contract Documents.

9. PERMITS, LICENSES, AND NOTICES

Unless the Contract Documents specifically state otherwise, the CONTRACTOR shall obtain and pay for permits, licenses, inspections, and approvals required for the CONTRACTOR'S Work. The CONTRACTOR shall maintain all licenses required for the type of Work being performed.

The CONTRACTOR shall give notices required by permits, codes, laws, utility requirements, and the Contract Documents. When Work may interrupt access or utility service, the CONTRACTOR shall coordinate with the COUNTY and provide affected parties reasonable advance notice consistent with applicable requirements.

10. COORDINATION WITH COUNTY AND OTHER CONTRACTORS

Other contractors, utility companies, County crews, park staff, or consultants may be working in or near the project area. The CONTRACTOR shall coordinate its Work to avoid unnecessary interference with others and shall cooperate in arranging access through shared or overlapping work areas.

The CONTRACTOR shall coordinate sequencing, shutdowns, deliveries, closures, inspections, testing, and other activities that could affect County operations or the work of others. The CONTRACTOR shall promptly notify the COUNTY of conflicts that could affect schedule, cost, safety, or quality.

11. CONTRACTOR PERSONNEL AND SUBCONTRACTORS

The CONTRACTOR shall designate a competent on-site supervisor or superintendent who is authorized to receive direction, coordinate the Work, and act on behalf of the CONTRACTOR. Current contact information for the supervisor shall be provided to the COUNTY before mobilization.

The CONTRACTOR is responsible for the acts and omissions of its employees, subcontractors, suppliers, and other persons performing Work under the Contract. Required lists of subcontractors shall be submitted before Work by those subcontractors begins.

If the conduct of CONTRACTOR personnel materially disrupts project progress, safety, park operations, or coordination with the COUNTY and the matter cannot be promptly resolved, the COUNTY may require that the involved personnel be removed from the project, subject to the Contract Documents.

12. SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

Where shop drawings, product data, manufacturer literature, samples, or similar submittals are required, the CONTRACTOR shall submit them to the COUNTY for review before fabrication, purchase, or installation of the affected Work, unless the COUNTY authorizes otherwise in writing.

The CONTRACTOR shall review each submittal for compliance with the Contract Documents before transmitting it to the COUNTY. Each submittal shall identify the applicable specification section, drawing detail, or bid item and shall clearly identify any deviation from the Contract Documents.

COUNTY review does not relieve the CONTRACTOR of responsibility for dimensions, quantities, coordination, fabrication, installation, safety, or compliance with the Contract Documents. The CONTRACTOR remains responsible for the correctness and completeness of submittals prepared by it or its subcontractors and suppliers.

13. SUBSTITUTIONS AND "OR-EQUAL" ITEMS

Materials, products, systems, and equipment identified in the Contract Documents establish the required level of function, quality, performance, compatibility, dimension, and appearance. Proposed substitutions or "or-equal" items shall not be used unless accepted in writing by the COUNTY.

A substitution request shall include sufficient information for evaluation, including manufacturer and model, product data, performance information, test data when applicable, differences from the specified item, and any effect on other Work, cost, schedule, maintenance, or warranty.

The CONTRACTOR shall be responsible for costs resulting from an accepted substitution, including changes required to adjacent Work or work of other trades, unless the COUNTY expressly agrees otherwise in writing.

14. WORK LIMITS, ACCESS, AND PARK OPERATIONS

The CONTRACTOR shall confine operations, equipment, vehicles, materials, and storage to the construction limits and access routes shown or approved by the COUNTY. Use of areas outside those limits requires prior approval from the COUNTY.

The CONTRACTOR shall use access routes and methods that minimize damage to park roads, trails, bridges, lawns, trees, landscaping, natural areas, and existing facilities. Any damage caused by the CONTRACTOR shall be repaired at the CONTRACTOR'S expense to the satisfaction of the COUNTY.

Unless specifically stated otherwise, the CONTRACTOR shall assume that portions of the park outside approved work and closure areas may remain open to the public. The CONTRACTOR shall coordinate closures, detours, deliveries, noisy or disruptive operations, and work affecting special events or programmed activities with the COUNTY.

15. PUBLIC PROTECTION, TRAFFIC CONTROL, SIGNS, AND BARRICADES

The CONTRACTOR shall provide, install, maintain, and remove the signs, barricades, fencing, traffic-control devices, and other measures necessary to keep the public out of active construction areas and to provide safe access around or through the site where required.

Where Work affects public streets, park roads, parking lots, trails, or other vehicular or pedestrian routes, traffic control shall comply with the Contract Documents and applicable requirements, including the current Manual on Uniform Traffic Control Devices where applicable.

Barricades and signs shall remain in place until the affected area is safe for public use. The COUNTY may require additional or relocated traffic-control devices when existing controls are inadequate for site conditions.

16. EXISTING UTILITIES AND PROPERTY

The CONTRACTOR shall protect existing utilities, structures, pavement, trails, fences, signs, site furnishings, landscaping, trees, and other property from damage. The CONTRACTOR shall comply with applicable utility-location requirements before excavation or other work that could affect underground facilities.

The CONTRACTOR shall promptly notify the COUNTY of utilities or conditions encountered that differ materially from the Contract Documents or that create a conflict with the Work. Damage caused by the CONTRACTOR shall be repaired or replaced at the CONTRACTOR'S expense to the satisfaction of the COUNTY and the affected owner.

17. INSPECTIONS

The COUNTY and its authorized representatives shall have access to the Work for inspection and observation at reasonable times, including Work performed by subcontractors and suppliers when inspection is required by the Contract Documents.

The CONTRACTOR shall provide reasonable notice when Work is ready for required inspection and shall not conceal Work that requires inspection until the inspection has occurred or the COUNTY authorizes concealment. Inspection, observation, or acceptance by the COUNTY does not relieve the CONTRACTOR of responsibility for complying with the Contract Documents.

18. TESTING, CERTIFICATIONS, AND DELIVERY TICKETS

The CONTRACTOR shall identify sources of materials and provide certifications, test reports, manufacturer documentation, delivery tickets, truck tickets, or supplier invoices when required by the Contract Documents or reasonably requested by the COUNTY to verify the materials furnished and quantities installed.

The COUNTY may perform testing or retain an independent testing agency for tests identified in the Contract Documents. The CONTRACTOR shall cooperate with testing personnel and provide access, samples, scheduling information, and assistance necessary to complete required testing without avoidable delay.

The CONTRACTOR is responsible for ensuring that required factory, manufacturer, or supplier testing and certifications for prefabricated products and assemblies are complete and submitted when required.

19. LABOR REQUIREMENTS AND JOBSITE POSTINGS

The CONTRACTOR shall comply with applicable federal and state employment and labor requirements. Prevailing-wage requirements, certified payroll requirements, worker eligibility requirements, safety-training requirements, and related provisions shall apply when required by law or the Contract Documents.

The CONTRACTOR shall maintain required jobsite labor, wage, equal employment, and safety postings in a location accessible to employees for the duration required by applicable law.

20. SAFETY AND EMERGENCY PROVISIONS

The CONTRACTOR is responsible for construction means, methods, techniques, sequences, procedures, and site safety and shall comply with applicable Occupational Safety and Health Administration requirements and other safety laws and regulations.

The CONTRACTOR shall maintain immediate access to reliable communication for emergency response. In an emergency, the CONTRACTOR shall first contact the appropriate emergency agency, including 911 when warranted, and shall notify the COUNTY as soon as practical after emergency response has been initiated.

The CONTRACTOR shall maintain emergency access through or around the project site when required by the Contract Documents or reasonably necessary for park operations and public safety.

21. EROSION CONTROL, SPILL PREVENTION, AND ENVIRONMENTAL PROTECTION

The CONTRACTOR shall provide, install, maintain, and remove erosion- and sediment-control measures required by the Contract Documents and applicable local, state, and federal requirements. Where the COUNTY provides an erosion-control plan, the CONTRACTOR shall follow that plan and shall obtain COUNTY approval before making material changes to it.

Excavation and disturbed soils shall be managed to minimize exposure and prevent sediment from leaving the project area or entering drainage systems, streams, lakes, wetlands, or other protected areas. Erosion-control measures shall be maintained until disturbed areas are stabilized.

Fuel, oil, bituminous material, chemicals, concrete washout, and other potential pollutants shall be handled and stored to minimize spills and releases. Spills shall be contained and cleaned up promptly by the CONTRACTOR, and reportable releases shall be reported to the appropriate authorities and the COUNTY as required by law.

22. PROGRESS SCHEDULE

Before or at the preconstruction meeting, the CONTRACTOR shall submit a detailed project schedule for COUNTY review. The schedule shall identify, as applicable:

* Anticipated start and completion dates for major operations and phases of the Work.

* Fabrication, procurement, and delivery periods for long-lead materials and equipment.

* Planned utility interruptions, park closures, traffic switches, or access restrictions.

* Required inspections, testing, owner decisions, and work by others that affect the critical sequence.

* The contractual completion date and any interim milestones stated in the Contract Documents.

The CONTRACTOR shall update the schedule when progress falls behind the accepted schedule, when sequencing materially changes, or when requested by the COUNTY. If progress indicates that timely completion is doubtful, the COUNTY may require the CONTRACTOR to provide a recovery plan consistent with the Contract Documents.

23. PROGRESS REPORTS AND COORDINATION MEETINGS

Unless otherwise specified, the CONTRACTOR shall provide a written progress report at least monthly and with each progress payment request. The report shall summarize Work completed, Work planned for the next reporting period, schedule status, weather or other delays, outstanding submittals or decisions, and issues that could affect cost, schedule, safety, or park operations.

The CONTRACTOR shall attend preconstruction and progress meetings requested by the COUNTY and shall ensure that appropriate subcontractors or suppliers attend when their participation is necessary to resolve project issues.

24. PROGRESS PAYMENTS

Unless otherwise directed by the COUNTY, the CONTRACTOR shall submit progress payment requests monthly. Each request shall be supported by documentation required by the Contract Documents and shall clearly show the current Contract amount, approved Change Orders, value or quantity of Work completed, previous payments, retainage if applicable, and the amount currently requested.

The CONTRACTOR shall keep its project schedule current and shall submit certified payrolls, affidavits, lien waivers, material documentation, or other payment-supporting records when required by the Contract Documents. The COUNTY may withhold or defer payment to the extent permitted by the Contract Documents or law when required documentation is missing or when other grounds for withholding payment exist.

Retainage, payment timing, and final-payment procedures shall be as stated in the County-Contractor Agreement and other Contract Documents.

25. HOURS OF WORK

Unless the project-specific Contract Documents state otherwise or the COUNTY approves different hours in writing, Work shall be performed during the following hours:

* Central Standard Time: 7:00 a.m. to 5:00 p.m., Monday through Friday.

* Central Daylight Time: 6:30 a.m. to 5:30 p.m., Monday through Friday.

The CONTRACTOR shall notify the COUNTY at least 48 hours in advance of planned Saturday Work. No Work shall be performed on Sunday or outside the stated hours without prior written approval from the COUNTY. Project-specific restrictions related to park events, visitor use, noise, or facility operations shall also apply.

26. PROTECTION AND MAINTENANCE DURING CONSTRUCTION

From mobilization through final acceptance, the CONTRACTOR shall protect new and existing Work from damage and shall maintain the project area in a safe and serviceable condition. Damage to Work, utilities, park facilities, roads, trails, landscaping, or other property caused by construction operations shall be repaired or replaced at the CONTRACTOR'S expense to the satisfaction of the COUNTY.

Temporary repairs, access routes, utility cuts, erosion-control measures, barricades, temporary pavement, and other temporary Work shall be maintained for as long as they remain in service.

27. CLEANING AND HOUSEKEEPING

The CONTRACTOR shall remove rubbish, waste, excess material, and debris from the project area regularly and whenever directed by the COUNTY. Work areas, access routes, and areas open to the public shall be maintained in an orderly condition.

At completion, the CONTRACTOR shall remove temporary facilities, surplus materials, construction debris, and equipment and shall leave the site clean, restored, and presentable to the satisfaction of the COUNTY.

28. TEMPORARY FACILITIES AND MATERIAL STORAGE

The CONTRACTOR shall provide temporary sanitary facilities, light, power, water, and other temporary services required for the Work and by applicable health and safety requirements, unless the Contract Documents specifically state that a service will be provided by the COUNTY.

Locations for temporary toilets, field offices, storage containers, staging areas, stockpiles, and material storage shall be approved by the COUNTY before use. The CONTRACTOR shall protect pavement, turf, trails, and other surfaces from damage caused by stored materials, supports, trailers, or equipment.

29. HAULING AND USE OF STREETS, ROADS, AND TRAILS

Streets, park roads, parking lots, trails, and other surfaces used for hauling shall be kept reasonably clean of spilled or tracked material. Material tracked onto routes used by the public shall be removed promptly and, at a minimum, by the end of each workday.

The CONTRACTOR shall obtain hauling permits required by the proper authority and shall comply with posted load and bridge limits and other restrictions governing movement of equipment and materials. Hauling routes and vehicle loads shall be selected to minimize damage to park infrastructure and adjacent property.

30. PROJECT SURVEYS AND LAYOUT

When survey staking, construction layout, or as-built survey information is required, the CONTRACTOR shall provide it at its own cost unless the Contract Documents specifically state otherwise. Survey work shall be performed by personnel qualified for the type of layout or certification required.

The CONTRACTOR shall provide the COUNTY reasonable advance notice before establishing control, staking work that will be used to verify quantities, or performing survey work that the COUNTY or its consultant is expected to observe. Five business days' notice shall be provided when specifically required by the project.

31. CUTTING, PATCHING, AND RESTORATION

The CONTRACTOR shall perform cutting, fitting, patching, and restoration necessary to connect new Work with existing conditions as shown or reasonably implied by the Contract Documents. The CONTRACTOR shall not damage or alter the work of others without prior coordination and approval.

Surfaces disturbed by the Work, including pavement, concrete, turf, landscaping, fencing, utilities, and site features, shall be restored as required by the Contract Documents and, where no specific standard is stated, to a condition substantially equal to or better than the condition existing before construction.

32. WORK IN EXISTING DRAINAGE AREAS

The CONTRACTOR shall plan and perform the Work so that existing overland and piped storm-water drainage is not unnecessarily interrupted or obstructed. Existing and new inlets, culverts, channels, swales, pipes, and other drainage facilities shall be kept free of construction debris and material that could restrict flow.

Excavations, stockpiles, borrow areas, and embankments shall be managed to reduce the risk of erosion, flooding, or sediment transport during storm events. Temporary drainage or pumping needed to perform the Work shall be provided by the CONTRACTOR unless otherwise stated.

33. CHANGES IN THE WORK AND EXTRA WORK

The CONTRACTOR shall promptly notify the COUNTY in writing of conditions or directions that the CONTRACTOR believes will change the Contract Price, Contract Time, or scope of Work. Except for immediate action reasonably necessary to protect life or property, the CONTRACTOR shall not proceed with Work it considers extra or outside the Contract without written direction or authorization in accordance with the Contract Documents.

Oral discussions, field conversations, review comments, or inspection observations do not by themselves authorize an increase in Contract Price or Contract Time. Change Orders, written amendments, work change directives, field orders, or other written instruments shall be used as provided by the Contract Documents.

34. USE OF ST. CHARLES COUNTY NAME IN ADVERTISING

The CONTRACTOR shall not use the name, seal, logo, photographs, or endorsement of St. Charles County or the St. Charles County Department of Parks and Recreation in advertising, promotional materials, or public statements in a manner that implies County endorsement without prior written permission from the COUNTY.

35. PROJECT SUBMITTALS AND CLOSEOUT

The following lists are intended as a general checklist and are not all-inclusive. The CONTRACTOR shall submit the items required by the project-specific Contract Documents and all items necessary to demonstrate complete and acceptable Work.

35.1 Typical Preconstruction Submittals

* Executed County-Contractor Agreement and required bonds.

* Certificates of insurance and required endorsements.

* Project schedule and, when applicable, a schedule of values.

* List of subcontractors and contact information for the on-site supervisor.

* Submittal register and required shop drawings, product data, samples, and material certifications.

* Required permits and inspection information.

* Erosion-control, traffic-control, access, safety, or other project-specific plans when required.

* Emergency contact information and planned utility shutdown or closure information when applicable.

35.2 Typical Closeout and Final-Payment Submittals

* Completion of final inspection and correction of punch-list or deficiency items.

* Final approvals or sign-offs from agencies having jurisdiction when required.

* Record drawings, as-built markups, survey information, or other record documentation required by the Contract Documents.

* Operation and maintenance information, warranties, manufacturer certifications, test reports, and training records when applicable.

* Prevailing-wage affidavits, certified payroll documentation, or other labor closeout records when applicable.

* Final lien waivers or releases and settlement-of-claims documentation required by the Contract Documents.

* Final payment request and supporting quantity, invoice, or schedule-of-values documentation.

* Return of keys, access devices, spare materials, attic stock, or County property furnished for the Work, when applicable.

* Final cleanup, removal of temporary facilities, and restoration of disturbed areas.

Final payment may be withheld until required closeout documentation is complete and the Work has been accepted by the COUNTY in accordance with the Contract Documents.

Acceptance of General Requirements

The Contractor shall sign below indicating acceptance of these General Requirements, as supplemented by the project-specific Contract Documents.

Name ____________________________________________________

Company ____________________________________________________

Date ____________________________________________________

Signature ____________________________________________________

Component Well Contractor scope County or separate contract
Engineering and permits Well and pump design; applications, review responses, and required well construction authorization. System-wide/site infrastructure design and approvals outside the well scope.
Well and pump Bore, casing, grout, development, downhole pump and setting assembly, pitless assembly, wellhead protection. Distribution system beyond the defined connection.
Permanent water connection Terminate and protect the pitless outlet at the well; furnish connection data. Permanent piping from the pitless outlet to park facilities.
Power and controls Pump cable termination, controls, and motor protection Permanent electrical service, feeders, and site electrical infrastructure, except specifically included equipment.
Testing Temporary power, temporary controls, test pumping, sampling, discharge management, and test documentation. Future integrated system startup after excluded infrastructure is complete.
Public operation Well completion/certification records and assistance for the well portion of approvals. System Permit to Dispense and readiness of the complete park water system.
Component Base bid quantity or characteristic
Surface casing 100 linear feet (LF);
Drilling 1,100 LF total well depth; nominal 6-inch well.
Production casing 560 LF of nominal 6-inch casing; material and wall thickness per approved design.
Pressure grouting 560 LF of cement pressure grouting associated with production casing.
Pumping equipment 15 horsepower; 230 volts; 90 gallons per minute (gpm) conceptual duty.
Pitless assembly Baker 6-inch x 5-foot x 3-inch x 3-inch assembly, or approved equal.
Setting material Complete for the approved pump setting and well configuration.
Regulatory work Engineering, DNR construction authorization, rock/water samples, pump test, and required certification.
No. Description Qty Unit Unit price Amount
1 Engineering and DNR well construction authorization/permitting 1 LS - $________
2 Mobilization, demobilization, site controls, cleanup and restoration 1 LS - $________
3 Surface casing complete, including required enlargement and sealing 100 LF $________ $________
4 Nominal 6-inch well drilling, total bore depth 1,100 LF $________ $________
5 6-inch production casing complete, including required enlargement 560 LF $________ $________
6 Production casing cement pressure grouting 560 LF $________ $________
7 Well development, disinfection, DNR rock and water samples and laboratory testing 1 LS - $________
8 DNR pumping/recovery test and reporting, including temporary facilities 1 LS - $________
9 15 hp, 230 V, 90 gpm pumping equipment within specified scope 1 LS - $________
10 6" x 5' x 3" x 3" Baker Pitless Adapter 1 LS - $________
11 Setting materials and pump installation labor complete 1 LS - $________
12 DNR certification, record documents, startup demonstration and closeout 1 LS - $________
13 Performance and Payment Bond 1 LS __ $________
Addendum number Date Addendum number Date
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Brand Name National Stock Numbers: Industry Feedback Request Active Contract Opportunity Notice

GENERAL SERVICES ADMINISTRATION

Bid Due: 2/12/2027

WTP Pipe Gallery Replacement - St. Charles County, MO 25-004 StatusAccepting Bids Prebid

Drexel Technologies

Bid Due: 11/18/2026

Western Transmission Main Phase 4C 22-008 StatusAccepting Bids Prebid Date 10/20/26 10:00am Bid

Drexel Technologies

Bid Due: 11/19/2026

Western Transmission Main Phase 4C 22-008 StatusAccepting Bids Prebid Date 10/20/26 10:00am Bid

Drexel Technologies

Bid Due: 11/19/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.