Construction of B-21 Radio Frequency (RF) Hangar
| Location: |
Missouri |
| Posted: |
Apr 8, 2026 |
| Due: |
Jun 15, 2026 |
| Agency: |
DEPT OF DEFENSE |
| Type of Government: |
Federal |
| Category: |
- Y - Construction of Structures and Facilities
|
| Solicitation No: |
W912DQ26RA019 |
| Publication URL: |
To access bid details, please log in. |
Construction of B-21 Radio Frequency (RF) Hangar
Active
Contract Opportunity
Related Notice
W912DQ26RA019
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
US ARMY CORPS OF ENGINEERS
Sub Command
ENGINEER DIVISION NORTHWESTERN
Sub Command 2
ENDIST KANSAS CITY
Office
W071 ENDIST KANSAS CITY
Looking for contract opportunity help?
General Information View Changes
-
Contract Opportunity Type: Solicitation (Updated)
-
Updated Published Date: Apr 08, 2026 03:15 pm CDT
-
Original Published Date: Apr 01, 2026 03:16 pm CDT
-
Updated Date Offers Due: Jun 15, 2026 03:00 am CDT
-
Original Date Offers Due: Jun 15, 2026 03:00 am CDT
-
Inactive Policy: Manual
-
Updated Inactive Date: Jul 15, 2026
-
Original Inactive Date:
Apr 19, 2026
-
Initiative:
Classification
Description View Changes
CONTRACT INFORMATION: The U.S. Army Corps of Engineers (USACE) Kansas City District (NWK) intends solicit, negotiate, and award a one-time Unrestricted, Firm-Fixed-Price, Design-Bid-Build, construction contract to construct a Radio Frequency/Measurements Hangar Facility with one aircraft position and all associated back shops, material storage, and administrative and facility support spaces. at Whiteman Air Force Base (WAFB), MO. Scope of Work: The scope of this contract is to construct a Radio Frequency/Measurements Hangar Facility with one aircraft position and all associated back shops, material storage, and administrative and facility support spaces. The facility will consist of both unclassified and classified spaces for a total square footage of 5,345 square meter (57,532 square feet). Structure will feature a new reinforced concrete foundation by replacing the paved area east of the existing Phase Hangar (Building 9), a metal roof, metal siding panels on steel framing and girts above a masonry cavity wall and Concrete Masonry Unit wall assembly around the base of the facility, and powered steel sliding hangar doors. The project will also include supporting facilities such as utilities, pavements, site improvements, and other necessary infrastructure to have a complete and usable facility. Amendment 0003: Includes changes highlighted red in document titled, (Solicitation W912DQ26RA019_WAFB_RF HANGAR_RTA revised 08Apr2026), and inclusion of Attachment A, Attachment A_B-21 RF_ Site Visit_EAL all secure entry 26_Name. Primary changes are to Site Visit Information to provide additional instructions on submitting entry authorization letter (EAL) form for Whiteman Air Force Base. Site visit request are now due on 16 April 2026.
Attachments/Links
Contact Information View Changes
Contracting Office Address
-
CONTRACTING DIV CORPS OF ENGINEERS 601 E 12TH ST
-
KANSAS CITY , MO 64106-2896
-
USA
Secondary Point of Contact
History
Related Document
| Nov 13, 2025 | [Sources Sought (Original)] Project Labor Agreement (PLA) for Construction of B-21 Radio Frequency (RF) Hangar, Whiteman AFB |
| Mar 18, 2026 | [Presolicitation (Original)] Construction of B-21 Radio Frequency (RF) Hangar |
| Apr 1, 2026 | [Solicitation (Original)] Construction of B-21 Radio Frequency (RF) Hangar |
| Apr 2, 2026 | [Solicitation (Updated)] Construction of B-21 Radio Frequency (RF) Hangar |
| Apr 3, 2026 | [Solicitation (Updated)] Construction of B-21 Radio Frequency (RF) Hangar |
| May 5, 2026 | [Solicitation (Updated)] Construction of B-21 Radio Frequency (RF) Hangar |
| May 29, 2026 | [Solicitation (Updated)] Construction of B-21 Radio Frequency (RF) Hangar |
| Jun 4, 2026 | [Solicitation (Updated)] Construction of B-21 Radio Frequency (RF) Hangar |
| Jun 11, 2026 | [Solicitation (Updated)] Construction of B-21 Radio Frequency (RF) Hangar |
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
See also
Butterfly Trail Retention Basin Department: Parks and Recreation Deadline: July 28, 2026 at
Grain Valley city
Bid Due: 7/28/2026
Follow Z--JEFF REPLACE COOLING TOWER AND BOILERS Active Contract Opportunity Notice ID 140P6026B0003
INTERIOR, DEPARTMENT OF THE
Bid Due: 7/24/2026
Follow Former General Leonard Wood Army Community Hospital Demolition, Optical Fabrication Laboratory, with
DEPT OF DEFENSE
Bid Due: 7/23/2026
Follow ALASKA TWO POINT FIVE TON ENVIRONMENTAL CONTROL UNIT Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 7/20/2026
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.