| Location: | California |
|---|---|
| Posted: | Oct 15, 2025 |
| Due: | Oct 23, 2025 |
| Agency: | City of South San Francisco |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | st2401, Bid No. 2705 |
| Publication URL: | To access bid details, please log in. |
Project ID: st2401, Bid No. 2705
Title: Curb Ramps & Street Intersection Improvements, Project No. st2401, Bid No. 2705
Addenda: 1
Release Date: 9/23/2025
Due Date: 10/23/2025
General work description: The work consists of mobilization and demobilization; clearing, grubbing, and environmental protection; public posting and notification; traffic regulation and construction area signs; utility potholing; thermoplastic marking & striping removal; sanitary sewer cleanout, water meter, water valve, and miscellaneous utility box adjustments to grade; existing arch culvert, and existing storm inlet removal; storm drain pipe, City standard Type G0 and G5 curb inlet, and City standard storm drain manhole installation; asphalt concrete surface removal; City standard curb, gutter, sidewalk, stamped concrete, driveway, and reinforced valley gutter installation; ADA compliant curb ramps and retrofit detectable warning surface at existing curb ramps; roadway pavement subgrade preparation; asphalt concrete pavement; deep lift AC plug; curb paint, thermoplastic markings; install sign & post; site clean-up and removal of any remaining construction materials or debris, sweeping, removal of any and all traffic regulation and construction area signs; and removal of all environmental protection in South San Francisco, CA at the intersection of Miller Avenue and Chestnut Avenue, Grand Avenue and Orange Avenue, and Randolph Avenue and Madrone Avenue.

With GovernmentContracts, you can:
...Project Details ID: PW 04-14 Name: Energy Efficient Lighting Retrofit for Hall of ...
Napa County
Bid Due: 2/24/2205
...McKee Fisk Anthropology Research Lab Retrofit Project No. 83Details Event ID 0000039271 Format...
State Government of California
Bid Due: 6/25/2026
...GFO-25-305 - Non-Energy Impacts of Integrated Energy Retrofit Packages from the Equitable Building... ...
California Energy Commission
Bid Due: 7/10/2026
...Project: Golden Gate Suspension Bridge Seismic Retrofit Contract 1 North and South Towers... ...
Golden Gate Bridge, Highway and Transportation District
Bid Due: 6/09/2026