| Location: | California |
|---|---|
| Posted: | Mar 17, 2026 |
| Due: | Apr 2, 2026 |
| Agency: | Marin County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Improvements for this project will generally include replacing crosswalk striping, sections of concrete curb and gutter, asphalt grinding/milling, hot mix asphalt plugs and fill, sidewalk, and accessible curb ramps. Improvements shall also generally include the removal and relocation of a catch basin and street signs, utility adjustments, and the new installation of a storm drain pipe, manhole, and concrete island medians with accessible curb ramps. The work will take place on minor arterial, major collector, and local roads in San Rafael and Kentfield as follows:
Road Name Limit of Improvements Miller Creek Rd Intersection of Miller Creek Rd & Las Gallinas Ave
Kent Ave Intersection of Stadium Way
See 41EG2514 2025-14 ADA Improvement Project for full details.

With GovernmentContracts, you can:
..., chipping, and shaping of trees, high voltage line clearing, tree safety inspections, ...
State Government of California
Bid Due: 9/21/2026
...: Construction Services Project description: This project generally consists of grinding and paving...
Marin County
Bid Due: 9/22/2026
...: The work to be done includes, but is not limited to the ...
City of Wasco
Bid Due: 9/25/2026
...for the rehabilitation of asphalt concrete roadways utilizing a combination of treatments including ...
City of Morro Bay
Bid Due: 9/29/2026