| Location: | Texas |
|---|---|
| Posted: | Jun 11, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Contract: | Awards |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA301625P0160 |
| Publication URL: | To access bid details, please log in. |
The requirement to remove and replace Cooling Tower Fill at B498 JBSA Randolph was awarded to Arabic Interpreters LLC doing business as MZ Federal LLC on 09 Jun 2025. The awarded amount was $149,628.00. The requirement includes the use of Evapco products. The exclusive use of Evapco products for replacing Cooling Tower Fill located on B498 at JBSA Randolph AFB is justified due to critical compatibility and performance requirements. Evapco's Cooling Tower Fill is a direct replacement, ensuring seamless integration with the existing infrastructure, minimizing costly modifications and project delays. Attached is a detailed brand name justification for the use of the Evapco fills.

With GovernmentContracts, you can:
...fleet, updated fuel infrastructure is now required. To meet these operational demands, two ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 6/12/2026
...fleet, updated fuel infrastructure is now required. To meet these operational demands, two ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 6/12/2026
...fleet, updated fuel infrastructure is now required. To meet these operational demands, two ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 6/12/2026
...fleet, updated fuel infrastructure is now required. To meet these operational demands, two ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 6/12/2026