ADDENDUM NO. 1
RIVERWALK WEST FINAL PHASE
BID #26-012
PAWTUCKET, RI
PAWTUCKET, RHODE ISLAND
DEPARTMENT OF PUBLIC WORKS
250 ARMISTICE BOULEVARD
PAWTUCKET, RHODE ISLAND
ISSUED: May 7, 2026

Addendum #1 -May 7, 2026
RIVERWALK WEST FINAL PHASE
BID #26-012
Pawtucket, RI
The attention of bidders submitting proposals for the above-referenced project is
called to the following Addendum to the Request for Proposals indicated above. The
items set forth herein, whether of omission, addition, substitution or other change,
are all to be included in, and form a part of the proposed Contract Documents for
the work.
Inclusion of this Addendum must be acknowledged in the spaces provided in the
document entitled "Request for Proposals Bid #26-012; Riverwalk West Final
Phase". Failure to acknowledge any and all addenda in the above specified bid
form may be cause for rejection of the bids by the Owner on the grounds that it is
not responsive.
This Addendum consists of two (2) pages and two (2) attachments, (13 pages),
for a total of 15 pages.
1. UPDATES TO REQUEST FOR PROPOSALS
* Section 1.0 - Bid Solicitation Information
* Change request for information deadline to Thursday May 14, 2026 at
2:00pm
* Change RFP Submission Deadline to May 28, 2026 at 12:00pm (noon).
* Appendix D - Federal Labor Standards Provisions - Form HUD 4010
* Delete entire Appendix D - Federal Labor Standards Provisions - Form
HUD 4010 (06/2022) and replace with the attached HUD form 4010
(10/2023) in its entirety
ATTACHMENTS:
A. Sign-In Sheet (2 total pages including 1 fly sheet)
B. Federal Labor Standards Provisions - Form HUD 4010 rev 10/2023 (11 total
pages, including 1 fly sheet)
Please contact Michael Wilcox (401-728-0500 ext 447), City of Pawtucket,
with any questions.
Addendum #1 - 26-012-Riverwalk West Final Phase
U p d a te s: 1o f 1

Attachment A: Sign-In Sheet

Attachment B: B. Federal Labor Standards Provisions
- Form HUD 4010 (Revised)

Attachment B: B. Federal Labor Standards Provisions
- Form HUD 4010 (Revised)

HUD-4010 U.S. Department of Housing and Urban Development
Federal Labor Standards Provisions Office of Davis-Bacon and Labor Standards
A. APPLICABILITY
The Project or Program to which the construction work covered by this Contract pertains is being
assisted by the United States of America, and the following Federal Labor Standards Provisions are
included in this Contract pursuant to the provisions applicable to such Federal assistance.
1. Minimum wages and fringe benefits
i. All laborers and mechanics employed or working upon the site of the work (or otherwise working in
construction or development of the project under a development statute), will be paid
unconditionally and not less often than once a week, and without subsequent deduction or rebate
on any account (except such payroll deductions as are permitted by regulations issued by the
Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of basic hourly wages
and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at
rates not less than those contained in the wage determination of the Secretary of Labor which is
attached hereto and made a part hereof, regardless of any contractual relationship which may be
alleged to exist between the contractor and such laborers and mechanics. As provided in 29 CFR
5.5(d) and (e), the appropriate wage determinations are effective by operation of law even if they
have not been attached to the contract. Contributions made or costs reasonably anticipated for bona
fide fringe benefits under the Davis-Bacon Act (40 U.S.C. 3141(2)(B)) on behalf of laborers or
mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of
paragraph (a)(1)(v) of these contract clauses; also, regular contributions made or costs incurred for
more than a weekly period (but not less often than quarterly) under plans, funds, or programs which
cover the particular weekly period, are deemed to be constructively made or incurred during such
weekly period. Such laborers and mechanics must be paid the appropriate wage rate and fringe
benefits on the wage determination for the classification(s) of work actually performed, without
regard to skill, except as provided in 29 CFR 5.5(a)(4). Laborers or mechanics performing work in
more than one classification may be compensated at the rate specified for each classification for the
time actually worked therein: Provided, That the employer's payroll records accurately set forth the
time spent in each classification in which work is performed. The wage determination (including any
additional classifications and wage rates conformed under 29 CFR 5.5(a)(1)(iii)) and the Davis-Bacon
poster (WH-1321) must be posted at all times by the contractor and its subcontractors at the site of
the work in a prominent and accessible place where it can be easily seen by the workers.
ii. Frequently recurring classifications
A. In addition to wage and fringe benefit rates that have been determined to be prevailing under
the procedures set forth in 29 CFR part 1, a wage determination may contain, pursuant to 1.3(f),
wage and fringe benefit rates for classifications of laborers and mechanics for which conformance
requests are regularly submitted pursuant to 29 CFR 5.5(a)(1)(iii), provided that:
1. The work performed by the classification is not performed by a classification in the wage
determination for which a prevailing wage rate has been determined;
2. The classification is used in the area by the construction industry; and
3. The wage rate for the classification bears a reasonable relationship to the prevailing wage rates
contained in the wage determination.
B. The Administrator will establish wage rates for such classifications in accordance with 29 CFR
5.5(a)(1)(iii)(A)(3). Work performed in such a classification must be paid at no less than the wage
and fringe benefit rate listed on the wage determination for such classification.
iii. Conformance
A. The contracting officer must require that any class of laborers or mechanics, including helpers,
which is not listed in the wage determination and which is to be employed under the contract be
Previous editions obsolete 1 Form HUD-4010, (10/2023)
ref. Handbook 1344.1

classified in conformance with the wage determination. Conformance of an additional classification
and wage rate and fringe benefits is appropriate only when the following criteria have been met:
1. The work to be performed by the classification requested is not performed by a classification in
the wage determination; and
2. The classification is used in the area by the construction industry; and
3. The proposed wage rate, including any bona fide fringe benefits, bears a reasonable
relationship to the wage rates contained in the wage determination.
B. The conformance process may not be used to split, subdivide, or otherwise avoid application of
classifications listed in the wage determination.
C. If the contractor and the laborers and mechanics to be employed in the classification (if known),
or their representatives, and the contracting officer agree on the classification and wage rate
(including the amount designated for fringe benefits where appropriate), a report of the action
taken will be sent by the contracting officer by email to DBAconformance@dol.gov. The
Administrator, or an authorized representative, will approve, modify, or disapprove every
additional classification action within 30 days of receipt and so advise the contracting officer or
will notify the contracting officer within the 30-day period that additional time is necessary.
D. In the event the contractor, the laborers or mechanics to be employed in the classification or
their representatives, and the contracting officer do not agree on the proposed classification
and wage rate (including the amount designated for fringe benefits, where appropriate), the
contracting officer will, by email to DBAconformance@dol.gov, refer the questions, including
the views of all interested parties and the recommendation of the contracting officer, to the
Administrator for determination. The Administrator, or an authorized representative, will issue
a determination within 30 days of receipt and so advise the contracting officer or will notify
the contracting officer within the 30-day period that additional time is necessary.
E. The contracting officer must promptly notify the contractor of the action taken by the Wage
and Hour Division under 29 CFR 5.5 (a)(1)(iii)(C) and (D). The contractor must furnish a written
copy of such determination to each affected worker or it must be posted as a part of the wage
determination. The wage rate (including fringe benefits where appropriate) determined
pursuant to 29 CFR 5.5 (a)(1)(iii)(C) or (D) must be paid to all workers performing work in the
classification under this contract from the first day on which work is performed in the
classification.
iv. Fringe benefits not expressed as an hourly rate
Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics
includes a fringe benefit which is not expressed as an hourly rate, the contractor may either pay the
benefit as stated in the wage determination or may pay another bona fide fringe benefit or an hourly
cash equivalent thereof.
v. Unfunded plans
If the contractor does not make payments to a trustee or other third person, the contractor may
consider as part of the wages of any laborer or mechanic the amount of any costs reasonably
anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the
Secretary of Labor has found, upon the written request of the contractor, in accordance with the
criteria set forth in 29 CFR 5.28, that the applicable standards of the Davis-Bacon Act have been met.
The Secretary of Labor may require the contractor to set aside in a separate account assets for the
meeting of obligations under the plan or program.
vi. Interest In the event of a failure to pay all or part of the wages required by the contract, the
contractor will be required to pay interest on any underpayment of wages.
Previous editions obsolete 2 Form HUD-4010, (10/2023)
ref. Handbook 1344.1

2. Withholding
i. Withholding requirements
The U. S. Department of Housing and Urban Development may, upon its own action, or must, upon
written request of an authorized representative of the Department of Labor, withhold or cause to be
withheld from the contractor so much of the accrued payments or advances as may be considered
necessary to satisfy the liabilities of the prime contractor or any subcontractor for the full amount
of wages and monetary relief, including interest, required by the clauses set forth in 29 CFR 5.5(a)
for violations of this contract, or to satisfy any such liabilities required by any other Federal
contract, or federally assisted contract subject to Davis-Bacon labor standards, that is held by the
same prime contractor (as defined in 29 CFR 5.2). The necessary funds may be withheld from the
contractor under this contract, any other Federal contract with the same prime contractor, or any
other federally assisted contract that is subject to Davis-Bacon labor standards requirements and is
held by the same prime contractor, regardless of whether the other contract was awarded or
assisted by the same agency, and such funds may be used to satisfy the contractor liability for which
the funds were withheld. In the event of a contractor's failure to pay any laborer or mechanic,
including any apprentice or helper working on the site of the work (or otherwise working in
construction or development of the project under a development statute) all or part of the wages
required by the contract, or upon the contractor's failure to submit the required records as
discussed in 29 CFR 5.5(a)(3)(iv), HUD may on its own initiative and after written notice to the
contractor, sponsor, applicant, owner, or other entity, as the case may be, take such action as may
be necessary to cause the suspension of any further payment, advance, or guarantee of funds until
such violations have ceased.
ii. Priority to withheld funds
The Department has priority to funds withheld or to be withheld in accordance with 29 CFR
5.5(a)(2)(i) or (b)(3)(i), or both, over claims to those funds by:
A. A contractor's surety(ies), including without limitation performance bond sureties and
payment bond sureties;
B. A contracting agency for its reprocurement costs;
C. A trustee(s) (either a court-appointed trustee or a U.S. trustee, or both) in bankruptcy of a
contractor, or a contractor's bankruptcy estate;
D. A contractor's assignee(s);
E. A contractor's successor(s); or
F. A claim asserted under the Prompt Payment Act, 31 U.S.C. 3901-3907.
3. Records and certified payrolls
i. Basic record requirements
A. Length of record retention. All regular payrolls and other basic records must be maintained by
the contractor and any subcontractor during the course of the work and preserved for all
laborers and mechanics working at the site of the work (or otherwise working in construction
or development of the project under a development statute) for a period of at least 3 years
after all the work on the prime contract is completed.
B. Information required Such records must contain the name; Social Security number; last known
address, telephone number, and email address of each such worker; each worker's correct
classification(s) of work actually performed; hourly rates of wages paid (including rates of
contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of
the types described in 40 U.S.C. 3141(2)(B) of the Davis-Bacon Act); daily and weekly number of
hours actually worked in total and on each covered contract; deductions made; and actual
wages paid.
C. Additional records relating to fringe benefits. Whenever the Secretary of Labor has found
under 29 CFR 5.5(a)(1)(v) that the wages of any laborer or mechanic include the amount of any
Previous editions obsolete 3 Form HUD-4010, (10/2023)
ref. Handbook 1344.1

costs reasonably anticipated in providing benefits under a plan or program described in 40
U.S.C. 3141(2)(B) of the Davis-Bacon Act, the contractor must maintain records which show that
the commitment to provide such benefits is enforceable, that the plan or program is financially
responsible, and that the plan or program has been communicated in writing to the laborers or
mechanics affected, and records which show the costs anticipated or the actual cost incurred
in providing such benefits.
D. Additional records relating to apprenticeship Contractors with apprentices working under
approved programs must maintain written evidence of the registration of apprenticeship
programs, the registration of the apprentices, and the ratios and wage rates prescribed in the
applicable programs.
ii. Certified payroll requirements
A. Frequency and method of submission The contractor or subcontractor must submit weekly,
for each week in which any DBA- or Related Acts-covered work is performed, certified
payrolls to HUD if the agency is a party to the contract, but if the agency is not such a party,
the contractor will submit the certified payrolls to the applicant, sponsor, owner, or other
entity, as the case may be, that maintains such records, for transmission to HUD. The prime
contractor is responsible for the submission of all certified payrolls by all subcontractors. A
contracting agency or prime contractor may permit or require contractors to submit certified
payrolls through an electronic system, as long as the electronic system requires a legally valid
electronic signature; the system allows the contractor, the contracting agency, and the
Department of Labor to access the certified payrolls upon request for at least 3 years after
the work on the prime contract has been completed; and the contracting agency or prime
contractor permits other methods of submission in situations where the contractor is unable
or limited in its ability to use or access the electronic system
B. Information required The certified payrolls submitted must set out accurately and completely
all of the information required to be maintained under 29 CFR 5.5(a)(3)(i)(B), except that full
Social Security numbers and last known addresses, telephone numbers, and email addresses
must not be included on weekly transmittals. Instead, the certified payrolls need only include
an individually identifying number for each worker (e.g., the last four digits of the worker's
Social Security number). The required weekly certified payroll information may be submitted
using Optional Form WH-347 or in any other format desired. Optional Form WH-347 is
available for this purpose from the Wage and Hour Division Web site at https://www.dol.gov/
sites/dolgov/files/WHD/legacy/files/wh347.pdf or its successor website. It is not a violation of
this section for a prime contractor to require a subcontractor to provide full Social Security
numbers and last known addresses, telephone numbers, and email addresses to the prime
contractor for its own records, without weekly submission by the subcontractor to the
sponsoring government agency (or the applicant, sponsor, owner, or other entity, as the case
may be, that maintains such records).
C. Statement of Compliance Each certified payroll submitted must be accompanied by a
"Statement of Compliance," signed by the contractor or subcontractor, or the contractor's or
subcontractor's agent who pays or supervises the payment of the persons working on the
contract, and must certify the following:
1. That the certified payroll for the payroll period contains the information required to be
provided under 29 CFR 5.5(a)(3)(ii), the appropriate information and basic records are being
maintained under 29 CFR 5.5 (a)(3)(i), and such information and records are correct and
complete;
2. That each laborer or mechanic (including each helper and apprentice) working on the contract
during the payroll period has been paid the full weekly wages earned, without rebate, either
directly or indirectly, and that no deductions have been made either directly or indirectly
Previous editions obsolete 4 Form HUD-4010, (10/2023)
ref. Handbook 1344.1

from the full wages earned, other than permissible deductions as set forth in 29 CFR part 3;
and
3. That each laborer or mechanic has been paid not less than the applicable wage rates and
fringe benefits or cash equivalents for the classification(s) of work actually performed, as
specified in the applicable wage determination incorporated into the contract.
D. Use of Optional Form WH-347 The weekly submission of a properly executed certification
set forth on the reverse side of Optional Form WH-347 will satisfy the requirement for
submission of the "Statement of Compliance" required by 29 CFR 5.5(a)(3)(ii)(C).
E. Signature The signature by the contractor, subcontractor, or the contractor's or
subcontractor's agent must be an original handwritten signature or a legally valid electronic
signature.
F. Falsification The falsification of any of the above certifications may subject the contractor
or subcontractor to civil or criminal prosecution under 18 U.S.C. 1001 and 31 U.S.C. 3729.
G. Length of certified payroll retention The contractor or subcontractor must preserve all
certified payrolls during the course of the work and for a period of 3 years after all the work
on the prime contract is completed.
iii. Contracts, subcontracts, and related documents The contractor or subcontractor must maintain this
contract or subcontract and related documents including, without limitation, bids, proposals,
amendments, modifications, and extensions. The contractor or subcontractor must preserve these
contracts, subcontracts, and related documents during the course of the work and for a period of 3
years after all the work on the prime contract is completed.
iv Required disclosures and access
A. Required record disclosures and access to workers The contractor or subcontractor must
make the records required under 29 CFR 5.5(a)(3)(i)-(iii), and any other documents that
HUD or the Department of Labor deems necessary to determine compliance with the labor
standards provisions of any of the applicable statutes referenced by 29 CFR 5.1, available
for inspection, copying, or transcription by authorized representatives of HUD or the
Department of Labor, and must permit such representatives to interview workers during
working hours on the job.
B. Sanctions for non-compliance with records and worker access requirements If the
contractor or subcontractor fails to submit the required records or to make them available,
or refuses to permit worker interviews during working hours on the job, the Federal agency
may, after written notice to the contractor, sponsor, applicant, owner, or other entity, as the
case may be, that maintains such records or that employs such workers, take such action as
may be necessary to cause the suspension of any further payment, advance, or guarantee of
funds. Furthermore, failure to submit the required records upon request or to make such
records available, or to permit worker interviews during working hours on the job, may be
grounds for debarment action pursuant to 29 CFR 5.12. In addition, any contractor or other
person that fails to submit the required records or make those records available to WHD
within the time WHD requests that the records be produced will be precluded from
introducing as evidence in an administrative proceeding under 29 CFR part 6 any of the
required records that were not provided or made available to WHD. WHD will take into
consideration a reasonable request from the contractor or person for an extension of the
time for submission of records. WHD will determine the reasonableness of the request and
may consider, among other things, the location of the records and the volume of
production.
C. Required information disclosures Contractors and subcontractors must maintain the full
Social Security number and last known address, telephone number, and email address of
each covered worker, and must provide them upon request to HUD if the agency is a party to
Previous editions obsolete 5 Form HUD-4010, (10/2023)
ref. Handbook 1344.1

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...BID # DESCRIPTION DEPARTMENT DATE DUE 5654 Combined Dispatch Area Construction Police/Fire Department ...

City of Woonsocket

Bid Due: 10/02/2041

...Contact Phone SBP 09/07/2026 1:00 PM 27-02 Active(Scheduled) Oil Water Separator Construction Quasi...

State Government of Rhode Island

Bid Due: 9/07/2026

...Follow Construction - NUWCDIVNPT - Consolidated Secure Facility Active Contract Opportunity Notice...: Y1AZ ...

DEPT OF DEFENSE

Bid Due: 8/12/2026

...Description The City of Pawtucket is seeking a qualified contractor for the construction ...

State Government of Rhode Island

Bid Due: 8/13/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.