PHWA - DESALTER IMPROVEMENTS – BAG FILTRATION SYSTEM REPLACEMENT WA2504

Location: California
Posted: Oct 23, 2026
Due: Nov 17, 2026
Agency: City of Port Hueneme
Type of Government: State & Local
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Bid Title: PHWA - DESALTER IMPROVEMENTS – BAG FILTRATION SYSTEM REPLACEMENT WA2504
Category: Engineering
Status: Open
Bid Recipient: Georgianna Alvarez
Description:

The project consists of furnishing all labor, materials, and equipment necessary to install pretreatment improvements at the existing Port Hueneme Water Agency Brackish Water Reclamation Demonstration Facility. The work includes, but is not limited to, the installation of two (2) horizontal cartridge filtration systems; all associated piping, fittings, appurtenances, and structural pipe supports; excavation and disposal of excess excavated materials; freight and delivery to the project site; manufacturer warranties; operation and maintenance manuals; shop and field testing; and manufacturer-provided on-site services. All work shall be completed in accordance with the Plans and Specifications and shall result in a fully operational pretreatment system.

The construction site is located at 5751 Perkins Road, Oxnard, California 93033, in Ventura County, California.

Publication Date/Time:
10/23/2026 12:01 AM
Closing Date/Time:
11/17/2026 2:00 PM
Submittal Information:
MAIL OR HAND DELIVERED TO CITY CLERK
Bid Opening Information:
Opening at 2:15pm at City hall
Addendum Date/Time:
11/13/2026
Pre-bid Meeting:
11/04/2026
Contact Person:
Dennis Martinez
Dmartinez@cityofporthueneme.org
(805) 986-6566
Plan & Spec Available:
The documents are available here and on our beaconbid website here:
https://www.beaconbid.com/solicitations/port-hueneme-public-works/open
Related Documents:

Attachment Preview

Port Hueneme Water Agency
Desalter Improvements - Bag Filtration System Replacement
Technical Specifications
Bid Submittal
___________________________
Stefanos G. Word, PE, ENV SP
Divisions 01 through 44
October 2026

PHWA - DESALTER IMPROVEMENTS - BAG FILTRATION SYSTEM
REPLACEMENT
TECHNICAL SPECIFICATIONS
TABLE OF CONTENTS
DIVISION 01
011100 DESCRIPTION AND COORDINATION OF WORK
012000 MEASUREMENT AND PAYMENT
013300 SUBMITTALS
019310 OPERATION AND MAINTENANCE MANUALS
DIVISION 02
024100 EQUIPMENT, PIPING, AND MATERIALS DEMOLITION
DIVISION 03
030500 GENERAL CONCRETE CONSTRUCTION
DIVISION 05
050520 BOLTS, WASHERS, ANCHORS, AND EYEBOLTS
DIVISION 09
099000 PAINTING AND COATING
DIVISION 26
264213 FLANGE INSULATION KITS
DIVISION 33
331300 DISINFECTION OF PIPING AND EQUIPMENT
DIVISION 40
400500 GENERAL PIPING REQUIREMENTS
400515 PRESSURE TESTING OF PIPING
400520 MANUAL, CHECK, AND PROCESS VALVES
400560 AIR-RELEASE AND VACUUM-RELIEF VALVES
400722 FLEXIBLE PIPE COUPLINGS AND EXPANSION JOINTS
400764 PIPE HANGERS AND SUPPORTS
400775 EQUIPMENT, PIPING, DUCT, AND VALVE IDENTIFICATION
402001 GENERAL REQUIREMENTS FOR STEEL PIPING
402050 FABRICATED STEEL SPECIALS
402076 STAINLESS STEEL PIPE
402094 CPVC PIPE, 3 INCHES AND SMALLER
DIVISION 44
444313 CARTRIDGE FILTERS
TABLE OF CONTENTS TOC-1
PHWA - Desalter Improvements - Bag Filtration System Replacement - October 2026

SECTION 011100 DESCRIPTION AND COORDINATION OF WORK
1.01 DESCRIPTION
1. This section generally describes the project and includes work necessary to
furnish all labor, materials and equipment necessary to install pretreatment
improvements to the existing Port Hueneme Water Agency Brackish Water
Reclamation Demonstration Facility, including but not limited to, two (2) horizontal
cartridge filtration systems; all associated piping, fittings, appurtenances,
structural pipe supports, all associated excavation, disposal of excess excavated
materials; freight to jobsite, manufacturer's warranty, operation and maintenance
manuals, shop and field testing, and manufacturer's onsite services, for a
complete system in accordance with the Plans and the Specifications. The
construction site is located in Ventura County at 5751 Perkins Road, Oxnard,
California, 93033.
The primary components are generally described as follows:
1. Demolition, Excavation, and Disposal of Excavated Material
2. Site Concrete
3. Site Piping, Appurtenances, Fittings, Structural Pipe Supports, and Valves
4. Painting and Coating
5. Horizontal Cartridge Filtration Units
6. Relocation and Re-Installation of Existing Instrumentation and Controls
Equipment
7. Provision of Operation and Maintenance Manuals, Equipment Freight,
Shop/Field Testing, Coordination with Equipment Manufacturers, and On-
site Manufacturer Start-Up Services.
1.02 TIME CONSTRAINTS
Contractor shall supervise, inspect, and direct the Work competently and apply such
skills and expertise as may be necessary to perform the Work in accordance with the
Contract Documents. Contractor shall be solely responsible for the specific means,
methods, techniques, sequence, or procedure of construction required to complete the
project as specified by the Contract Documents. Contractor shall be responsible to see
that the completed Work complies accurately with the Contract Documents.
1.03 COORDINATION WITH OTHERS
Other agencies, such as the City of Port Hueneme and Port Hueneme Water Agency,
may require access to the site for construction work and/or maintenance. The
Contractor shall coordinate his work with these agencies and provide access when
notified in writing seventy-two (72) hours prior to the work.
1.04 PLANT BYPASS OPERATIONS
To perform the scope of improvements outlined in the Contract Documents, PHWA
anticipates that the entire treatment plant will need to be bypassed during removal of
the bag filtration system and installation of the new cartridge filtration system. Based on
DESCRIPTION AND COORDINATION OF WORK 011100-1
PHWA - Desalter Improvements - Bag Filtration System Replacement - October 2026

conversations with PHWA staff in January 2025, the entire treatment plant can be
bypassed for up to four (4) weeks at a time.
PHWA operates an 8-inch PVC bypass pipeline that has been relocated around the
existing cartridge filter in anticipation of implementing the bag filtration system
replacement project. The entire treatment plant can be bypassed after closing the
existing 12-inch motor-operated valve (connected to the existing bag filtration system
influent flange) and fully opening the existing bypass isolation- and flow control valves.
PHWA staff will be responsible for operating all valves to perform bypass of the
treatment plant.
In generating the baseline schedule submittal, the Contractor shall use this information
to generate a baseline schedule for the project that considers bypass of the entire
treatment plant for up to four (4) weeks to allow for installation of the necessary piping,
valves, and equipment in accordance with the Contract Documents.
If more time is warranted for installation of the contracted scope of work, Contractor
shall notify PHWA and Owner's representative in writing to request an extension of time
for bypassing operations during construction.
DESCRIPTION AND COORDINATION OF WORK 011100-2
PHWA - Desalter Improvements - Bag Filtration System Replacement - October 2026

SECTION 012000 MEASUREMENT AND PAYMENT
1.01 WORK LISTED IN THE SCHEDULE OF WORK ITEMS
A. Work under this contract will be paid on a unit price or lump-sum basis as outlined on
the Bid Form for the quantity of work installed.
B. The unit prices and lump-sum prices include full compensation for furnishing the labor,
materials, tools, and equipment and doing all the work involved in completing the work
included in the contract documents.
C. The application for payment will be for a specific item based on the percentage
completed or quantity installed. The percentage complete will be based on the value of
the partially completed work relative to the value of the item when entirely completed
and ready for service.
1.02 WORK NOT LISTED IN THE SCHEDULE OF WORK ITEMS
A. The items in the Special Provisions, general requirements, and specifications which are
not listed in the schedule of work items of the Bid Form are, in general, applicable to
more than one listed work item, and no separate work item is provided therefor. Include
the cost of work not listed but necessary to complete the project designated in the
contract documents in the various listed work items of the Bid Form.
B. The bids for the work are intended to establish the total cost for the work in its entirety.
Should the Contractor feel that the cost for the work has not been established by
specific items in the Bid Form, include the cost for that work in some related bid item so
that the Proposal for the project reflects the total cost for completing the work in its
entirety.
1.03 GENERAL NATURE OF WORK
A. The work involves construction of new horizontal cartridge filtration system, including
but not limited to the following:
1. Where indicated on the construction drawings, removing piping, fittings,
appurtenances, and equipment associated with the existing bag filtration system.
2. Furnishing and installing pretreatment improvements to an existing desalination
facility, including but not limited to, two (2) horizontal cartridge filtration systems;
all associated piping, fittings, appurtenances, structural pipe supports, all
associated excavation, disposal of excess excavated materials, relocation and re-
installation of instrumentation and controls equipment; freight to jobsite,
manufacturer's warranty, operation and maintenance manuals, shop and field
testing, and manufacturer's onsite services, for a complete system in accordance
with the plans and specifications.
3. Startup and Field-Testing Services.
4. Operation and Maintenance Manuals
MEASUREMENT AND PAYMENT 012000-1
PHWA - Desalter Improvements - Bag Filtration System Replacement - October 2026

1.04 BID ITEMS
1. Mobilization, Demobilization, Bonds & Insurance:
Payment for mobilization (50% of the bid item) shall be made on a lump sum
basis at the time of the first progress payment after the Contractor has purchased
bonds and insurance and moved construction equipment onsite. Payment for
demobilization (50% of bid item) shall be made on a lump sum basis with the final
pay estimate.
2. Furnish and Install Bag Filtration System Replacement Improvements
Measurement and payment for this lump sum bid item includes full compensation
for a horizontal cartridge filtration system that replaces an existing automatic
backwashing bag filtration system as indicated in Specification Section 444313
and the Project Plans, including but not limited to local sales tax and freight, two
(2) horizontal cartridge filtration systems; all associated piping, fittings,
appurtenances, structural supports, all associated excavation, disposal of excess
excavated materials; freight to jobsite, manufacturer's warranty, operation and
maintenance manuals, shop and field testing, and manufacturer's onsite services,
for a complete system in accordance with the plans and specifications. Costs
associated with installation and startup coordination with the equipment
manufacturers shall be paid under Bid Item 2.
3. Removal of Existing Bag Filtration System and Piping
Measurement and payment for this lump sum bid item includes full compensation
for removal of the existing bag filtration system, piping and appurtenances (per
the limits of removal indicated on the Project Drawings) and removal and disposal
of concrete, and other miscellaneous items (specific items and extent of removal
indicated on the Project Drawings). Work for this bid item includes removal of the
existing bag filtration system, piping and appurtenances, and removal and
disposal of concrete and other miscellaneous items, in accordance with the plans
and specifications.
Disposal of the existing bag filtration system, piping and appurtenances shall be
accomplished by the Owner. Coordinate planned removal and disposal activities
of the existing filtration system, piping and appurtenances with the Owner prior to
construction.
4. Bid Alternate: Furnish and Install Schedule 80 CPVC Pipe and Fittings in Lieu of
304 Stainless Steel Pipe and Fittings
Measurement and payment for this lump sum bid alternate item includes full
compensation for furnishing and installing Schedule 80 CPVC Pipe and Fittings in
lieu of the 304 Stainless Steel Pipe and Fittings indicated in the Project Plans and
Technical Specifications, including but not limited to local sales tax and freight for
all associated piping, fittings, and appurtenances; freight to jobsite,
manufacturer's warranty, shop and field testing, and manufacturer's onsite
services, for a complete piping system in accordance with the plans and
specifications.
END OF SECTION
MEASUREMENT AND PAYMENT 012000-2
PHWA - Desalter Improvements - Bag Filtration System Replacement - October 2026

SECTION 013300 SUBMITTALS
1.01 SHOP DRAWINGS
A. Submit shop drawings in accordance with the Special Provisions.
B. The use of contract drawing reproductions for shop drawings is subject to rejection.
C. Submit shop drawings electronically in .PDF format compatible with adobe Acrobat
version 9. Files less than 5MB in size may be submitted to the Owner's Representative
via email. Files larger than 5MB shall be submitted by means of an FTP server, USB
flash drive, external hard drive, CD-ROM, or other method approved by the Owner's
Representative. Pages shall be scanned at a resolution necessary for legibility. Scans
shall be in color when necessary for clarity. Hard copies shall be submitted upon
request.
D. If the Contractor submits shop drawings of equipment by manufacturers other than
those listed in the specifications, provide the following information with the submittal:
1. The name and address of at least three companies or agencies that are currently
using the equipment.
2. The name and telephone number of at least one person at each of the above
companies or agencies whom the Owner's Representative may contact.
3. A description of the equipment that was installed at the above locations. The
description shall be in sufficient detail to allow the Owner's Representative to
compare it with the equipment that is proposed to be installed in this project.
E. For materials originating outside of the United States for which tests are required,
provide recertification and retesting by an independent domestic testing laboratory.
1.02 SUBMITTAL REQUIREMENTS
A. Make submittals promptly in such sequence as to cause no delay in the work. Schedule
submission a minimum of 30 calendar days before reviewed submittals will be needed.
B. Submittals shall contain:
1. The date of submission and the dates of any previous submissions.
2. The project title and number.
3. Contract identification.
4. The names of:
a. Contractor.
b. Supplier.
SUBMITTALS 013300-1
PHWA - Desalter Improvements - Bag Filtration System Replacement - October 2026

c. Manufacturer.
5. Identification of the product, with the specification section number.
6. Field dimensions clearly identified as such.
7. Relationship to adjacent or critical features of the work or materials.
8. Identification of deviations from contract documents.
9. Identification of revisions on resubmittals.
10. A 5-inch by 5-inch blank space for stamps of the Owner's Representative.
11. Contractor's stamp, initialed or signed, shall certify Contractor's review of
submittal, verification of products, field measurements and field construction
criteria, and coordination of the information within the submittal that the product
meets the requirements of the work and of the contract documents.
1.03 SUBMITTAL FORMAT
A. Each submittal shall have a transmittal form. A sample transmittal form is included at the
end of this section. Every page in a submittal shall be numbered in sequence. Each
copy of a submittal shall be collated and stapled or bound, as appropriate. Copies not
collated will be rejected.
B. Where product data from a manufacturer is submitted, clearly mark which model is
proposed, with all pertinent data, capacities, dimensions, clearances, diagrams,
controls, connections, anchorage, and supports. Present a sufficient level of detail for
assessment of compliance with the contract documents.
C. Each submittal shall be assigned a unique number. Submittals shall be numbered
sequentially. The submittal numbers shall be clearly noted on the transmittal. Original
submittals shall be assigned a numeric submittal number. Resubmittals shall bear an
alphanumeric system which consists of the number assigned to the original submittal for
that item followed by a letter of the alphabet to represent that it is a subsequent
submittal of the original. For example, if Submittal 25 requires a resubmittal, the first
resubmittal will bear the designation "25-A" and the second resubmittal will bear the
designation "25-B and so on.
D. Disorganized submittals that do not meet the requirements above will be returned
without review.
1.04 RESUBMITTALS
Resubmittal of submittals will be reviewed and returned in the same review period as for
the original submittal. It is considered reasonable that the Contractor shall make a
complete and acceptable submittal by the second submission of a submittal item. The
Owner's Representative reserves the right to withhold monies due to the Contractor to
cover additional costs of any review beyond the second submittal.
SUBMITTALS 013300-2
PHWA - Desalter Improvements - Bag Filtration System Replacement - October 2026

1.05 CONTRACTOR'S JOBSITE DRAWINGS
Provide and maintain on the jobsite one complete set of prints of all drawings which
form a part of the contract. Immediately after each portion of the work is installed,
indicate all deviations from the original design shown in the drawings either by
additional sketches or ink thereon. Upon completion of the job, deliver this record set to
the Owner's Representative.
SUBMITTALS 013300-3
PHWA - Desalter Improvements - Bag Filtration System Replacement - October 2026

Michael K. Nunley and Associates, Inc. ATTN: ________________________ ATTN: ________________________ PROJECT PROJECT NO. OWNER PROJECT NO. CONTRACTOR PROJECT NO.
ITEM NO. COPIES DESCRIPTION PREVIOUS SUBMITTAL NO. SPEC. SECTION NO. PLAN SHEET NO.
SUBMITTAL RETURN (TO BE COMPLETED BY ENGINEER)
ITEM NO. COPIES RESUBMIT COMMENTS
YES NO

SHOP DRAWING SUBMITTAL NO. ________
Michael K. Nunley and Associates, Inc.
ATTN: ________________________ ATTN: ________________________
PROJECT
PROJECT NO. OWNER PROJECT NO. CONTRACTOR PROJECT NO.
PREVIOUS SPEC. PLAN
ITEM
COPIES DESCRIPTION SUBMITTAL SECTION SHEET
NO.
NO. NO. NO.
SUBMITTED BY:
CONTRACTOR DATE
SUBMITTAL RETURN (TO BE COMPLETED BY ENGINEER)
RESUBMIT
ITEM
COPIES YES NO COMMENTS
NO.
COPY: RETURNED BY:
ENGINEER DATE
SUBMITTALS 013300-4
PHWA - Desalter Improvements - Bag Filtration System Replacement - October 2026

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Project: ADMINISTRATION BUILDING CONSTRUCTION PROJECT Ref. #: HD 26-06 Department: HAR Type: RFB... ...

Ventura County

Bid Due: 1/19/2027

...Department Contract # Contract # Buyer Erin Reyes Description On-Call Construction Bid Opening ...

City of Long Beach

Bid Due: 11/25/2026

...Basic Information Title Request for Qualifications - Task Order Construction Agreement - General... ...

State Government of California

Bid Due: 11/24/2026

...RFP for General Contractor - Preconstruction & Construction Services REQUEST FOR PROPOSALS... & ...

City of San Buenaventura

Bid Due: 11/18/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.