| Location: | West Virginia |
|---|---|
| Posted: | Aug 1, 2025 |
| Due: | Aug 8, 2025 |
| Agency: | STATE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 10182531044 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
DEPARTMENT OF STATE
OFFICE OF EMERGENCY MANAGEMENT (OEM)
STATEMENT OF WORK (SOW)
AUDIO/VIDEO and VIDEO-TELECONFERENCING (AV/VTC) EQUIPMENT
PROGRAMMING SERVICES, and INTEGRATION SERVICES
08/01/2025
This is a Sources Sought Notice Only. This is NOT a solicitation for proposals, proposal abstracts, or quotations. This Sources Sought Notice is issued for information and planning purposes only as part of U.S. Department of State (DOS) market research and does not constitute a solicitation. This requirement is covered under NAICS code: 541519 Other Computer Related Services.
The purpose of this notice is to obtain information regarding the availability and capability of qualified Small Business GSA Federal Supply Schedule Holders to provide the below services that meets the DOS requirements (small businesses; HUBZone small businesses; service-disabled veteran-owned small businesses; 8(a) small businesses; veteran owned small businesses; woman owned small businesses; and small disadvantaged businesses).
BACKGROUND: The Bureau of Administration, Domestic Operations and Emergency Services, Office of Emergency Management, Continuity Communications Division (A/DOES/OEM/CCD) at the Department of State (DOS) will occupy a new Conference and Training Center (CTC) located in Bluemont, VA, by the end of 2026. The new facility will have AV/VTC requirements which will include one (1) large conference room and four (4) small conference rooms. All conference rooms will require multi-level video teleconferencing capabilities. In addition to those spaces, there are AV requirements in other ancillary spaces that will require programming and integration, to include office spaces, kitchen spaces, and lab spaces. To achieve operational readiness in each of the spaces, contract assistance will be needed for audio-visual programming services and integration support.
OBJECTIVE: The objective of this requirement is to ensure the operational readiness of the Department’s new Conference and Training Center with fully functional, integrated, and interoperable multi-level Audio Visual, VTC and SVTC systems capabilities.
SCOPE:
The contractor shall perform the following functions to provide DOS with programming services and integration support of AV/VTC technologies for the new CTC facility that adhere to the requirements listed below:
Performance Requirements and System Description
Control System User-Interface: Design control system user-interface pages for this project exclusively. The following are the minimum requirements:
1. All panels shall have a title indicating the piece of equipment and/or
functionality being controlled.
2. User interface design shall maintain continuity throughout the
compound to the greatest extent practicable, considering variations
in system functionality from room to room.
3. Whenever the same button appears on more than one page, it shall
be in the same position of each page.
4. Functions used during the general presentation shall be accessible
with a minimal number of button presses or page flips.
5. Implement multi-level access to controls.
6. The UI and control code shall be provided as deliverable in an
unlocked/editable format.
V. Deliverables:
This contract will require all Contractor technicians and/or other staff to hold and maintain a Top-Secret clearance.
2. Warranty statement
This requirement will require a statement of warranty of any programming. All work completed on this project shall be under
warranty for a minimum of one (1) year from the date of commissioning by the Government. Work completed by the
Contractor under the scope of this contract will not void manufacturers’ equipment warranties.
Operation and Maintenance Manuals:
Manuals shall apply to all programming and software modules.
A. Vendor shall provide Operation and Maintenance Manuals shall be formatted as follows:
1) Bind each manual in a hard-back, loose-leaf binder.
2) Identify each manual’s contents on the cover.
3) Provide a table of contents and tabulated sheets for each manual. Place
tab sheets at the beginning of each chapter or section and, if applicable, at the beginning of each appendix.
4) Any hardware manual demonstrating more than one model number of devices on any one page shall be clearly marked
to delineate which model has been implemented in the Work.
5) Operation and Maintenance Manuals shall include, at a minimum, the following:
- Detailed programming descriptions for each subsystem
- Operation and Maintenance Manuals shall include a separate section for each software program incorporated into the
Project. The software section shall consist of, to a minimum, the following information:
1) Definitions of all software-related terms and functions
2) Description of required sequences
3) Directory of all programming and configuration files
4) Description of all communications protocols, including data formats,
command characters, and a sample of each type of data transfer
5) Instructions for manufacturer-supplied report generation
6) Instructions for custom report generation
7) Database format and data entry requirements
CUSTOMER ACCEPTANCE TESTING
a. Operation of system equipment demonstrated by factory-certified technicians or manufacturer-certified training staff.
b. Both subjective and objective tests are required to determine compliance with Contract Specifications. The contractor is
responsible for supplying test equipment for these tests.
d. O&M Manuals, testing result spreadsheets, processor programs, touch panel programs, and other required documents shall
be on hand prior to scheduling acceptance tests, with one complete set delivered to the USG representative prior to
scheduling of tests and one set to the Project Director/COR.
e. During Acceptance Testing, if further adjustment is required to conform to specified performance requirements or defective equipment requires repair or replacement, Acceptance Tests may be suspended or continued at the discretion of the
Customer, Project Director, or COR.
f. Any charge for additional time incurred by the customer representative required to oversee System Acceptance Tests due to
improper system programming or previously failed systems is the responsibility of, and charged directly to, the Contractor.
CLEANING AND PROTECTION
A. Clean up and repair all areas affected by this work. Protect exposed surfaces with materials that are easily removed without marring finishes.
B. Contractor is responsible for the protection of work from damage or loss due to either man-made or natural causes.
C. The site shall be cleaned at the end of each day, and all trash or other debris shall be removed in the appropriate manner and deposited in the proper containers.
D. The final cleaning shall ensure fingerprints, marks, or other debris are removed from all devices and the site, it shall be delivered in a ready-to-operate state.
E. Any damages to furniture, equipment, building structure, etc.… will be the contractor's responsibility to remedy as deemed by project director/COR.
GENERAL NOTES AUDIOVISUAL PRODUCTS and PROGRAMMING
A. Shall be capable of operating continuously during the typical work week.
B. The products and services will have a TAA, JITC, ADA or other approvals.
C. All programming code and configuration files for the AV devices are to be delivered to the customer in an unlocked, uncompressed, or open format without any locks or limitations on the files.
D. Through the system control programming, maintain fiber isolation to each VTC audio, video, and control input/output. Each VTC will be isolated based on classification. Fiber isolation includes all signals connecting to the codec device. The GFE network connection is the only active copper connection. When a particular VTC unit needs to be operational, the fiber modules associated with the codec will be turned on, and the others will be turned off. The power shall remain on for all Codec units. The optical equipment will be controlled via power devices to remove power from the equipment not in use for that classification.
SOURCES SOUGHT INSTRUCTIONS
2. Provide short summaries (limited to two (2) summaries) of work performed on Federal Government AV/VTC Programmin
and Integration Support Services and include reference point of contact information (i.e., name of reference, email of
reference, telephone number of reference, and Federal Agency).
3. Cost or price information is not solicited and will not be reviewed.
Interested GSA small businesses shall submit an electronic copy of their submission via email to Crystal Brooks,
brookscc@state.gov. The due date and time for submission of responses is 2:00 PM Eastern Standard Time
(EST) [August 8, 2025]. No phone calls related to this Sources Sought will be accepted. All correspondence shall be via
email. Companies responding to this Sources Sought shall be registered in the System for Award Management.
Provide available General Services Administration (GSA) Multiple Award Schedule Contract Numbers, if applicable.
All responses must include the following information:

With GovernmentContracts, you can: