| Location: | Massachusetts |
|---|---|
| Posted: | Jul 16, 2026 |
| Due: | Jul 30, 2026 |
| Agency: | Wright-Pierce |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Town of Athol invites sealed bids for the South Street Improvement Project Phase III. The Town of Athol has completed the engineering design for Phase III of the South Street corridor reconstruction. This phase covers the section of South Street between Freedom Street and Tunnel Street. The project consists of furnishing all labor, tools, materials, and equipment necessary for 1) Roadway pavement replacement: 675-LF of full-depth asphalt pavement replacement from the
Freedom Street intersection to the culvert; 2) Mill and overlay: 70-LF of roadway milling and overlay from the culvert to the Tunnel Street intersection; and 3) Sidewalk improvements: 920-LF of ADA-compliant concrete sidewalk along the north side of South Street, extending from the Freedom Street intersection to the Tunnel Street intersection. This project is administered by the Town of Athol and the Central Massachusetts Regional Planning Commission (CMRPC) and funded by the Massachusetts Executive Office of Housing and Livable Communities (EOHLC), FY2026 Athol Community Development Block Grant (CDBG) Program.

With GovernmentContracts, you can:
...Bid Number: 27-009 Bid Title: Mill and Overlay Paving Projects Category: Construction Status: ...
City of Westfield
Bid Due: 9/23/2026
...No. STP(BR-OFF)-003S(948)X Bridge Replacement, S-21-009, Mill Street over M Bid Opening Date: 10/06...
Commonwealth of Massachusetts
Bid Due: 10/06/2026
...Deadline: November 2, 2026 Ship-to Address: Julie Coop 66 Mill Street Belmont, MA ...
Commonwealth of Massachusetts
Bid Due: 11/02/2026
...associated with its local landfill and active transfer station located at 45 Flint ...
Town of Barnstable
Bid Due: 9/25/2026