| Location: | North Carolina |
|---|---|
| Posted: | Oct 3, 2024 |
| Due: | Oct 30, 2024 |
| Agency: | City of Charlotte |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY25-ITBCon-08 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation. This scope of work also includes the relocation of and existing 8” gravity sewer line.

With GovernmentContracts, you can:
...of the WTP; with Lagoon 2 receiving the vast majority of this flow. ...
City of Durham
Bid Due: 6/12/2026
...surface flow and unnamed tributaries to Stirrup Iron Creek, which has a NC ...
State Government of North Carolina
Bid Due: 6/25/2026