Repair Simulator Roof, Bldg. 42, NAS Lemoore, CA

Location: California
Posted: Dec 20, 2024
Agency: DEPT OF DEFENSE
Type of Contract: Awards
Type of Government: Federal
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: N62473-24-R-J514
Publication URL: To access bid details, please log in.
Follow
Repair Simulator Roof, Bldg. 42, NAS Lemoore, CA
Active
Contract Opportunity
Notice ID
N62473-24-R-J514
Related Notice
Contract Line Item Number
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE NAVY
Major Command
NAVFAC
Sub Command
NAVFAC PACIFIC CMD
Sub Command 2
NAVFAC SOUTHWEST SW
Office
NAVFACSYSCOM SOUTHWEST
Award Details
  • Contract Award Date: Dec 11, 2024
  • Contract Award Number: N62473-20-D-1105
  • Task/Delivery Order Number: N62473-25-F-4071
  • Contractor Awarded Unique Entity ID: FCBGML5XFQP7
  • Contractor Awarded Name: CORBARA-MGS JV
  • Contractor Awarded Address: National City , CA 91950 USA
  • Base and All Options Value (Total Contract Value): $356,643.00
General Information
  • Contract Opportunity Type: Award Notice (Original)
  • Original Published Date: Dec 20, 2024 07:13 pm EST
  • Inactive Policy: Manual
  • Original Inactive Date: Dec 31, 2024
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Z2JB - REPAIR OR ALTERATION OF TESTING AND MEASUREMENT BUILDINGS
  • NAICS Code:
    • 236220 - Commercial and Institutional Building Construction
  • Place of Performance:
    Lemoore , CA 93246
    USA
Description

1.3.1 Project Description

The work includes comprehensive roof repair to fix and correct cause of

the leaks at NAS Lemoore building #42-Simulator building at Ops side.

Cover only vertical surfaces of parapet wall. Repair all roof surface

cracks at damaged locations. Replace/Provide damaged/missing metal freeze

edge or metal trim/flashing. Inspect all roof penetrations and properly

fix them. All roof repair work must be completed prior to new waterproof

roofing membrane application, in accordance with new roofing material

manufacturer's specification for the period of specified warranty limit.

Work is to provide built up material by installing a cold spray-on

applied roofing membrane system over entire existing roof, vertical

surface of parapet in accordance with specification and drawings. The work

includes and incidental related work.



1.3.1.1 Inspection and Repair of Roof Damage

a. Verify and diagnose water leak damage on roof surface.

Repair all roof surface cracks, at all deteriorated and damaged locations.

Replace and provide new all damaged/missing metal freeze edge and metal

trim/flashing. verify all existing gutters and downspouts are connected

properly to the existing water drain system.

b. Inspect all roof penetrations; investigate any water leak issues, roof

tie in points, wall tie in to existing roof locations.

c. Ensure that all material to be used to correct deficiency are compatible

with existing roof surfaces.

d. All roof repair work must be completed prior to new waterproof roofing

membrane application, in accordance with new roofing material

manufacturer's specification for the period of specified warranty limit.

e. Work must be to provide new built up material by installing a cold

spray-on applied roofing membrane system over entire existing roof,

vertical surfaces in accordance with specifications and drawings.





1.3.1.2 Application of Water-Proofing Membrane

a. Furnish and install an instant-setting, liquid-applied, roof

restoration system complete in place, as shown on the drawings, and

specified herein, or needed for a complete and proper watertight and

warrantable installation.

(1) Ensure all materials to be used to correct deficiencies is

compatible to cover and adhere to existing roofing surfaces and

parapet.

(2) The following information must be provided with proposal submittal

for area identified for repair. Provide manufacturer's construction

specifications and material application guide. Provide actual sample

showing thickness of each layer of coating and finished surface.

(3) Provide verification that a 20-year warranty is achievable as

specified.

b. Waterproofing materials must be applied to all seams, flashing,

edges, fasteners, penetrations, curbs and defects for a waterproof

roofing, cover only vertical surface of parapet.





1.3.2 Location

The work is located at Naval Air Station Lemoore (NASL), approximately as

indicated on the Contract drawings. The exact location will be shown by

the Construction Manager (CM).





1.4 OCCUPANCY OF PREMISES

Building(s) will be occupied during performance of work under this

Contract.

Before work is started, arrange with the CM a sequence of procedure, means

of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

Schedule and perform the work in such a manner as to cause the least

possible interference to the occupants. All life safety requirements must

be operational at areas occupied during the work being performed.





1.6 PROJECT DURATION

120 days after award


Attachments/Links
Contact Information
Contracting Office Address
  • 750 PACIFIC HIGHWAY
  • SAN DIEGO , CA 92132-0001
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Dec 20, 2024 07:13 pm ESTAward Notice (Original)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.