| Location: | Michigan |
|---|---|
| Posted: | Dec 4, 2025 |
| Due: | Dec 12, 2025 |
| Agency: | Great Lakes Water Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | REQ- 0004099 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Great Lakes Water Authority (GLWA) request bids from construction companies ("Contractor") to provide Pump Station 2 Variable Frequency drives (VFDs) upgrade at the Water Resource Recovery Facility (WRRF). The project includes replacement of sewage pump VFDs, rewinding of sewage pump motors, and electrical distribution system upgrades.
Pump Station 2 receives its influent flow from the Oakwood Interceptor and North Interceptor East Arm (NIEA). It has two (2) wet wells with a total of five (5) sluice gates and five (5) stop logs to control the influent flow from its two (2) sources. Wet wells 1 and 2 receive their flow from the Oakwood Interceptor and NIEA, respectively. Pump Station 2 lifts this wastewater up to a level from which eight (8) centrifugal pumps can pump it out of the wet wells and it can flow by gravity through the screening facility. Five (5) of the eight (8) pumps are variable speed pumps with VFDs. The VFDs are used to control the flow of the wastewater to achieve the required amount of flow.

With GovernmentContracts, you can:
...Burdick Street (Emerson to Stockbridge) Water Main Replacement, Phase1 Closing date June 30, ...
City of Kalamazoo
Bid Due: 6/30/2026
...cast iron water main using Aqua-Pipe(r)/ALTRA, or approved equal, cured-in-place-pipe (CIPP...-052.0 Bid Document ...
City of Kalamazoo
Bid Due: 6/09/2026
..., enabling the establishment of essential water, fuel, and steam distribution networks in ...
DEPT OF DEFENSE
Bid Due: 6/09/2026