Marina Lagoon Spot Dredging Project

Location: California
Posted: Apr 6, 2026
Due: Apr 14, 2026
Agency: City of San Mateo
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Publication URL: To access bid details, please log in.
Bid Title: Marina Lagoon Spot Dredging Project
Category: ALL OPEN BID REQUESTS
Status: Open
Description:

See the Bid notice, Barker Blue web link (to acquire the contract book, plans, and proposal forms), and the Contract book (for viewing purposes only; proposers must purchase from barker Blue to bid on the project) in the "Related Documents" section below.  It is the bidders responsibility to check back on the website for any addendums that may have been issued.

Publication Date/Time:
3/17/2026 8:00 AM
Closing Date/Time:
4/14/2026 2:00 PM
Contact Person:
Jimmy Vo - Engineering Manager Email: publicworks@cityofsanmateo.org
Related Documents:

Attachment Preview

LEGEND GENERAL NOTES WATER LEVEL SUMMARY VIEW LETTER VIEW LETTER MARINA LAGOON'S PRIMARY WATER SOURCE IS TIDAL FLOW THROUGH O'NEILL SLOUGH DURING 1. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL HIGH TIDES. IN ADDITION TO BEING TIDALLY INFLUENCED, THE WATER LEVELS ARE REGULATED WARNING SIGNS AND DEVICES NECESSARY TO SAFEGUARD THE PUBLIC AND THE WORK, AND ON A SEASONAL BASIS, SEE TABLE 1 AND TABLE 2. X SAMPLE VIEW TITLE X FOR PROVIDING PROPER AND SAFE ROUTING OF THE BOATING, VEHICULAR AND PEDESTRIAN TRAFFIC DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT SHALL APPLY ## SCALE: 1"=50' ## WATER LEVELS SHOWN ARE ONLY FOR REFERENCE AND MAY NOT REPRESENT CONDITIONS CONTINUOUSLY AND SHALL NOT BE LIMITED TO WORKING HOURS. THE USE OF FLAGGERS, DURING CONSTRUCTION. SHEET NUMBER VIEW BARRICADES, AND CONSTRUCTION SIGNING SHALL COMPLY WITH THE CITY OF SAN MATEO'S REFERENCED TO 1 STANDARD SPECIFICATION; AND BUOYS, LIGHTS, OR OTHER NAVIGATIONAL AIDS SHALL SHEET NUMBER VIEW COMPLY WITH THE U.S. COAST GUARD REQUIREMENT. TABLE 1: REFERENCED FROM NOAA STATION ID#9414523 REDWOOD CITY CA 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF ALL VIEW TITLE DETAIL CALLOUT KEYED NOTE UTILITY SERVICES WITHIN THE PROJECT LIMITS OF CONSTRUCTION. THE CONTRACTOR SHALL DATUM VALUE DESCRIPTION BE RESPONSIBLE FOR ALL DAMAGE INCURRED TO UTILITIES TO THE SATISFACTION OF THE MHHW 7.02 MEAN HIGHER-HIGH WATER CITY. VIEW LETTER MHW 6.39 MEAN HIGH WATER 3. PROJECT OWNER: MSL 3.22 MEAN SEA LEVEL CONTACT: JAMES YANG, SENIOR ENGINEER X P# DEPARTMENT OF PUBLIC WORKS, CITY OF SAN MATEO MLW 0.02 MEAN LOW WATER ## ## 650-522-7575, JYANG@CITYOFSANMATEO.ORG NAVD88 0.00 NORTH AMERICAN VERTICAL DATUM OF 1988 X MLLW -1.18 MEAN LOWER-LOW WATER ## 4. DESIGN ENGINEER: SHEET NUMBER VIEW MOFFATT & NICHOL REFERENCED TO 2185 N. CALIFORNIA BLVD, SUITE 500 TABLE 2: WALNUT CREEK, CA 94596 SECTION CALLOUT PHOTOGRAPH DETAIL CALLOUT WITH CONTACT: JACLYN GNUSTI, P.E. MARINA LAGOON OPERATING LEVELS 925-944-5411 CALLOUT LEADERS LEVEL OPERATING RANGE 5. CONTRACTOR SHALL PROVIDE THE ENGINEER WITH A DETAILED DREDGING AND DISPOSAL PERIOD ADJUSTMENT (NAVD88, FT) COMMENTS OPERATIONS PLAN PRIOR TO COMMENCING WORK, SEE SPECIFICATIONS. NOVEMBER 1 - PREPARING FOR -1FT TO -1.5FT 0.5 TO 1.0 6. THE CONTRACT DOCUMENTS AND SPECIFICATIONS REPRESENT THE SCOPE OF WORK. NOVEMBER 30 WINTER RAINS UNLESS OTHERWISE SHOWN THEY DO NOT INDICATE THE METHOD OF WORK. THE DECEMBER 1 - WINTER OPERATING CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY APRIL 14 -0.4FT TO -0.9FT 0.1 TO 0.6 LEVEL RESPONSIBLE FOR ALL MEANS AND METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES. APRIL 15 - SPRING +1.0FT TO +1.5FT 0.5 TO 1.0 APRIL 30 INTERMEDIATE LEVEL ABBREVIATIONS MAY 1 - +1.0FT TO +1.5FT 1.5 TO 2.0 SUMMER OPERATING OCTOBER 31 LEVEL CT COURT NAVD88 NORTH AMERICAN VERTICAL DR DRIVE DATUM OF 1988 ELEV ELEVATION ST STREET PROJECT DATUM AND SURVEY INFORMATION (E) EXISTING TYP TYPICAL FT FEET VERT VERTICAL COORDINATE SYSTEM: CALIFORNIA STATE PLANE ZONE 3, NAD83(2011) US SURVEY FEET FWY FREEWAY VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88) US SURVEY FEET H M M M M O A H H IN R X W H Z W H M M M M W O A E E I A N R X A A T IM I N N I E M Z U R O H H U M N I I M G G T H H A E L W R A -H T I E G R H ALL ELEVATIONS ARE REFERENCED TO NAVD88, FEET. RE GISTER JA E CL D Y N E P C x N R p L O O O . F 0 N . E 9 6 I S - N 2 3 S 4 G 0 I 4 O E - 6 2 N RG A 5 N U L ST I E NG IN EER M M L L W L W M M E E A A N N L L O O W W E W R A -L T O E W R WATER STATE C I V IL LIFORNIA M S L M E A N S E A L E V E L OF C A VALLEJO 1 S 3 5 6 2 4 . . . . . . HE D N D O S TI E R O R V E T D E E E R L T I E D D R T M G H G A S N E L E E H L N L U A E P P T P U E L L M R L N T A A A E N N B C N M H E 1 2 O R O O R V E F F A S H L 2 2 A A L B A N R E O D N S E R L L A D E I I N S E L G T - C C E S R R I X T I E E T I L S E E E T K K E I N D D S G R R E E C D D O G G N E E D A A IT R R IO E E N A A S PROJECT LOCATI S O A N N MA S TE A O N - H F A R Y A W N A C R IS D C B O R B ID A G Y E M C A O R . IN ASNANS L E A MV L R A M I K LL O L S L P E CM S U Y IA A T R R U YI S N ALI RS T MC F AA O OA NF R DR T A I ET S B E E A F R U L R A A R N A O SN N N AC C NIS I C S O CO P O IN A O S K A L L E N A A N P E L D A M A A B L E M L B R E H O BA Y D E E N V A R R Y IL K C L E U E L L E E O Y S RIN C M D O A A N R TR T L I A N A E FA Z P Y C L E E T H O A T M IL S S E O LA T R N A A T G C A O W . ALNUT C C O R N E C E O K RD CONTRA COSTA CO. 7 9 8 . . . C S S E E O C C N T T S I I T O O R N N U S S C B L T E O IO S R L N E I E L B M C C R R Ps E E E E K K D D R R E E D D G G E E A A R R E E A A DC S AITL A YY P N A C F S IF R A C ICC A O N A N O L M M C A . S A IS A T N C E S F B O O O R R U A I C S T C N B H O C O A I . S N . C E O LOS S RA A EN N N Z L O EANDRO HAYWARD PLEASAN L T IV O E N RMORE SAN BRUNO LINDA MAR MILBRBAUERLINGAME UNION CITY 1 MONTARA MSAANTEO FOSTER CITY FREMONT BAIR ISLAND MOSS BEACH BELMONT NEWARK EL GRANADA 101 HALF MOON PR B AE A RD Y KWOO R D E W DW OO O D OA S DTM I H D C EE E I N TRL YTOO PNARK PA USTN L AI O VN.F A OR L D TO MILPITAS M S A C A T O N E . O MOUN L T OA AV LS IIN T E O W S S U NNYV A L E S CA LN AT RAA SGARNE GO R I O LA HONDA C U P E RT IN O C A M P B E L L SJOASNE SANTA CLARA PESCADERO SARATOGA CO. 280 SANTA CRUZ CO. SCOTTS VALLEY LOCATION MAP VICINITY MAP ETAD
YB
NOITPIRCSED
.ON .VER
MOC.LOHCINTTAFFOM.WWW DVLB 69549 AINROFILAC AC 1145-449-529 005 ,KEERC ETIUS TUNLAW .N 5812
GISTER E D P C R L O O F N E I S N S G I O E N RG A L E NG RE JA CL Y N E x N p O . 0 . 9 6 - 2 3 4 0 4 - 6 2 5 N U ST I IN EER STATE C I V IL LIFORNIA OF C A TNEMIDES TCEJORP 600C64 TEEHS .ON NOOGAL TCEJORP LAVOMER ELTIT ANIRAM YTIC
82-20-5202 61-50-5202 02-50-5202 :ETAD :ETAD :ETAD 1# MUDNEDDA GJ 541042 NWOHS ZT :YB :YB DENGISED YA :YB NWARD DEKCEHC .oN TCEJORP SA :ELACS :LATTIMBUS CQ
SHEET __1____ OF ___9___
NOAA STATION ID#9414523 REDWOOD CITY CA
DATUM VALUE DESCRIPTION
MHHW 7.02 MEAN HIGHER-HIGH WATER
MHW 6.39 MEAN HIGH WATER
MSL MLW 3.22 0.02 MEAN SEA LEVEL MEAN LOW WATER
MARINA LAGOON OPERATING LEVELS
PERIOD LEVEL ADJUSTMEN OPERATING RANGE T (NAVD88, FT) COMMENTS
NOVEMBER 1 - NOVEMBER 30 -1FT TO -1.5FT 0.5 TO 1.0 PREPARING FOR WINTER RAINS
DECEMBER 1 - APRIL 14 -0.4FT TO -0.9FT 0.1 TO 0.6 WINTER OPERATING LEVEL
APRIL 15 - APRIL 30 +1.0FT TO +1.5F T 0.5 TO 1.0 SPRING INTERMEDIATE LEVEL
MAY 1 - SUMMER OPERATING
MATEO-H SAN SAN FRANCISCO BAY BAIR ISLAND 101 280 LA MV R AI K LLL S L P E CM S U Y IA A T R R U YI S N ALIT MC O OADR TI ET S B E F R U R A A R A O SN N N ACNISCO OA S K A L N A A N P E L D A M A A B L E M L B R E O BA Y D EN V A RY IL K L E E LE O Y RIN C D O A NTR L A AFA P Y C L E E T H O A T M IL S S E O LA T R N A A T G C A O W . ALNUT CREEK CONTRA COSTA CO. FRANCISCO DC S AITL A YY N F S R A C A N N O M C . A IS T C E O O C C O O . . S A N L EANDRO P A C IF ICC O A L M A S A N S F B O R R U A I S T N B H C A I S N C E O LOS RA EN N Z O HAYWARD PLEASAN L T IV O E N RMORE SAN BRUNO LINDA MAR MILBRBAUERLINGAME UNION CITY MONTARA MSAANTEO FOSTER CITY FREMONT MOSS BEACH BELMONT NEWARK EL GRANADA HALF MOON PR B AE A RD Y KWOO R D E W DW OO O D OA S DTM I H D C EE E I N TRL YTOO PNARK PA USTN L AI O VN.F A OR L D TO MILPITAS M S A C A T O N E . O MOUN L T OA AV LS IIN T E O W S S U NNYV A L E S CA LN AT RAA SGARNE GO R I O LA HONDA C U P E RT IN O C A M P B E L L SJOASNE SANTA CLARA PESCADERO SARATOGA CO. SANTA CRUZ CO. SCOTTS VALLEY

SHEET ______ OF ______
ETAD
YB
NOITPIRCSED
.ON
.VER
82-20-5202
:ETAD
ZT
:YB DENGISED
61-50-5202
:ETAD
YA :YB NWARD
02-50-5202
:ETAD
GJ :YB
DEKCEHC
CQ
541042
.oN TCEJORP
NWOHS
SA :ELACS
1#
MUDNEDDA
:LATTIMBUS
RE GISTERED P C N R L O O O F N . E 6 I S N 2 S 4 G I 4 O E 6 N R AL E NG IN EER
Exp. 09-30-25
STATE
OF
C I
C
V
A
IL LIFORNIA
VALLEJO
MARIN
CO. PINOLE HERCULES MARTINEZ
ASNANSELMO RSAANFAEL CONCORD LA MV R AI K LLL S L P E CM S U Y IA A T R R U YI S N ALIT MC O OADR TI ET S B E F R U R A A R A O SN N N ACNISCO OA S K A L N A A N P E L D A M A A B L E M L B R E O BA Y D EN V A RY IL K L E E LE O Y RIN C D O A NTR L A AFA P Y C L E E T H O A T M IL S S E O LA T R N A A T G C A O W . ALNUT CREEK CONTRA COSTA CO. FRANCISCO
DC S AITL A YY P N A C F S IF R A C ICC A O N A N O L M M C A . S A IS A T N C E S F B O O O R R U A I C S T C N B H O C O A I . S N . C E O LOS S RA A EN N N Z L O EANDRO HAYWARD PLEASAN L T IV O E N RMORE
SAN BRUNO
LINDA MAR MILBRBAUERLINGAME UNION CITY
MONTARA MSAANTEO FOSTER CITY FREMONT
MOSS BEACH BELMONT NEWARK
EL GRANADA
HALF MOON PR B AE A RD Y KWOO R D E W DW OO O D OA S DTM I H D C EE E I N TRL YTOO PNARK PA USTN L AI O VN.F A OR L D TO MILPITAS
SGARNE
M
GO
S A C
R
A
I
T
O
O N E . O
LA HONDA
MOUN L T OA AV
C
LS IIN
U
T E O
P
W
E
S
RT
S
IN
U
O
NNYV
C
A
A
L
M
E
P
S
B
CA
E
LN
L
AT
L
RAA
SJOASNE SANTA CLARA
PESCADERO SARATOGA CO.
SANTA CRUZ
CO. SCOTTS VALLEY LOCATION MAP VICINITY MAP
DVLB
AINROFILAC
.N
5812
005
ETIUS
TNEMIDES
NOOGAL
ANIRAM
69549
AC
,KEERC
TUNLAW
1145-449-529
TCEJORP
LAVOMER
MOC.LOHCINTTAFFOM.WWW
600C64
.ON TCEJORP
YTIC
LEGEND
GENERAL NOTES
VIEW LETTER VIEW LETTER
1. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL
WARNING SIGNS AND DEVICES NECESSARY TO SAFEGUARD THE PUBLIC AND THE WORK, AND
X SAMPLE VIEW TITLE X
FOR PROVIDING PROPER AND SAFE ROUTING OF THE BOATING, VEHICULAR AND PEDESTRIAN
TRAFFIC DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT SHALL APPLY ## SCALE: 1"=50' ##
CONTINUOUSLY AND SHALL NOT BE LIMITED TO WORKING HOURS. THE USE OF FLAGGERS, SHEET NUMBER VIEW
BARRICADES, AND CONSTRUCTION SIGNING SHALL COMPLY WITH THE CITY OF SAN MATEO'S REFERENCED TO 1
STANDARD SPECIFICATION; AND BUOYS, LIGHTS, OR OTHER NAVIGATIONAL AIDS SHALL SHEET NUMBER VIEW
COMPLY WITH THE U.S. COAST GUARD REQUIREMENT. REFERENCED FROM
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT LOCATION OF ALL VIEW TITLE DETAIL CALLOUT KEYED NOTE
UTILITY SERVICES WITHIN THE PROJECT LIMITS OF CONSTRUCTION. THE CONTRACTOR SHALL
BE RESPONSIBLE FOR ALL DAMAGE INCURRED TO UTILITIES TO THE SATISFACTION OF THE CITY. VIEW LETTER
3. PROJECT OWNER:
CONTACT: JAMES YANG, SENIOR ENGINEER X P#
DEPARTMENT OF PUBLIC WORKS, CITY OF SAN MATEO ## ##
650-522-7575, JYANG@CITYOFSANMATEO.ORG X
##
4. DESIGN ENGINEER: SHEET NUMBER VIEW
MOFFATT & NICHOL REFERENCED TO
2185 N. CALIFORNIA BLVD, SUITE 500
WALNUT CREEK, CA 94596 SECTION CALLOUT PHOTOGRAPH DETAIL CALLOUT WITH
CONTACT: JACLYN GNUSTI, P.E.
925-944-5411 CALLOUT LEADERS
5. CONTRACTOR SHALL PROVIDE THE ENGINEER WITH A DETAILED DREDGING AND DISPOSAL
OPERATIONS PLAN PRIOR TO COMMENCING WORK, SEE SPECIFICATIONS.
6. THE CONTRACT DOCUMENTS AND SPECIFICATIONS REPRESENT THE SCOPE OF WORK.
UNLESS OTHERWISE SHOWN THEY DO NOT INDICATE THE METHOD OF WORK. THE
CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE SOLELY
RESPONSIBLE FOR ALL MEANS AND METHODS, TECHNIQUES, SEQUENCES AND PROCEDURES.
JACLY N G N U STI
SHEET NUMBERS AND TITLES
1. TITLE SHEET 2. OVERALL PLAN 3. SEDIMENT REMOVAL AREAS - EXISTING CONDITIONS 4. NORTH LAUNCH REHANDLING SITE 5. DREDGE PLAN 1 OF 2 LESLIE CREEK DREDGE AREA 6. DREDGE PLAN 2 OF 2 BOREL CREEK DREDGE AREA
7. SECTIONS LESLIE CREEK DREDGE AREA 8. SECTIONS BOREL CREEK DREDGE AREA 9. CONSTRUCTION BMPs
TEEHS
ELTIT
PROJECT LOCATI
S
O
A
N
N
MATEO-HAYWARD
BRIDGE
SAN FRANCISCO BAY
BAIR ISLAND
101
280
1 9
MA
84:11 4202/03/21 | teSteehS_\evitcA_\DDAC
02\lavomeR
tnemideS
noogaL
aniraM
541042\CW\:Q
WATER LEVEL SUMMARY
MARINA LAGOON'S PRIMARY WATER SOURCE IS TIDAL FLOW THROUGH O'NEILL SLOUGH DURING
HIGH TIDES. IN ADDITION TO BEING TIDALLY INFLUENCED, THE WATER LEVELS ARE REGULATED
ON A SEASONAL BASIS, SEE TABLE 1 AND TABLE 2.
WATER LEVELS SHOWN ARE ONLY FOR REFERENCE AND MAY NOT REPRESENT CONDITIONS
DURING CONSTRUCTION.
TABLE 1:
NOAA STATION ID#9414523 REDWOOD CITY CA
DATUM VALUE DESCRIPTION
MHHW 7.02 MEAN HIGHER-HIGH WATER
MHW 6.39 MEAN HIGH WATER
MSL 3.22 MEAN SEA LEVEL
MLW 0.02 MEAN LOW WATER
NAVD88 0.00 NORTH AMERICAN VERTICAL DATUM OF 1988
MLLW -1.18 MEAN LOWER-LOW WATER
TABLE 2:
MARINA LAGOON OPERATING LEVELS
LEVEL OPERATING RANGE
PERIOD COMMENTS ADJUSTMENT (NAVD88, FT)
NOVEMBER 1 - PREPARING FOR
-1FT TO -1.5FT 0.5 TO 1.0
NOVEMBER 30 WINTER RAINS
DECEMBER 1 - WINTER OPERATING
-0.4FT TO -0.9FT 0.1 TO 0.6 APRIL 14 LEVEL
APRIL 15 - SPRING
+1.0FT TO +1.5FT 0.5 TO 1.0
APRIL 30 INTERMEDIATE LEVEL
ABBREVIATIONS MAY 1 - +1.0FT TO +1.5FT 1.5 TO 2.0 SUMMER OPERATING
OCTOBER 31 LEVEL
CT COURT NAVD88 NORTH AMERICAN VERTICAL
DR DRIVE DATUM OF 1988
ELEV ELEVATION ST STREET PROJECT DATUM AND SURVEY INFORMATION
(E) EXISTING TYP TYPICAL
FT FEET VERT VERTICAL COORDINATE SYSTEM: CALIFORNIA STATE PLANE ZONE 3, NAD83(2011) US SURVEY FEET
FWY FREEWAY VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88) US SURVEY FEET
HORZ HORIZONTAL MAX MAXIMUM ALL ELEVATIONS ARE REFERENCED TO NAVD88, FEET. MHW MEAN HIGH WATER MHHW MEAN HIGHER-HIGH WATER
MIN MINIMUM
MLW MEAN LOW WATER MLLW MEAN LOWER-LOWWATER
MSL MEAN SEA LEVEL
1

ETAD YB NOITPIRCSED J HART CLINTON DR .ON .VER MARINA LAGOON P2 MOC.LOHCINTTAFFOM.WWW DVLB 69549 X X X X 4 AINROFILAC AC 1145-449-529 005 (E) MAIN PEDESTRIAN ,KEERC X PATH (SEE NOTE 9) ETIUS TUNLAW X ( ( S E E ) P E A N R O K T IN E G 8 ) LOT (E ( ) D L O IG N H O T T P D O IS LE T , U T R Y B P ) O A D L (E A ) U B N O C A H T RAMP .N R 5812 TEMPORARY PEDESTRIAN X P1 (E) ( P O U V B E L R IC H E U A T D IL I P T O Y W E E A R SE L M IN E E N S T ) H O R PATH DETOUR, SEE NOTE 7 4 N C P1 VIEW OF BOAT LAUNCH RAMP X A 4 LOOKING SOUTHEAST (E) BOAT 1 X LAUNCH RAMP (E) PUBLIC UTILITY EASEMENT (OVERHEAD (E) PEDESTRIAN PATH X POWER LINES) X (E) LIGHT POLE APPROXIMATE BOUNDARY OF (E) BOAT (PROTECT IN EXISTING UTILITIES NORTH LAUNCH REHANDLING SITE LAUNCH PLACE), TYP (DO NOT DISTURB) RAMP MARINA LAGOON ETIS TNEMIDES C CONSTRUCTION ACCESS PLAN - NORTH LAUNCH REHANDLING SITE 2 SCALE: 1" = 50' (E) SINGLE LANE GNILDNAHER TCEJORP 600C64 ACCESS ROAD TO REHANDLING SITE (E) BOLLARDS, TYP SEE NOTE 10. .ON NOOGAL TCEJORP LAVOMER HCNUAL ANIRAM YTIC P2 VIEW OF ACCESS ROAD 4 LOOKING WEST HTRON GENERAL NOTES: LEGEND: 1. THE CONTRACTOR SHALL KEEP ALL STREETS AND VEHICULAR TRAFFIC AREAS CLEAN. APPROXIMATE TRUCK ROUTE 2. THE CONTRACTOR IS RESPONSIBLE FOR ANY TRAFFIC AND PEDESTRIAN CONTROLS REQUIRED DURING THE DURATION OF X APPROXIMATE BOUNDARY OF NORTH THE PROJECT. LAUNCH RAMP REHANDLING SITE (PERIMETER FENCING) 3. THE CONTRACTOR SHALL INSTALL AND MAINTAIN PERIMETER FENCING AS REQUIRED TO MAINTAIN SECURITY OF SITE. (E) MAIN PEDESTRIAN PATH 4. THE CONTRACTOR SHALL PROTECT-IN-PLACE ALL STRUCTURES, UTILITIES, AND OBJECTS WITHIN THE WORK SITE. ANY DAMAGE TO THESE ITEMS CAUSED BY THE WORK SHALL BE REPAIRED BY THE CONTRACTOR AT THEIR EXPENSE. TEMPORARY PEDESTRIAN PATH DETOUR 5. OPERATION, TRANSIT, OR STAGING OF CONSTRUCTION EQUIPMENT AND PLACEMENT OF STOCKPILE OF MATERIAL SHALL BE CONDUCTED WITHIN THE PORTIONS OF THE LAGOON NECESSARY FOR DREDGING, TRANSPORT, AND OFFLOADING OPERATIONS AND UPLAND WITHIN THE PERIMETER FENCING. 82-20-5202 61-50-5202 02-50-5202 6. IF ADDITIONAL STAGING AREA SPACE IS REQUIRED IT IS THE CONTRACTORS RESPONSIBILITY TO ACQUIRE NECESSARY EASEMENTS AND AGREEMENTS AND COORDINATE USAGE AND ACCESS OF SUCH PLACES. :ETAD :ETAD :ETAD 7. CONTRACTOR TO ESTABLISH PEDESTRIAN DETOUR ROUTE. ROUTE TO BE COORDINATED WITH THE CITY. 8. EXISTING PARKING LOT IS DECOMPOSED GRANITE SURFACE. 1# MUDNEDDA 9. CONTRACTOR TO PROVIDE PEDESTRIAN ACCESS TO THE EXISTING MAIN PEDESTRIAN PATH OUTSIDE OF WORK HOURS. GJ 541042 NWOHS ZT :YB DENGISED YA :YB NWARD :YB DEKCEHC .oN TCEJORP SA :ELACS :LATTIMBUS 10. THE CONTRACTOR IS ALLOWED TO REMOVE BOLLARDS AT THE ACCESS ROAD, BUT SHALL REPLACE THEM IN-KIND. 50' 0' 50' 100' 1 SCALE: 1''=50' CQ SHEET ______ OF ______ 4 9 ETAD
YB
NOITPIRCSED
.ON .VER M
DVLB 69549 OC.LOHCINTTAFFOM.WWW AINROFILAC AC 1145-449-529 005 ,KEERC ETIUS TUNLAW .N 5812
ETIS TNEMIDES GNILDNAHER TCEJORP 600C64 .ON NOOGAL TCEJORP LAVOMER HCNUAL ANIRAM YTIC HTRON
82-20-5202 61-50-5202 02-50-5202 :ETAD :ETAD :ETAD GJ ZT :YB :YB DENGISED YA :YB DEKCEHC NWARD CQ 1# MUDNEDDA 541042 NWOHS .oN :LATTIMBUS TCEJORP SA :ELACS

.ON
.VER
SHEET ______ OF ______
ETAD
YB
NOITPIRCSED
82-20-5202
:ETAD
ZT :YB DENGISED
ETIS
GNILDNAHER
HCNUAL
HTRON
DVLB
AINROFILAC
.N
5812
61-50-5202
:ETAD
YA :YB NWARD
005
ETIUS
69549
AC
,KEERC
TUNLAW
TNEMIDES
NOOGAL
ANIRAM
02-50-5202
:ETAD
GJ :YB DEKCEHC
CQ
1145-449-529
541042 .oN TCEJORP
MOC.LOHCINTTAFFOM.WWW
TCEJORP
LAVOMER
NWOHS SA :ELACS
600C64
.ON
TCEJORP
YTIC
1#
MUDNEDDA
:LATTIMBUS
C CONSTRUCTION ACCESS PLAN - NORTH LAUNCH REHANDLING SITE
2 SCALE: 1" = 50'
GENERAL NOTES:
1. THE CONTRACTOR SHALL KEEP ALL STREETS AND VEHICULAR TRAFFIC AREAS CLEAN.
2. THE CONTRACTOR IS RESPONSIBLE FOR ANY TRAFFIC AND PEDESTRIAN CONTROLS REQUIRED DURING THE DURATION OF
THE PROJECT.
3. THE CONTRACTOR SHALL INSTALL AND MAINTAIN PERIMETER FENCING AS REQUIRED TO MAINTAIN SECURITY OF SITE.
4. THE CONTRACTOR SHALL PROTECT-IN-PLACE ALL STRUCTURES, UTILITIES, AND OBJECTS WITHIN THE WORK SITE. ANY
DAMAGE TO THESE ITEMS CAUSED BY THE WORK SHALL BE REPAIRED BY THE CONTRACTOR AT THEIR EXPENSE.
5. OPERATION, TRANSIT, OR STAGING OF CONSTRUCTION EQUIPMENT AND PLACEMENT OF STOCKPILE OF MATERIAL SHALL BE
CONDUCTED WITHIN THE PORTIONS OF THE LAGOON NECESSARY FOR DREDGING, TRANSPORT, AND OFFLOADING
OPERATIONS AND UPLAND WITHIN THE PERIMETER FENCING.
6. IF ADDITIONAL STAGING AREA SPACE IS REQUIRED IT IS THE CONTRACTORS RESPONSIBILITY TO ACQUIRE NECESSARY
EASEMENTS AND AGREEMENTS AND COORDINATE USAGE AND ACCESS OF SUCH PLACES.
7. CONTRACTOR TO ESTABLISH PEDESTRIAN DETOUR ROUTE. ROUTE TO BE COORDINATED WITH THE CITY.
8. EXISTING PARKING LOT IS DECOMPOSED GRANITE SURFACE.
9. CONTRACTOR TO PROVIDE PEDESTRIAN ACCESS TO THE EXISTING MAIN PEDESTRIAN PATH OUTSIDE OF WORK HOURS.
10. THE CONTRACTOR IS ALLOWED TO REMOVE BOLLARDS AT THE ACCESS ROAD, BUT SHALL REPLACE THEM IN-KIND.
4 9
MA
84:11
4202/03/21
| teSteehS_\evitcA_\DDAC
02\lavomeR
tnemideS
noogaL
aniraM 541042\CW\:Q
J HART CLINTON DR
MARINA LAGOON
P2
X X X X 4
(E) MAIN PEDESTRIAN
X PATH (SEE NOTE 9)
X ( ( S E E ) P E A N R O K T IN E G 8 ) LOT (E ( ) D L O IG N H O T T P D O IS LE T , U T R Y B P ) O A D L (E A ) U B N O C A H T RAMP
R
TEMPORARY PEDESTRIAN X P1 (E) ( P O U V B E L R IC H E U A T D IL I P T O Y W E E A R SE L M IN E E N S T ) H O R
PATH DETOUR, SEE NOTE 7 4 N C P1 VIEW OF BOAT LAUNCH RAMP
X A 4 LOOKING SOUTHEAST
(E) BOAT 1
X LAUNCH RAMP
(E) PUBLIC UTILITY
EASEMENT (OVERHEAD (E) PEDESTRIAN PATH
X POWER LINES)
X
(E) LIGHT POLE
APPROXIMATE BOUNDARY OF (E) BOAT (PROTECT IN
EXISTING UTILITIES NORTH LAUNCH REHANDLING SITE LAUNCH PLACE), TYP
(DO NOT DISTURB) RAMP
MARINA LAGOON
(E) SINGLE LANE
ACCESS ROAD TO
REHANDLING SITE
(E) BOLLARDS, TYP
SEE NOTE 10.
P2 VIEW OF ACCESS ROAD
4 LOOKING WEST
LEGEND:
APPROXIMATE TRUCK ROUTE
X APPROXIMATE BOUNDARY OF NORTH
LAUNCH RAMP REHANDLING SITE
(PERIMETER FENCING)
(E) MAIN PEDESTRIAN PATH
TEMPORARY PEDESTRIAN PATH DETOUR
50' 0' 50' 100' 1 SCALE: 1''=50'

ETAD 1 YB NOTES: 1. PROVIDED BY THE CITY. 2. PROVIDED FOR THE CONTRACTORS NOITPIRCSED INFORMATION & REFERENCE. 3. THE A/E MAKES NO GUARANTEE OR WARRANTY OF THE ACCURACY OR COMPLETENESS OF THIS SHEET. .ON .VER MOC.LOHCINTTAFFOM.WWW DVLB 69549 AINROFILAC AC 1145-449-529 005 ,KEERC ETIUS TUNLAW .N 5812 TNEMIDES TCEJORP 600C64 sPMB NOITCURTSNOC .ON NOOGAL TCEJORP LAVOMER ANIRAM YTIC 82-20-5202 61-50-5202 02-50-5202 :ETAD :ETAD :ETAD 1# MUDNEDDA GJ 541042 NWOHS ZT :YB :YB DENGISED YA :YB NWARD DEKCEHC .oN TCEJORP SA :ELACS :LATTIMBUS CQ 9 9 SHEET ______ OF ______ ETAD
YB
NOITPIRCSED
.ON .VER
MOC.LOHCINTTAFFOM.WWW DVLB 69549 AINROFILAC AC 1145-449-529 005 ,KEERC ETIUS TUNLAW .N 5812
TNEMIDES TCEJORP 600C64 sPMB NOITCURTSNOC .ON NOOGAL TCEJORP LAVOMER ANIRAM YTIC
82-20-5202 61-50-5202 02-50-5202 :ETAD :ETAD :ETAD GJ ZT :YB :YB DENGISED YA :YB DEKCEHC NWARD CQ 1# MUDNEDDA 541042 NWOHS .oN :LATTIMBUS TCEJORP SA :ELACS

sPMB
NOITCURTSNOC
9 9
.ON
.VER
SHEET ______ OF ______
MA
84:11
4202/03/21
| teSteehS_\evitcA_\DDAC
02\lavomeR
tnemideS
noogaL
aniraM
541042\CW\:Q
ETAD
YB
NOITPIRCSED
82-20-5202
:ETAD
ZT
:YB DENGISED
DVLB
AINROFILAC
.N
5812
61-50-5202
:ETAD
YA :YB NWARD
005
ETIUS
69549
AC
,KEERC
TUNLAW
TNEMIDES
NOOGAL
ANIRAM
02-50-5202
:ETAD
GJ :YB
DEKCEHC
CQ
1145-449-529
541042
.oN TCEJORP
MOC.LOHCINTTAFFOM.WWW
TCEJORP
LAVOMER
NWOHS
SA :ELACS
600C64
.ON
TCEJORP
YTIC
1#
MUDNEDDA
:LATTIMBUS
1
NOTES:
1. PROVIDED BY THE CITY.
2. PROVIDED FOR THE CONTRACTORS
INFORMATION & REFERENCE.
3. THE A/E MAKES NO GUARANTEE OR
WARRANTY OF THE ACCURACY OR
COMPLETENESS OF THIS SHEET.

DDooccuussiiggnn EEnnvveellooppee IIDD:: 755EB872077A6259--EDAED45D--44145172--B813CEF8--AA3415BB3349FAE0FB565D33
State of California - Natural Resources Agency GAVIN NEWSOM, Governor
DEPARTMENT OF FISH AND WILDLIFE CHARLTON H. BONHAM, Director
Bay Delta Region
2825 Cordelia Road, Suite 100
Fairfield, CA 94534
R3lsa@wildlife.ca.gov
www.wildlife.ca.gov
June 12, 2025
Katherine Sheehan
City of San Mateo Public Works Department
330 West 20th Avenue
San Mateo, CA 94403
(650) 522-7300
ksheehan@cityofsanmateo.org
AMENDMENT OF LAKE OR STREAMBED ALTERATION AGREEMENT
NOTIFICATION NO. 1600-2013-0268-R3, Marina Lagoon General Maintenance Project
Dear Matt Fabry:
The California Department of Fish and Wildlife (CDFW) has received your request to
amend the above referenced Lake or Streambed Alteration Agreement (Agreement)
and the required fee in the amount of $1,882.25, for a major amendment. Your request
to amend the Agreement includes:
Modifying the project's maximum sediment removal from 750 cubic yards of
sediment per outfall to a cumulative maximum of 2,000 cubic yards of sediment
removal across all previously identified maintenance sites;
Redefining the type(s) of dredging equipment to be used to include an excavator
with standard or long-reach arm stationed from a float or similar, in addition to an
Aquamog;
Adding an additional sediment dewatering site to the project, at the northern
portion of Joinville Park adjacent to the boat ramp at Latitude 37.569838,
Longitude -122.290927; and
Removing Measure 2.5, Seasonal Work Period for Activities near Joinville Park.
The project will adhere to the seasonal work period specified in Measure 2.1 for
all dredging activities.
CDFW hereby agrees to amend the Agreement with addition of the following conditions:
2.30 Limits on Sediment Removal in the Lagoon. Sediment removal shall be limited to
the amounts and timing specified in the Project Description. Specifically, sediment
removal shall be limited to a cumulative maximum of 2,000 cubic yards in each
year.
All other conditions in the Agreement remain in effect unless otherwise noted herein.
Conserving California's Wildlife Since 1870

DDooccuussiiggnn EEnnvveellooppee IIDD:: 755EB872077A6259--EDAED45D--44145172--B813CEF8--AA3415BB3349FAE0FB565D33
Matt Fabry
1600-2013-0268-R3
June 12, 2025
The Agreement and this amendment letter must be readily available at project work
sites and must be presented when requested by a CDFW representative or agency with
inspection authority.
If you have any questions regarding this letter, please contact Shannon Husband,
Environmental Scientst at (707) 337-1364 or by email at
Shannon.Husband@wildlife.ca.gov.
Sincerely,
Craig Weightman, Environmental Program Manager
ec: California Department of Fish and Wildlife
Wesley Stokes, Senior Environmental Scientist (Supervisor)
Wesley.Stokes@wildlife.ca.gov
ACKNOWLEDGEMENT
I hereby agree to the above-referenced amendment.
Katherine Sheehan for Matt Fabry, Director of P6u/b1l2i/c2 0W2o5rks
Print Name: _______________________________ Date: ____________________
Signature: ________________________________
Rev. 06/26/2023 Page 2 of 2

Jessica Vargas May 28, 2025
Department of the Army
San Francisco District, Corps of Engineers
450 Golden Gate Avenue, 4th Floor, Suite 0134
San Francisco, CA 94102
Jessica Vargas:
On behalf of Jaclyn Gnusti of Moffatt & Nichol and James Yang of the City of San Mateo
Department of Public Works, please find our report "Characterization of the Sediment from the
Marina Lagoon in San Mateo, CA: Results of Sediment Sampling and Analysis" for review at
the May 28th DMMO meeting. An electronic copy of this report has been uploaded to the
DMMO website for DMMO participating agency representatives to access.
If you have any questions, please give me a call at (707) 207-7778. I look forward to hearing
from you.
Sincerely,
Mike McElroy
Sr. Project Manager
(w/ enc): Brenda Goeden, BCDC
Selina Louie, SFRWQCB
Jennifer Siu, U.S. EPA
Marlene Schroeder, CSLC
Arn Aarreberg, CDFW
Sara Azat, NMFS
Jaclyn Gnusti, Moffatt & Nichol
James Yang, City of San Mateo

DATA REPORT
Characterization of the Sediment from the Marina Lagoon
in San Mateo, CA: Results of Sediment Sampling and
Analysis
Permits
USACE Permit # 2000-257530S
BCDC Permit # M2004.030.00 Amendment No. 1
RWQCB CIWQS Place ID # 445464
CDFW SAA:1600-2013-0268-R3
Prepared for
City of San Mateo, Public Works Department
330 W. 20th Avenue
San Mateo, CA 94403
Prepared by
Pacific EcoRisk
2250 Cordelia Road
Fairfield, CA 94534
May 2025

Pacific EcoRisk Environmental Consulting and Testing
Table of Contents
Page
1. INTRODUCTION ...................................................................................................................... 1
1.1 Project Overview .................................................................................................................. 1
1.2 Objectives of the Sediment Investigation ............................................................................. 2
1.3 Organization of this Document ............................................................................................ 2
2. FIELD SEDIMENT SAMPLE COLLECTION ......................................................................... 6
3. SAMPLE PROCESSING ......................................................................................................... 11
3.1 Homogenization and Compositing of Sediments ............................................................... 11
3.2 Shipping of Sediment Samples to the Analytical Laboratories .......................................... 11
3.2.1 Chain-of-Custody (COC) Protocol .............................................................................. 11
4. RESULTS OF PHYSICAL/CHEMICAL ANALYSES ........................................................... 13
4.1 ML-2025-DU1 Analytical Chemistry Results ................................................................... 13
5. QUALITY CONTROL REVIEW ............................................................................................ 19
5.1 Sediment Conventional and Chemical Analytical QA/QC Summary ................................ 19
6. SUMMARY .............................................................................................................................. 21
7. REFERENCES ......................................................................................................................... 22
i

Pacific EcoRisk Environmental Consulting and Testing
Appendices
Appendix A Sampling Field Logs and Data Sheets
Appendix B Eurofins Data Report for the Sediment Analyses
List of Figures
Page
Figure 1-1. Location Map: San Mateo Marina Lagoon .................................................................. 3
Figure 1-2. Vicinity Map: San Mateo Marina Lagoon ................................................................... 4
Figure 1-3. Project Map: San Mateo Marina Lagoon - North Dredge Boundary .......................... 5
Figure 1-3. Project Overview: San Mateo Marina Lagoon ............................................................. 6
Figure 2-1. Site Map: Proposed and Actual Sample Locations - San Mateo Marina Lagoon ....... 8
Figure 2-2. Proposed and Actual Sample Locations: San Mateo Marina Lagoon - North
Dredge Boundary .......................................................................................................... 9
Figure 2-3. Proposed and Actual Sample Locations: San Mateo Marina Lagoon - South
Dredge Boundary ........................................................................................................ 10
List of Tables
Page
Table 1-1. City of San Mateo Marina Lagoon Dredging Volumes ................................................ 2
Table 2-1. Locations of Sampling Stations and Core Depths Achieved ......................................... 7
Table 4-1. San Mateo Lagoon 2025 Sediment Sample Chemistries ............................................ 14
ii

Pacific EcoRisk Environmental Consulting and Testing
List of Acronyms
Bay San Francisco Bay
BCDC Bay Conservation and Development Commission
CDFW California Department of Fish and Wildlife
City City of San Mateo
COC Chain-of-custody
DDT Dichlorodiphenyltrichloroethane
DMMO Dredged Material Management Office
Eurofins Eurofins Calscience
GPS Global positioning system
HDPE High density polyethylene
IDA Isotope Diltution Analyte
ITM Inland Testing Manual
Lagoon Marina Lagoon
LCS Laboratory Control Sample
g/kg Microgram per kilogram
mg/kg Milligram per kilogram
MLLW Mean lower low water
MDL Method detection limit
MS Matrix Spike
MSD Matrix Spike Duplicate
NAVD88 North American Vertical Datum 1988
OCI Organochlorine
PAH Polycyclic aromatic hydrocarbons
PCB Polychlorinated biphenyls
PER Pacific EcoRisk, Inc.
QA/QC Quality assurance/quality control
RRF Relative response factor
SAP Sampling and Analysis Plan
SFEI San Francisco Estuary Institute
SFRWQCB San Francisco Regional Water Quality Control Board
TEG TEG Oceanographic Services
TMDL Total maximum daily load
TOC Total organic carbon
USACE U.S. Army Corps of Engineers
iii

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Monrovia Library Story Room Expansion Department: Public Works RFP Number: A-1002 Start Date:

City of Monrovia

Bid Due: 8/19/2026

RFB 25-26-30 Annual Contract for Custom Branding Services for Recreation Division Apparel and

City of Visalia

Bid Due: 9/03/2026

0820 - 0820 ON-CALL ELEC. SERVS. FOR EV/PV INSTALLS, AND INSIDE WIREMAN WORK

City of Los Angeles

Bid Due: 8/11/2026

RFx Name: BPM013316 RFx Begin Date (UTC+0): RFQ - AS-NEEDED MEDICAL WASTE REMOVAL

County of San Diego

Bid Due: 8/07/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.