| Location: | Massachusetts |
|---|---|
| Posted: | Oct 3, 2024 |
| Due: | Nov 7, 2024 |
| Agency: | Town of Barnstable |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY25-IFB-026 Sub-Bid Plumbing |
| Publication URL: | To access bid details, please log in. |
Project Description: The scope of work, without limiting the generality thereof, includes all labor, materials, equipment and services required to perform the work described fully in the Drawings and Specifications and includes, but is not limited to the following major work: Construction of a renovation including, but not limited to: wood framing. sheathing and air barrier. concrete work. carpentry, waterproofing, damp proofing, caulking, roofing, doors and windows, interior finishes. mechanical, plumbing, and electrical, sitework and utilities work.

With GovernmentContracts, you can:
...UMA26-11 Student Union Waterproofing and Walkway Renovations www.biddocsonline.com for bid...
University of Massachusetts
Bid Due: 6/11/2026
.... The scope includes applying fluid-applied waterproofing systems, expansion joints, and drainage... to ...
Massachusetts Convention Center Authority
Bid Due: 6/12/2026
.... The scope includes applying fluid-applied waterproofing systems, expansion joints, and drainage... to ...
Massachusetts Convention Center Authority
Bid Due: 6/12/2026
...2,400 square feet. SUB-BID CATEGORIES: Masonry, Miscellaneous and Ornamental Iron, Waterproofing, Damp...
Town of Bedford
Bid Due: 12/27/2027