Forsyth Tech Northwest Campus Roof Replacement

Location: North Carolina
Posted: Apr 6, 2026
Due: Apr 27, 2026
Agency: State Government of North Carolina
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 97-FT-260604B
Publication URL: To access bid details, please log in.
Solicitation Number: 97-FT-260604B
Project Title: Forsyth Tech Northwest Campus Roof Replacement
Description: Forsyth Tech will be replacing approx. 2,800 sq.ft. of PVC roofing at our King, NC Northwest Campus.
Opening Date: 4/27/2026 2:00 PM
Posted Date: 4/6/2026
Status: Open
Department: FORSYTH TECHNICAL COMMUNITY COLLEGE
Solicitation Number
*
97-FT-260604B
Department
FORSYTH TECHNICAL COMMUNITY COLLEGE
Status Reason
Open
Opening Date
2026-04-27T14:00:00.0000000
Posted Date
*
2026-04-06T14:52:03.0000000Z
Primary Commodity Code
Building maintenance and repair services
Mandatory Conference/Site Visit
Special Instructions
Pre-bid meeting and site walk to be held on Thursday April 16th at 1 PM - Northwest Campus 3111 Big Oaks Dr., King NC 27021. This not a mandatory meeting.
Solicitation Type
*
Select RFP IFB RFI
Owner
Heather Brazell
Description
Forsyth Tech will be replacing approx. 2,800 sq.ft. of PVC roofing at our King, NC Northwest Campus.

Attachment Preview

FORSYTH TECHNICAL COMMUNITY COLLEGE
PROJECT LOCATION
NORTHWEST CAMPUS CENTER
3111 BIG OAKS DRIVE
KING, NC
PROJECT LOCATION
VICINITY MAP
NORTHWEST FORSYTH CENTER
PROJECT AREA
1.01
CAMPUS MAP
DRAWINGS
C01 COVER SHEET
AP-1 APPENDIX B
DP01 DETAIL PLAN
R-1 ROOF DETAILS
R-2 ROOF DETAILS
TP01 TAPER PLAN
UP01 WIND UPLIFT PRESSURE
1 BUILDING PLAN
C01 SCALE: 1/8 = 1'
LINETYPE LEGEND
- CONDENSATION LINE
- GAS LINE
- GUTTER
- ELECTRICAL CONDUIT
- EXPANSION JOINT
- PVC PIPE
V
X
XX
LEGEND
A
H
FOR CONSTRUCTION
COVER SHEET
C01
FOR CONSTRUCTION
APPENDIX B
AP-1
3
R-1
3
R-1
1
5/6
R-2
R-1
5/6
R-1
1
R-2
3
R-1
3
3
R-1
R-1
ROOF AREA
01.01
1
R-1
3
R-1
4
R-1
3
R-1
3
R-1
3
R-1
5/6
1
R-1
R-2
2
R-1
3
4
R-1
R-1
1
R-2
5/6
R-1
1 DETAIL PLAN
DP01 SCALE: 1/4" = 1'
1/DP01
SITE MAP
FOR CONSTRUCTION
DETAIL PLAN
DP01
EXISTING ISOCYANURATE INSULATION 4"
EXISTING MEMBRANE. REMOVE 12" WIDE STRIPS @ 48" O.C.
NEW 1.5'' OF ISOCYANURATE INSULATION MECHANICALLY ATTACHED
TO MEET REQUIRE WIND UPLIFT PER FM GLOBAL
1/4" FIBERGLASS REINFORCED SILICON IMPREGNATED
GYPSUM COVER BOARD SET IN FOAM INSULATION ADHESIVE
NEW FULLY ADHERED PVC
FLEECE BACK MEMBRANE
XXXXXXXXXXXXXX
PIPE /PENETRATION
WATER STOP
STAINLESS STEEL MECHANICAL
DRAW BAND, TYPICAL
PRE-MOLDED PIPE BOOT
STAINLESS STEEL MECHANICAL
DRAW BAND, TYPICAL
HEAT WELD
NEW PVC MEMBRANE
XXXXXXXXXXXXXX
WHERE SOIL STACK IS TOO
LOW OR BROKEN SLIP PVC
PIPE & COUPLING OVER
EXISTING PIPE & CAULK AS
REQUIRED
8" MIN
EXISTING METAL DECK
1 ASSEMBLY DETAIL
R-1 SCALE: 1-1/2" = 1'
INSULATION SYSTEM
2 SOIL STACK / PIPE PENETRATION DETAIL
R-1 SCALE: 3" = 1'
EXISTING MEMBRANE
EXISTING WOOD BLOCKING
HEAT WELD
STRIP-IN PLY
NEW PVC MEMBRANE
AS SPECIFIED
XXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXX
HEAT WELD
1/2" SILICON IMPREGNATED FIBERGLASS
REINFORCED GYPSUM BOARD ATTACHED
W/ MASONRY DRIVE \PINS @ 12" O.C.
FULLY ADHERED NON-FLEECE
BACK PVC FLASHING MEMBRANE
24 GA PVC COATED CLEAT FASTENED W/
ROOFING NAILS - TWO ROWS @ 12" O.C.
HAND CRIMP
24 GA. PRE-FINISHED METAL FASCIA
22 GA. GALVANIZED STEEL
CONTINUOUS CLEAT - FASTENED
@ 12" O.C. W/ #12 SCREWS
NON- FLEECE BACK PVC
FLASHING MEMBRANE
EXISTING ALUMINUM FASCIA
TERM BAR FASTENED @ 6" O.C.
NEW MEMBRANE HEAT WELD
AS SPECIFIED
XXXXXXXXXXXXXXXXXX
NEW COVER BOARD
EXISTING INSULATION
NEW INSULATION
EXISTING METAL DECK
4 EDGE/ METAL PANEL DETAIL
R-1 SCALE: 3" = 1'
STARTER TUBE
3/16" POP RIVETS @ 1" O.C.
PRE-FINISHED STEEL HANGER STRAP
@ 5' O.C. - MECHANICALLY
ATTACHED W/ 1/4" DRIVE PINS
4" X 6" X 22 GA. PRE-FINISHED
STEEL DOWNSPOUT
DAYLIGHT EXISTING
METAL ROOF
5 DOWN SPOUT DETAIL
R-1 SCALE: 1-1/2" = 1'
ADD WOOD NAILERS AS
NECESSARY TO MAINTAIN 8"
MINIMUM FLASHING HEIGHT
26 GA. STAINLESS STEEL
C'FLASHING CORNERS
RIVETED 1" O.C. & SOLDERED
8"
MIN.
T-JOINT
INSULATE EXISTING CURB INSULATE
EXISTING CURB W/ 24 GA. GALVANIZED
MECHANICAL SEAM FASTENING
PLATES & SCREWS @ 12" O.C.
3 TYPICAL CURB DETAIL
R-1 SCALE: 1" = 1'
OVERLAY VERTICAL
xxxxxxxxxxxxxxxxxx
SEAMS
ADHERE FLASHING
MEMBRANE
MEMBRANE
INSULATION SYSTEM
6"
12"
6 COLLECTOR HEAD DETAIL
R-1 SCALE: 3" = 1'
FOR CONSTRUCTION
ROOF DETAILS
R-1
EXTEND SCUPPER 1" BEYOND
EXTERIOR WALL & CAULK
24 GA. PRE-FINISHED SCUPPER PLATE- HEM ALL
EDGES AND INSTALL W/ 1/4 " X 1 1/2" EXPANSION
FASTENERS AND CAULK
EMXAISTCTIHNG
MEAXTISCTHING
TERMINATION BAR
FASTENED @ 6" O.C.
24 GA. PVC COATED STEEL
SCUPPER LINER- FASTEN @ 3"
O.C. & HEAT WELD TO MEMBRANE
FLASHING MEMBRANE
ROOF MEMBRANE
INSULATION SYSTEM
NOTE:
CONTRACTOR TO RAISE SCUPPERS AS REQUIRED TO
BE FLUSH W/ NEW ROOF ASSEMBLY. PACK VOID W
INSULATION AND INCREASE SCUPPER PLATE TO
COVER EXISTING VOID AS NECESSARY.
1 TYP. TROUGH WALL SCUPPER
R-2 SCALE: 1" = 1'
XXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXX
THROUGH WALL SCUPPER
EXTEND THE
SCUPPER INTO THE
COLLECTOR HEAD.
1.5" OVERFLOW
NEW 6" X 12" COLLECTOR HEAD
PRE-FINISHED STEEL
HANGER STRAP 5' O.C. MAX.
DISCHARGE NE DOWNSPOUT
ON TO EXISTING STANDING
SEAM METAL ROOF
2 SECTION AT THROUGH WALL SCUPPER
R-2 SCALE: 1-1/2" = 1'
FOR CONSTRUCTION
ROOF DETAILS
R-2
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Replacements Facilities/Bond RFQ AE Services for Roof Replacements Facilities/Bond RFQ AE Services for ...

Guilford County Schools

Bid Due: 6/09/2026

...Replacements Facilities/Bond RFQ AE Services for Roof Replacements Facilities/Bond RFQ AE Services for ...

Guilford County Schools

Bid Due: 6/09/2026

...Replacements Facilities/Bond RFQ AE Services for Roof Replacements Facilities/Bond RFQ AE Services... for ...

Guilford County Schools

Bid Due: 6/04/2026

...Project: Discovery Place PH II Roof Replacement Ref. #: 269-2026-232 Department: City Procurement... ...

City of Charlotte

Bid Due: 6/23/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.