| Location: | California |
|---|---|
| Posted: | Aug 26, 2026 |
| Due: | Sep 9, 2026 |
| Agency: | Santa Clara County Office of Education |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | iB 02_26_27 |
| Publication URL: | To access bid details, please log in. |
| Bid Identifier: iB 02_26_27 | |
| CHRISTOPHER RANCH PLAYGROUND TURF | |
| Additional Resources: | |
| Awarded Vendor: | |
| Awarded Date: | |
| Awarding Agency: | Purchasing Services |
| Agency Contact: | Josephine Dy-Liacco |
| Phone (Agency): | 408-453-6854 |
| Piggybackable? | Contact Vendor |
| Issuance Date: | 8/13/2026 |
| Due Date/Time: | 09/09/2026 / 3:00pm |
| Bid Status: | Open |
| Note: | |
| Project Title: Christopher Ranch Playground Turf Replace |
|---|
| Drawing Title: Title Page |
| REV Descrip(cid:415)on Date A(cid:425)achment 4.1 08/10/26 |
| Sheet No.: 01 |
Project No.: iB 02 _26_27 Project Title:
Christopher Ranch
Christopher Ranch Playground Turf Replacement Playground Turf Replace
Drawing Title:
Title Page
A(cid:425)achment 4.1
Scope of Work Plans
REV Descrip(cid:415)on Date
A(cid:425)achment 4.1 08/10/26
Loca(cid:415)on:
305 Bloomfield Avenue, Gilroy, CA 95020
Sheet No.:
01
| Project Title: Christopher Ranch Playground Turf Replace |
|---|
| Drawing Title: Overall Site Plan |
| REV Descrip(cid:415)on Date A(cid:425)achment 4.1 08/10/26 |
| Sheet No.: 02 |
Project Title:
Christopher Ranch
Playground Turf Replace
Drawing Title:
Overall Site Plan
REV Descrip(cid:415)on Date
A(cid:425)achment 4.1 08/10/26
Sheet No.:
02
| Project Title: Christopher Ranch Playground Turf Replace |
|---|
| Drawing Title: Site Access Plan |
| REV Descrip(cid:415)on Date A(cid:425)achment 4.1 08/10/26 |
| Sheet No.: 03 |
Project Title:
Christopher Ranch
GATE
Playground Turf Replace
Drawing Title:
Site Access Plan
PARKING
REV Descrip(cid:415)on Date
A(cid:425)achment 4.1 08/10/26
Sheet No.:
03
| Project Title: Christopher Ranch Playground Turf Replace |
|---|
| Drawing Title: Scope of Work |
| REV Descrip(cid:415)on Date A(cid:425)achment 4.1 08/10/26 |
| Sheet No.: 04 |
Scope of Work:
1. Material Submittal
A. Provide material & system data, installa(cid:415)on procedures, warranty data, infill specifica(cid:415)ons, and
color samples to District for review.
2. Temporary Fencing
A. Install temporary safety fencing (to be removed upon comple(cid:415)on of project).
B. Provide temporary modifica(cid:415)on of the exis(cid:415)ng exterior fence to install a secured access gate for Project Title:
construc(cid:415)on personnel, equipment, and material access.
C. Upon comple(cid:415)on of the work, remove the temporary access gate and restore the affected fence
TEMP GATE ACCESS Christopher Ranch
to its original condi(cid:415)on, including repair or replacement of fence fabric, posts, fi(cid:427)ngs, and associat-
ed components as required. Playground Turf Replace
3. Removal & Disposal
A. Remove exis(cid:415)ng surface materials within designated area (e.g., turf, grass, base materials as ap-
plicable). Drawing Title:
B. Legally dispose of all removed materials off-site in accordance with local and State regula(cid:415)ons.
C. Protect exis(cid:415)ng structures, u(cid:415)li(cid:415)es, and surrounding landscaping during removal opera(cid:415)ons.
Scope of Work
4. Subgrade Preparation
A. Contractor shall prepare the exis(cid:415)ng subgrade to receive new ar(cid:415)ficial turf system, including mi-
nor grading, leveling, compac(cid:415)on, and moisture condi(cid:415)oning sufficient to meet manufacturer toler-
ances.
B. Contractor shall verify drainage and adjust subgrade as necessary to prevent ponding.
5. Existing Structures
A. Contractor shall work around exis(cid:415)ng play and shade structures; no removal or reloca(cid:415)on of
these structures is included in the Base Bid.
B. Installa(cid:415)on under and adjacent to these structures shall result in a flush, uniform finished surface.
C. Proper slope and eleva(cid:415)on for drainage, safety, and accessibility shall be maintained.
REV Descrip(cid:415)on Date
6. Arti(cid:976)icial Turf Installation
A(cid:425)achment 4.1 08/10/26
A. Install new ar(cid:415)ficial turf system in accordance with manufacturer specifica(cid:415)ons and applicable
codes.
B. System shall include turf, infill material, base layer, and edge restraint as required.
C. Provide proper seam installa(cid:415)on, anchoring, and infill distribu(cid:415)on to ensure durability and uni-
form appearance.
D. Finish surface shall be smooth, even, and free of wrinkles, seams, or trip hazards.
E. Contractor shall ensure smooth transi(cid:415)ons between turf and adjacent surfaces (e.g., concrete,
PIP, walkways).
7. Compliance Requirements
A. Contractor must hold appropriate California contractor license (typically C-27 or appropriate clas-
sifica(cid:415)on).
B. Contractor must be registered with the DIR pursuant to Labor Code 1725.5.
C. Prevailing wages apply (Labor Code 1720 et seq.).
D. All work shall comply with applicable State, local, and manufacturer codes and standards.
Sheet No.:
8. Protection / CleanUp
04
A. Protect exis(cid:415)ng structures, surrounding landscaping, and site features.
B. Remove debris daily and leave the site clean and safe for student use

With GovernmentContracts, you can:
...Civic Center Non-Functional Turf Replacement Status: Closes: Open 9/29/2026 9:00 AM...
City of Rancho Santa Margarita
Bid Due: 9/29/2026
...Basic Information Title Sourcewell Turf and Athletic Surfacing Solutions w Equip Materials... turf ...
State Government of California
Bid Due: 10/15/2026
...Notice Inviting Bids Bid No. C26-27-2 HMS Synthetic Field Turf Replacement Project No. ...
Hawthorne School District
Bid Due: 10/01/2026
...and reconstruction of existing 6' H chain link fencing, modifications to existing irrigation, ...
Norwalk-La Mirada Unified School District
Bid Due: 10/01/2026