| Location: | North Carolina |
|---|---|
| Posted: | Jun 10, 2025 |
| Due: | Jul 18, 2025 |
| Agency: | North Carolina State University |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Institution | UNC Greensboro | |||||
|
Institution URL for Additional
Information about this Project (Optional) |
https://fac.uncg.edu/wp-content/uploads/20250606_Campus-Steam-and-Condensate-CMR-Ad-Package.pdf | |||||
| Project Name | Campus Steam & Condensate Infrastructure Improvements | |||||
| Project Manager | Tim Rouse | |||||
| Phone Number | (336) 334-4317 | |||||
| Contact Email | tsrouse2@uncg.edu | |||||
| Pre-proposal Date | 06/20/2025 | |||||
| Pre-proposal Time | 2:00 pm | |||||
| Pre-proposal Location | Via MS Teams Meeting -See URL for details | |||||
| Closing Date | 07/18/2025 | |||||
| Project Budget |
|
|||||
| Project Description |
One-Two Sentences
This project will replace and renew critical portions of the existing steam distribution system. Project focus will be on sections between Manhole(MH) #11 to MH #15, MH #54 to MH #57, and piping between MH #27 to the Music Building/Peabody Park Bridge, and possibly including the section from MH #15 to MH #17. All work will be integrated with the campus automation system (BAS). Construction is envisioned to be sequenced to limit overall disruption to the highly visible and occupied portion of central campus. See link above for additional information about this project and submission requirements. All submissions should be sent electronically to fdc@uncg.edu, and are due by 12 p.m. (noon) on July 18, 2025.
|
|||||
| Submit To |
Tim Rouse UNC Greensboro fdc@uncg.edu tsrouse2@uncg.edu
|

With GovernmentContracts, you can: