RFB for Galvanized Tubular Steel Structures

Location: North Carolina
Posted: Mar 18, 2026
Due: Apr 21, 2026
Agency: Greenville Utilities
Type of Government: State & Local
Category:
  • 38 - Construction, Mining, Excavating, and Highway Mainenance Equipment
  • 95 - Metal Bars, Sheets, and Shapes
  • 96 - Ores, Minerals, and Their Primary Products
Solicitation No: 26-11
Publication URL: To access bid details, please log in.
Bid Number Title Due Date Other Files Tab Sheet
26-11 RFB for Galvanized Tubular Steel Structures Tue, 04/21/2026 - 02:00pm -

Attachment Preview

ADVERTISEMENT FOR BIDS
Sealed proposals will be received in the Office of the Procurement Manager, Greenville
Utilities Commission, 401 S. Greene Street, Greenville, North Carolina 27834 until 2:00 pm
(EDT) on April 21, 2026 and immediately thereafter publicly opened and read for the
furnishing of Galvanized Tubular Steel Structures.
Instructions for submitting bids and complete specifications will be available in the
Office of the Procurement Manager, Greenville Utilities Commission, 401 S. Greene Street,
Greenville, North Carolina during regular office hours, which are 8:30AM - 5:00PM Monday
through Friday.
Greenville Utilities Commission reserves the right to reject any or all bids. Late bids
will not be considered.

SECTION I
GENERAL INSTRUCTIONS FOR FORMAL BIDS
RELATED TO THE PURCHASE OF APPARATUS, SUPPLIES,
MATERIALS, AND EQUIPMENT
1. NOTICE TO BIDDERS
Sealed bids, subject to the conditions made a part hereof, will be received in the Office of
the Procurement Manager, Greenville Utilities Commission, 401 S. Greene Street,
Greenville, North Carolina 27834 until 2:00 pm (EST) on April 21, 2026, the day of
opening. Bids submitted in a fax or e-mail in response to this Invitation for Bids will not
be acceptable.
2. STANDARD FORMS REQUIRED
Each bidder must submit a proposal on the enclosed bid forms. The bid must be signed
by an authorized official of the firm. Return only the attached Proposal Form. Do
not return the Advertisement for Bids, Instructions to Bidders or Specifications.
3. PREPARATION OF BID
Bids must be in sealed envelopes clearly marked on the outside with the name of the bid
and the bid opening date and time. Bid shall be addressed to PROCUREMENT
MANAGER, GREENVILLE UTILITIES COMMISSION, 401 S. GREENE STREET,
GREENVILLE, NORTH CAROLINA 27834.
4. TIME FOR OPENING BIDS
Bids will be opened promptly and read at the hour and on the date set forth in the
advertisement in the Office of the Procurement Manager, Greenville Utilities Main Office,
401 S. Greene Street, Greenville, North Carolina. Bidders or their authorized agents are
invited to be present.
5. BID SECURITY
Each Proposal shall be accompanied by cash, cashier's check, or certified check drawn on
a bank insured with the Federal Deposit Insurance Corporation or the Savings Association
Insurance Fund, payable to the Owner, in an amount not less than five percent (5%) of the
total bid as a guarantee that a Purchase Order, if awarded, will be accepted. In lieu thereof,
an Original Bid Bond may be submitted by the Bidder in an amount not less than five
percent (5%) of the total bid.
6. NC SALES TAX
Do not include NC sales taxes in bid figure; however, Greenville Utilities Commission
(GUC) does pay sales tax. Sales tax should be added to the invoice as a separate item.

7. FEDERAL EXCISE TAX
GUC is exempt from Federal Excise Tax and will issue a Federal Exemption Certificate
upon request to the successful bidder.
8. EXCEPTIONS TO BE CLEARLY STATED
If bid is not in strict accordance with Section II, "Specifications," bidder must list or note
all exceptions on the Request for Proposal Form, otherwise, it is fully understood that
the successful bidder will furnish equipment and/or materials exactly as specified. GUC
reserves the right to accept or reject bids with noted minor deviations from specifications
and to determine the lowest responsible, responsive bid from the standpoint of quality,
performance, and price.
9. EVALUATION AND AWARD OF BIDS
GUC reserves the right to reject any and all bids, to waive any and all informalities, and to
disregard all nonconforming or conditional bids or counter proposals. In evaluating bids,
GUC shall consider whether the bids comply with the prescribed requirements, plus all
alternates or options requested. Delivery and price per pound of steel are the primary
determinants in the evaluation of all bids. References will also be used in the evaluation
process. GUC reserves the right to include or exclude any option or alternative in GUC's
opinion is in GUC's best interests. If a bid is to be awarded, it will be awarded to the
lowest responsible, responsive bidder whose evaluation by GUC indicates that the award
will be in GUC's best interests. Only firm prices will be considered for award of this bid.
10. PROMPT PAYMENT DISCOUNTS
Bidders are urged to compute all discounts into the price offered. If a prompt payment
discount is offered, it may be considered in the award of the contract.
11. NUMERICAL ERRORS
In the case of a discrepancy between a unit price and the extension (the unit price
multiplied by the number of units), the unit price governs. In the case where numerical
bids are stated both in numbers and in words, the words govern.
12. BID WITHDRAWAL
A bidder must notify GUC in writing of its request to withdraw a bid within seventy-two
(72) hours after the bid opening, not including Saturdays, Sundays, or holidays. In order
to justify withdrawal, the bidder must demonstrate that a substantial error exists and that
the bid was submitted in good faith.
13. MINORITY BUSINESS PARTICIPATION PROGRAM
GUC has adopted an Affirmative Action and Minority and Women Business Enterprise
Plan (M/WBE) Program. Firms submitting a proposal are attesting that they also have
taken affirmative action to ensure equality of opportunity in all aspects of employment,
and to utilize M/WBE suppliers of materials and/or labor.

14. DELIVERY TIME
Delivery time is to be stated and will be considered in the evaluation of bids. Failure by
the successful bidder to meet quoted delivery shall be interpreted as non-compliance with
these specifications and may be deemed sufficient cause for removal of the manufacturer
and/or distributor from our lists as acceptable manufacturers or bidders.
15. DELIVERY
Shipments will be made only upon individual releases from a blanket purchase order
issued by GUC in accordance with GUC's current needs. Time is of the essence with
respect to all deliveries under this Agreement. Delivery of all equipment, materials, or
supplies shall be made Free on Board (FOB) GUC Warehouse, 701 Utility Way,
Greenville, North Carolina 27834, unless otherwise specified. Transport by rail or
truck are the only acceptable delivery methods from the factory to GUC. The agreed
price for such equipment, materials, or supplies shall include all costs of delivery and
ownership, and risks of loss shall not be transferred from Provider to GUC until express
written acceptance of delivery and inspection by GUC. Delivery hours are between 8:00
AM and 4:30 PM Tuesday-Thursday only. GUC's purchase order number is to be
shown on the packing slip or any related documents. GUC reserves the right to refuse
or return any delivery with no purchase order number or which is damaged. GUC will not
be charged a restocking fee for any delivery which is refused or returned.
16. CONTRACT PERIOD
NA
17. MANUFACTURER
Bidder is to specify the manufacturer of items being quoted if applicable.
18. QUANTITIES
Quantities specified are only estimates of GUC's requirements. GUC reserves the right to
purchase more or less than the stated quantities at prices indicated in the submitted
Proposal Form based on our actual needs.
19. LIQUIDATED DAMAGES
Time is of the essence, and it is critical that materials are delivered on schedule and time is
allowed for the completion of the work in the Contract Agreement included herewith.
Damages for delay shall be at the rate of Four Thousand dollars ($4,000.00) per calendar
day for failure of the Manufacturer to deliver all materials within the timeframe specified in
the Manufacturer's Bid. No credit shall be given for early completion of the work.
20. CONTACT INFORMATION
Questions regarding this bid request should be directed to Cleve Haddock, Lifetime
CLGPO, Procurement Manager, at (252) 551-1533, haddocgc@guc.com. All questions
regarding this bid must be received by or before 5:00 pm (EDT) on March 31, 2026.

21. TERMS AND CONDITIONS
The attached Terms and Conditions apply to all purchases made by Greenville
Utilities Commission (GUC) and must be considered as part of the bid proposal.
[Balance of page left blank intentionally]

SECTION II
GREENVILLE UTILITIES COMMISSION
SPECIFICATIONS FOR GALVANIZED TUBULAR STEEL STRUCTURES
April 21, 2026
STEEL SINGLE POLE, AND H-FRAME STRUCTURES
1. SCOPE
This specification covers the design, materials, welding, inspection, protective coatings,
drawings and delivery of steel transmission single pole structures. The proposal
submitted by the manufacturer shall include field bolts, locknuts, vangs, attachment
provisions for arms and/or insulators, anchor bolts, base plates, and other necessary
items to make a complete structure. .lca files are available upon request. Manufacturer
shall optimize pole designs based on provided loads.
2. DEFINITIONS:
Cambering - the fabricating of a slight convex curve in a pole or crossarm
D/t - the ratio of the diameter of a tubular pole to the steel plate thickness
Engineer - a registered or licensed person, who may be a staff employee or an outside
consultant, and who provides engineering services. Engineer also includes duly
authorized assistants and representatives of the licensed person.
Ground Line - a designated location on the pole where the surface of the ground will be
after installation of a direct embedded pole
Load factors (LF) - a multiplier which is applied to each of the vertical, transverse and
longitudinal structure loads to obtain an ultimate load
P-delta (P-t1) moment - secondary moment created by the vertical loads acting on the
structure when the structure deflects from its unloaded position
Point of Fixity - location on the pole at ground line or below ground line where the
maximum moment occurs
Pole twist - Spiral rotation of a pole section relative to the pole end. It is caused by the
residual stress in the steel as received from the mill, the clamping force holding the tube
shells together and the heat applied during the seam welding process.
Raking - the practice of installing a straight pole out of plumb, or at an inclined angle
w/t - ratio of the width of the pole (flat-to-flat) to the plate thickness
Ultimate load - the maximum design load which includes the appropriate load factor
specified

UNC - Unified Coarse Threads
3. CODES AND STANDARDS
Codes, standards, or other documents referred to in this specification shall be considered
as part of this specification. The following codes and standards are referenced:
a. American Society of Civil Engineers (ASCE) Standard, Design of Steel Transmission
Pole Structures, Manual 72, latest edition.
b. American Society for Testing and Materials (ASTM), various standards, latest
revision.
c. American Concrete Institute (ACI), Building Code Requirements for Reinforced
Concrete, ACI 318, latest edition.
d. American Welding Society (AWS), Structural Welding Code, AWS D1.1,
latest edition.
e. American National Standards Institute (ANSI), National Electrical Safety Code,
ANSI C2, latest edition.
f. Society for Protective Coatings (SSPC, formerly Steel Structure Painting
Council)/ National Association of Corrosion Engineers (NACE) Surface
Preparations Specification, SSPC/NACE SP-6/NACE 3.
4. CONFLICT BETWEEN THIS SPECIFICATION, DRAWINGS, AND
REFERENCED DOCUMENTS
In the event of conflict between this specification and the above referenced documents,
the requirements of this specification shall take precedence. In the case of conflict
between several referenced documents, the more stringent requirement shall be followed.
If a conflict exits between this specification or the referenced documents and the attached
drawings, the attached drawings shall be followed. If clarification is necessary, contact
the owner or owner's representative.
5. GENERAL REQUIREMENTS
The design, fabrication, allowable stresses, processes, tolerances, and inspection shall
conform to the ASCE Standard, Design of Steel Transmission Pole Structures (Manual
72), latest edition, with the following additions and/or exceptions:
a. Design
(1) Pole designs shall be prepared from the attached Pole Replacement Schedule A
and configuration drawings (Attachment B of this Specification). Pole designs
shall be 12-sided galvanized steel. The H-frame structure cross arm shall be 8-
sided galvanized steel. The H-frame structure mounting strap shall be galvanized
steel.
(2) Wind pressures shown in the loading criteria shall be multiplied by the
appropriate shape factor applied to the poles. Pressures in psf shall be
computed as follows:

p = W x Cd
Where p = pressure on projected area of the pole normal to wind, W =
wind pressure, and Cd = shape (or drag) factor.
Shape factors for computing the wind on poles are:
(3) The maximum design unit stress shall be the minimum yield strength as
stated in applicable ASTM specifications for the particular application and
types of loads, including load factors.
(4) Poles shall be designed with a maximum of two joints. Field welding shall
not be allowed as part of the design of a new pole. The shaft joints to be
made in the field shall be slip joints or bolted flange joints. Slip joint length
shall be at least 1-1/2 times the largest inside diameter of the female section.
Bolted flange joints shall be used for medium angle and heavy angle guyed
structures and cross-braced H-Frames.
Manufacturer shall verify slip joint fit before shipment. Joints should not
interfere with joints, step nuts, ladder clips, or jacking nuts.
Sufficient jacking lugs and permanent orientation marks shall be provided at all
slip joints to ensure proper alignment and complete overlap of the joint.
(5) The ultimate load in guys shall not exceed 65 percent of the rated
breaking strength of the guy.
(6) Design of anchor bolts shall be in accordance with the ACI-318-1983
Edition, Building Code Requirements for Reinforced Concrete, assuming a
concrete strength as specified by the owner.
When anchor bolts are specified, they shall have the top 2 feet galvanized.
Anchor bolts shall be threaded at the top end a distance equal to the baseplate
thickness plus the thickness of two anchor bolt nuts plus 2-1/2". Each anchor
bolt shall include two heavy hex nuts.
Welding on anchor bolts will only be allowed in the bottom 12 inches. Only
one length of anchor bolt shall be used on each pole. Anchor bolts/clusters
shall be plainly marked to indicate the structure type, structure number,
orientation, and top of concrete. Anchor bolts shall be designed to be shipped
as a rigid cage with top and bottom plates holding the anchor bolts in place.
The anchor bolt thread shall be protected during shipping. The anchor bolts
shall be welded to the holding plate in the bottom of the cage. The top template
shall be designed to be removable and to support the assembled cage during
lifting and setting operations without detrimental deformations. Bolt clusters

shall be designed to be rigid enough to withstand the normal jolts of shipping,
handling and installation with no displacement of bolts from the proper
positions within the cluster.
The removable template at the top shall be marked to show the centerline for
tangent structures and the angle bisector for angle structures. Matching
marks are to be on the base plate of the structure so proper alignment can be
made.
(7) Minimum plate thickness for all pole components shall be 3/16 inch.
(8) Structures which are to be direct embedded shall have bearing plates and
ground sleeves. Bearing plates shall have a diameter not more than 2 inches
greater than the maximum pole diameter.
Galvanized poles shall have a drain hole at the bottom. The drain hole shall not
be more than 20% of the bottom plate surface area.
Direct embedded and vibratory caisson steel poles shall have ground sleeves.
Ground sleeves shall have a minimum length of 4 feet centered at ground line.
The ground sleeve shall have a minimum thickness of 3/16 inch and shall
be centered at the ground line. A seal weld shall be provided around the
ground sleeve. The ground sleeve shall not be considered in strength
calculations.
(9) Poles shall have nearly a uniform taper throughout their entire length.
The maximum difference in tapers between two pole sections measured
by the diameters shall be .20 inch/ft. for poles with variable taper.
(10) Poles with elliptical cross sections shall have a minor axis dimension equal to
at least 75 percent of the major axis dimension.
(11) All unguyed angle poles or unguyed tangent deadends shall be precambered to
remain plumb when the calculated deflection at the top of the pole exceeds 1.5
percent of the pole height under an initial conductor tension loading of 60 degreesF,
no wind, and no load factors. Pole height shall be the height of the pole from
the top of the baseplate, or designated ground line, to the top. Tangent poles
with unbalanced vertical loadings shall be precambered for the previously
stated conditions.
(12) Arms shall be designed so the end of the arm is at the specified height under
a loading of initial conductor tension, 60 degreesF, no wind, and no load factors.
Arms shall not deflect vertically more than 12 inches at the end of the arm
under heavy ice conditions (without any load factors applied).
Arms shall be upswept or straight, tapered, steel tubular members, of any cross-
sectional type, which meet the dimensions shown on the attached drawings.
Arm end plate connection details for hardware attachment shall be typical of
those shown on the attached drawings. The arms shall be hermetically sealed
when a painted finish is specified. Galvanized arms shall have drain holes
where appropriate.

(13) Lifting lugs are optional. The manufacturer shall supply all instructions for
handling and erection of poles and arms.
(14) In the design of connections for vangs, brackets, or stiffeners attached to the
pole shaft, care shall be taken to distribute the loads sufficiently to protect the
wall of the pole from local buckling.
(15) Thru-vang shall penetrate both sides of the pole with attachment holes on
both sides.
(16) Each pole shall be permanently marked on the pole shaft 60 inches above
ground line and on the bottom of baseplate or bearing plate with the
following identifying information: manufacturer's identification, structure
type, height, structure number, ultimate groundline moment, owner name, and
date manufactured. The method of identification shall be approved by the
owner.
(17) Each steel pole section shall be marked with a weld bead indicating the
location of that sections center of gravity and shall be marked with
identification information.
(18) Each separate part of steel pole structure shall be marked in accordance with
SUPPLIER'S drawings. Marking shall be made by addition of weld metal
and shall be clearly legible after finishing.
b. Materials
(1) All materials shall comply with the applicable requirements of ASTM
specifications. Any modifications to ASTM specifications must be approved
by the owner's representative prior to bidding.
(2) Poles, arms and conductor brackets shall conform to ASTM A36, ASTM
A572, ASTM 581, ASTM A588, ASTM A871 or ASTM A595.
(3) Base plate shall conform to ASTM A572, ASTM A588, ASTM A633, or
ASTM A595.
(4) Anchor bolts shall conform to ASTM A615, Grade 60 or 75.
(5) Other bolts and nuts shall conform, as applicable, to ASTM A307, ASTM
A325, ASTM A354, ASTM A394, or ASTM A687. Locknuts shall be
provided for each structure bolt, or American Nut Company (ANCO) type self-
locking nuts may be used. Locknuts shall be the galvanized MF type or ANCO
type.
(6) Anchor bolts, structural plate, and weld material, shall meet ASCE
requirements for Charpy tests.
(7) For galvanized structures, steel used for the pole shaft and arms shall have a
silicon content less than .06 percent.

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Bid Title: EAST WILLIAMS LOWER Substation Structural & Electric Materials Category: Utility Construction

Town of Apex

Bid Due: 8/21/2026

D6D1.SBE.008 SBE Light Duty Maintenance Crew - Various Routes - Robeson D6D1.SBE.008 -

Division of Highways

Bid Due: 8/05/2026

July 24, 2026 | Advertisements Advertisement for Bids - Avent Ferry Technology Center

North Carolina State University

Bid Due: 8/18/2026

Follow Appalachian Ranger District Office and Work Center Janitorial Services Active Contract Opportunity

AGRICULTURE, DEPARTMENT OF

Bid Due: 8/20/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.