| Location: | Alaska |
|---|---|
| Posted: | Jun 12, 2025 |
| Due: | Jun 18, 2025 |
| Agency: | ALASKA NATIVE TRIBAL HEALTH CONSORTIUM |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFQ 25-Q-16976 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Project includes the following Work:
Work of the Project includes providing water and sewer connection to a single residence in Hughes, AK. Sewer service will include an insulated residential lift station and an insulated connection to the low pressure sewer system. The water service will include an insulated 4” arctic pipe service line with 1” water circulating supply and return lines and water service line heat trace. The Contractor shall provide water circulation pump and heat trace switches in the home and all electrical upgrades to complete the water and sewer connection to the home. The Contractor shall furnish all labor, materials, equipment, tools, services, testing, and incidentals to complete all Work required by these Specifications and as shown on the Drawings and shall have experience with residential water and sewer connections.
Estimated Cost Range:
Owner anticipates that the Work’s total bid price will be approximately $110,000 – $124,000.
Anticipated Schedule:
The Project has an expected substantial completion date of 1 September 2025 and final completion date of 1 December 2025.
Award Statement:
Award will be based on the total of all items listed on the Bid Form.

With GovernmentContracts, you can:
...switchboards, and automatic transfer switches in the Atwood Building in Anchorage, Alaska. The ...
State Government of Alaska
Bid Due: 6/10/2026
...electrical services, their respective main distribution switchboards, and automatic transfer switches...
State Government of Alaska
Bid Due: 6/10/2026
.../7 emergency call-out for generators, transfer switches and all associated components...
ALASKA NATIVE TRIBAL HEALTH CONSORTIUM
Bid Due: 6/23/2026