DEMOLITION OF 1110 WEST SOUTH BOULEVARD

Location: Alabama
Posted: Jan 18, 2026
Due: Feb 19, 2026
Agency: City of Montgomery
Type of Government: State & Local
Category:
  • P - Salvage Services
Publication URL: To access bid details, please log in.


Project ID:

Title: DEMOLITION OF 1110 WEST SOUTH BOULEVARD

Addenda: 0

Release Date: 1/16/2026

Due Date: 2/19/2026

Follow
DEMOLITION OF 1110 WEST SOUTH BOULEVARD
Procurement
Project ID: RAA PROJECT #25-009
Release Date: Friday, January 16, 2026
ยท Due Date: Thursday, February 19, 2026 10:00am
Posted Friday, January 16, 2026 2:55pm
All dates & times in Central Time
Draft Response Events RSVP No Bid31 days, 14 hours, 32 minutes


Post Information

Posted At:Fri, Jan 16, 2026 2:55 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

The work consists of the complete demolition and removal of the existing building and all associated site improvements at 1110 West South Boulevard down to the building pad, including but not limited to roofs, canopies, walls, windows, doors, floors, and foundations. All interior components such as ceilings, baseboards, flooring, doors, frames, hardware, and windows shall be removed, along with all plumbing, mechanical, HVAC, sprinkler, and electrical systems, including piping, ductwork, controls, and associated equipment. Utility lines for water, sewer, gas, and fire protection shall be properly disconnected and capped beyond the building pad as indicated in the contract documents. The existing pool shall be filled, compacted to 98% density, and graded to match surrounding terrain for mowing. Remaining site elements designated to stay, including existing fencing, curbs, sidewalks, and drives, shall be protected throughout construction. Temporary erosion and sediment control measures shall be installed and maintained in accordance with Alabama Department of Transportation Standard Specifications Section 665. All work must comply with applicable federal, state, and local codes, and the contractor shall obtain required permits, coordinate with utility companies for service disconnections, and legally dispose of all demolition debris off-site at an approved facility. Hazardous materials, if present, shall be handled per regulatory requirements, including EPA Section 608 refrigerant recovery, and asbestos or lead-containing materials must be removed and disposed of in accordance with environmental regulations.



Timeline

Release Project Date:
January 16, 2026
Pre-Proposal Meeting (Mandatory):
February 12, 2026, 10:00am
1110 West South Boulevard, Montgomery, AL 36105
Question Submission Deadline:
February 13, 2026, 10:00am
Question Response Deadline:
February 16, 2026, 10:00am
Response Submission Deadline:
February 19, 2026, 10:00am
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.