| Location: | Connecticut |
|---|---|
| Posted: | Jul 25, 2025 |
| Due: | Aug 20, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 31472 |
| Publication URL: | To access bid details, please log in. |
Roadway construction and traffic signal installation along Whitney Avenue from Canner Street to Cliff Street. The project will install a new asphalt bike path along the east side of the road and revise traffic patterns and intersection designs to increase safety for all roadway users. Typical work includes demolition, curb installation, concrete sidewalk, concrete sidewalk ramps and driveways, raised asphalt crosswalks and intersections, storm drainage, milling and paving, pavement markings, traffic signs, and traffic signal equipment. One traffic signal is proposed to be fully removed and replaced and one will be modified and upgraded.
Shawn Garris 200 Orange Street New Haven CT, 06510 United States Tel: 203-946-8202 Fax: sgarris@newhavenct.gov

With GovernmentContracts, you can:
...Rental of Services and Equipment for Roadway Construction This Contract is for the ...
State Government of Connecticut
Bid Due: 8/18/2026
...Invitation to Bid for Construction Services 450 Columbus Blvd. Building/Agency Space Consolidation... Information ...
State Government of Connecticut
Bid Due: 9/02/2026
...Invitation to Bid for Construction Services DESPP Fleet Roof Replacement 47 Mill Hill ...
State Government of Connecticut
Bid Due: 8/24/2026
...Location 207536 caeab9a1-c1a3-4f22-8516-d54e4115374a 2027.0032 City Bid - Construction of Food..., Construction Manager, (203)-977-4179 ...
City of Stamford
Bid Due: 8/20/2026