| Location: | Connecticut |
|---|---|
| Posted: | Jul 25, 2025 |
| Due: | Aug 20, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 31472 |
| Publication URL: | To access bid details, please log in. |
Roadway construction and traffic signal installation along Whitney Avenue from Canner Street to Cliff Street. The project will install a new asphalt bike path along the east side of the road and revise traffic patterns and intersection designs to increase safety for all roadway users. Typical work includes demolition, curb installation, concrete sidewalk, concrete sidewalk ramps and driveways, raised asphalt crosswalks and intersections, storm drainage, milling and paving, pavement markings, traffic signs, and traffic signal equipment. One traffic signal is proposed to be fully removed and replaced and one will be modified and upgraded.
Shawn Garris 200 Orange Street New Haven CT, 06510 United States Tel: 203-946-8202 Fax: sgarris@newhavenct.gov

With GovernmentContracts, you can:
...Green Road Drainage The project will consist of replacing the existing 36" storm ...
State Government of Connecticut
Bid Due: 6/17/2026
...Project ID: Title: B026-62 Green Road Drainage Addenda: 0 Release Date: 5/15/2026 Due ...
City of Meriden
Bid Due: 6/17/2026
...irrigation system, placement of topsoil and sod, paved parking lot, storm drainage, landscaping, ...
State Government of Connecticut
Bid Due: 6/30/2026
...with concrete curbing, concrete sidewalk ramps, storm drainage modifications, sanitary sewer...
Town of Beacon Falls
Bid Due: 7/02/2026