Project Description: The Contractor shall furnish and install approximately 3763 lineal feet of 27-inch and 1980 lineal feet of 30-inch Cured-In- Place Pipe (CIPP) to rehabilitate existing sanitary sewer mains.
The CIPP is to be designed for fully deteriorated gravity flow conditions. The work consists of furnishing all labor, equipment, materials, and incidentals required to rehabilitate the existing sewer mains with either steam cured or ultra violet (UV) cured CIPP. This work will also include customer notification, bypass pumping, cleaning, root and sediment removal,
initial Closed Circuit Television (CCTV) inspection and assessment, CIPP installation and testing, reinstatement of all laterals, testing, and final CCTV inspection and other work, all in
accordance with the attached Plan Set, these Contract Provisions, and the Standard Specifications, hereinafter referred to as “Work.”
Work will also consist of epoxy or polyurethane lining of 18 manholes of various depths for corrosion prevention in conjunction with the proposed CIPP lining.
The Contract Work shall be Physically Complete within 40 Working Days from the Notice to Proceed.
Engineer's Estimate - $ 3,350,000