Mississippi State University
Request for Proposals (RFP) MSU2026096
Construction Management Adviser Services
#205-361 Davis Wade Stadium East Suite Improvements and 305-
684 # Davis Wade Stadium – North Suite Improvements
ISSUE DATE: August 4, 2026
ISSUING AGENCY: Office of Procurement and Contracts
Mississippi State University
405 Garrard Road E
Starkville, MS 39759
Sealed Proposals, subject to the conditions made a part hereof, will be received September 1,
2026 at 2:00 PM in the MSU Office of Procurement and Contracts, same address above, for
furnishing services and potentially, optional services as described herein.
IMPORTANT NOTE: Indicate firm name, and RFP number on the front of each sealed
proposal envelope or package.
All inquiries concerning this RFP should be directed to:
Jay Rester
Office of Procurement and Contracts, (Same address above)
jrester@procurement.msstate.edu
662-325-2550
Any addendum associated with this RFP will be posted at
http://www.procurement.msstate.edu/procurement/bids/index.php located under MSU2026096.
It is the respondent’s responsibility to assure that all addenda have been reviewed and if
applicable, signed and returned.
1
1. PURPOSE
Mississippi State University (MSU) desires to contract with a reputable and responsible
Construction Management firm, licensed in the State of Mississippi, capable of providing
Construction Management Adviser (CMa) services, on a full-time basis, for two projects, #205-
361 Davis Wade Stadium East Suite Improvements and #305-684 Davis Wade Stadium – North
Suites Improvements. The selected Construction Management Adviser (CMa) will provide
procurement, construction administration, coordination, scheduling, cost control, and closeout
services for the Projects. The selected CMa shall enhance the project team and assist the design
professional in structuring the bidding process. The CMa shall provide limited pre-construction
services during construction documents preparation and the bidding process and then complete
construction services during the construction phase. During the construction phase the CMa
shall coordinate and manage multiple prime contractors performing the Work at the same time.
2. PROJECT DESCRIPTION
The Davis Wade Stadiu East Suite Improvements and North Suite Improvement project consists
of interior refreshing of the existing Suites associated premium hospitality spaces within Davis
Wade Stadium at Mississippi State University. The work will include selective demolition,
architectural improvements, , premium hospitality area improvements, minor technology and AV
upgrades, minor MEP modifications, minor fire protection modifications, accessibility
improvements, and FF&E coordination.
MSU may elect to procure long lead time equipment (transformers, electrical switchgear,
chillers, etc.) directly from manufacturers. If the Owner elects to procure equipment direct from
manufacturers, then the CMa shall assist and coordinate these efforts on behalf of MSU.
Anticipated Project Schedule:
• Design and Pre-Construction Phase:
• Bidding and Procurement Phase:
• Construction Phase:
Ongoing thru October 2026
October 2026 – November 2026
January 2027 – August 2027
MP Design Group is the Design Professional for this East Suites Project which has a total project
budget of $4,500,000.
MSU’s Office of Planning, Design & Construction Administration is the Design Professional for
the North Suites Project which has a total project budget of $1,500,000.
MSU intends to award the CMa contract to a single CMa firm, but each project’s accounting and
tracking of costs must be treated separately.
2
3. GENERAL OVERVIEW OF REQUIRED SERVICES
The selected firm’s Basic Services will generally consist of those described in Sections 3.2
and 3.3 of AIA C132-2019 and include usual and customary construction program
evaluation, budget development, constructability review, project phasing, coordination and
scheduling, cost estimating, and allocation of construction activities among the multiple
prime contractors.
The resulting contract(s) for the selected firm’s services shall consist of two (2) phases
as generally outlined in the Standard AIA C132-2019:
Phase 1 – Preconstruction Phase
Phase 2 – Construction Phase Administration of the Construction Contract
MSU intends to utilize the Standard AIA C132-2019, with supplemental and additional
terms and conditions.
4. GENERAL INFORMATION AND REQUIREMENTS
MSU’s Reservation of Rights – MSU reserves the right to divide the project into multiple parts.
Additionally, MSU reserves the right to reject any and all proposals received. MSU makes no
representations, written or oral, that it will enter into any form of agreement with any respondent
to the RFP for any project and no such representation is intended to be construed by the issuance
of this RFP.
No Reimbursement for Costs – The respondent acknowledges and accepts that any costs
incurred from the respondent’s participation in the RFP shall be at the sole risk and responsibility
of the respondent.
CMa Limitations – This invitation is limited to firms licensed to do business within the State of
Mississippi. Aside from, and in addition to, any other limitations, the selected CMa will be
limited to providing services to the Owner. The CMa, or any companies affiliated with the CMa,
may not perform any of the Work in the construction process on this project.
5. INFORMATIONAL MEETING
An informational meeting will be held on August 12, 2026 CST at the Gast Building, 130
Twelve Lane, Mississippi State, MS 39762.
6. INQUIRIES ABOUT RFP
Prospective respondents may make written inquiries concerning this request for proposal to
obtain clarification of requirements. Questions should be submitted either via a Word
3
document or plainly typed in the email itself. Responses to these inquiries may be made by
addendum to the Request for Proposal (RFP). Please send your inquiries to Jay Rester via
electronic mail at jrester@procurement.msstate.edu.
All inquiries should be marked “URGENT INQUIRY. MSU RFP MSU2026096 ”
7. ADMINISTRATIVE INFORMATION
a) Issuing Office
This RFP is issued by the following office:
Office of Procurement and Contracts
Mississippi State University
405 Garrard Road E
Starkville, MS 39759
b) Schedule of Critical Dates
The following dates are for planning purposes only unless otherwise stated in this RFP
progress towards their completion is at the sole discretion of the university.
RFP Posted
August 4, 2026
Questions from Vendors Due
August 12, 2026
Informational Meeting
August 12, 2026
MSU Q&A Response Due
August 18, 2026
Proposal Submission Deadline – 2:00 p.m. September 1, 2026
Shortlist (Estimated)
September 2, 2026
Interviews (Estimated)
September 16, 2026
Notice of Award (Estimated)
September 23, 2026
Contract Effective Date (Estimated)
October 1, 2026
8. PROPOSAL CONTENTS
Qualification Proposal
At a minimum, the following items should be included in the contents of the Qualifications
Proposal:
4
A. Letter of Interest. This letter should include an overview of the services being offered.
The letter should also include a statement of exception to any of the terms and conditions
outlined in this RFP.
B. Corporate Structure, History, and Key Personnel
1) Corporate structure
2) Provide a brief history of the respondent in narrative form.
3) Provide an organizational chart of the respondent.
4) Provide sample insurance certificates.
5) List key personnel proposed for this project and provide resumes for each including:
• Project executive to be in charge
• Project manager(s)- preconstruction services
• Project manager(s)- construction services
• Lead Superintendent
• Key Personnel
• Consultants
6) Provide a brief management plan in narrative form for this Project. Include an
organizational chart that illustrates the staffing plan along with proposed breakdown
of prime contract trade packages.
7) Has the respondent ever failed to complete or been terminated on a contract? If so,
provide details and circumstances.
8) Provide a summary that describes current or pending lawsuits against the respondent
or its parent company.
C. A description of procedures used to assure a successful owner-architect-construction
manager relationship. This should include pre-construction services, design-assist and
through completion of construction services.
D. Documentation of the respondent’s record of similar projects. Photographs and other
evidence may be included as supporting material. For each project provide the following:
i) Name and location of project
ii) End user point of contact and phone number
iii) Budgeted and actual project dollar amounts (submit explanation if amounts differ)
iv) Planned and actual start and completion dates (submit explanation if dates differ).
v) Project delivery method along with the number of prime contractor trade packages
E. Describe your project estimating system for developing the estimated cost and how you
will monitor and track these costs during the Project along with an explanation of your
cost control procedures that will be applied to this project.
F. Describe your method for developing thorough prime contractor trade packages.
G. Describe how you will develop, maintain and update the schedule during design and
5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.