| Location: | New Jersey |
|---|---|
| Posted: | Jul 23, 2026 |
| Due: | Aug 20, 2026 |
| Agency: | Middlesex County College |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 27-1 |
| Publication URL: | To access bid details, please log in. |
Project Description: Replace approximately 225 feet of existing 12-inch stormwater pipe between two manholes, including excavation, installation of new corrugated and concrete piping, backfill, compaction, and restoration of affected asphalt, concrete, and lawn areas. The contractor shall provide temporary construction fencing and dispose of all removed piping, debris, and excess fill. Alternate No. 1 includes removing and stump-grinding up to five trees, as needed, plus removing one additional stump.

With GovernmentContracts, you can:
...time due to an emergency, such as a snow storm, the bid will ...
Ramapo College
Bid Due: 11/05/2026
...and reconstruction of approximately 25 +/- existing storm sewer inlet structures of various ...
Sayreville borough
Bid Due: 12/01/2026
..., and flashing. Portions of existing metal coping have pulled away during storm ...
ENERGY, DEPARTMENT OF
Bid Due: 12/10/2026
.... Portions of existing metal coping have pulled away during storm events causing ...
ENERGY, DEPARTMENT OF
Bid Due: 12/10/2026