Terminal Mitigation of Water Intrusion-PIE-ARPA

Location: Florida
Posted: Jan 17, 2025
Due: Feb 11, 2025
Agency: Pinellas County
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: 25-0298-ITB-C
Publication URL: To access bid details, please log in.


Project ID: 25-0298-ITB-C

Title: Terminal Mitigation of Water Intrusion-PIE-ARPA

Addenda: 0

Release Date: 1/17/2025

Due Date: 2/11/2025

Post Information
Posted At:Fri, Jan 17, 2025 10:36 AMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:No
Overview
Summary

The St. Pete-Clearwater International Airport terminal building has several issues with moisture and water intrusion at the main entry, roof parapets, entry doors as well as a deteriorating soffit in the back of the terminal. Work includes but is not limited to the following:

Terminal Lobby: Replacement of the main lobby skylight and windows, full weatherproofing of these window systems and related roof waterproofing; replacement and upgrade of the lobby interior and exterior lighting; demolition and new installation of the lobby interior finishes; Roof Parapets: Refurbishment of the stucco parapet wall, sealing cracks and re-painting this wall with a breathable weather-proofing paints system; Automatic Entry Doors: Replacement of the automatic door seals and weatherstripping, especially at the door sill; Soffit: Soffit replacement at the FIS exterior walkway.

Background

The St. Pete-Clearwater International Airport terminal building has several issues with moisture and water intrusion at the main entry, roof parapets, entry doors as well soffits in the back of the terminal. At the main entry there are roof leaks, skylight and window leaks as well as damage and deterioration to the entry walls and finishes, all requiring replacement. Along the parapet of the terminal building, there are minor cracks requiring repair and sealing. At the automatic entry doors along the terminal building there leaks due to wind driven rain requiring weatherproofing. And a deteriorating exterior soffit requiring full replacement.

Timeline
Issue Date:
January 17, 2025
Site Visit & Pre-Conference Information (Non-Mandatory):
January 28, 2025, 1:00pm
14700 Terminal Blvd., 2nd Floor Conference Room, Clearwater, FL 33762
Question Submission Deadline:
February 4, 2025, 3:00pm
Step 1 Bid Submission Deadline:
February 11, 2025, 3:00pm
Step 2 Bid Submission Deadline:
March 6, 2025, 3:00pm
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...and exterior lighting as necessary. * Repair/replace Anti-Terrorism-Force Protection (ATFP) measures..., and lifecycle ...

State Government of Florida

Bid Due: 6/11/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.