ITB No. 27-007 On-Call Boring Services 2027 for BGJWSC Addendum 3

Location: Georgia
Posted: Oct 29, 2026
Due: Nov 10, 2026
Agency: Brunswick-Glynn County Joint Water & Sewer
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • F - Natural Resources and Conservation Services
  • V - Transportation, Travel and Relocation Services
Publication URL: To access bid details, please log in.

ITB No. 27-007 On-Call Boring Services 2027 for BGJWSC

Written by Christa Free on October 9, 2026. Posted in Bid Opportunities Open .

IFB-27-007-2027-ON-CALL-BORING-SERVICES

IFB-27-007-2027-On-Call-Boring-Services-Exhibit-A

IFB-No.-27-007-On-Call-Boring-Services-2027-Addendum-1

IFB-No.-27-007-On-Call-Boring-Services-2027-Addendum-2

IFB-No.-27-007-On-Call-Boring-Services-2027-Addendum-3

IFB-27-007-2027-ON-CALL-BORING-SERVICES-BID-FORM-UPDATED-10-29-26

Attachment Preview

BRUNSWICK-GLYNN COUNTY
JOINT WATER AND SEWER
COMMISSION
2027 On-Call Boring Services
Technical Specificaons for Pressure
Testing
October 2026

BRUNSWICK - GLYNN COUNTY JOINT WATER & SEWER
COMMISSION
ON-CALL BORING SERVICES
TECHNICAL SPECIFICATIONS
DIVISION 15 - MECHANICAL
15044 - Pressure Testing of Piping
15075 - Horizontal Directional Drilling (HDD)

INDEX TO
SECTION 15044 - PRESSURE TESTING OF PIPING
Paragraph Page
PART 1 - GENERAL
1.01 Description 15044-1
1.02 Measurement and Payment 15044-1
PART 2 - PRODUCTS
2.01 General 15044-1
2.02 Materials and Equipment 15044-1
PART 3 - EXECUTION
3.01 Testing 15044-1

15044-1
SECTION 15044
PRESSURE TESTING OF PIPING
PART 1 - GENERAL
1.01 DESCRIPTION
A. Scope of Work:
Hydrostatic testing shall be conducted for all pressurized piping systems. Pressure and
leakage testing shall be performed in accordance with the JWSC Standards for Water
and Sewer Design and Construction and the relevant sections of the technical
specifications.
1.02 MEASUREMENT AND PAYMENT
A. Payment for Pressure Testing of Piping shall not be made separately. The cost
thereof is included in the unit or lump sum price set forth for the items to which the
pressure testing of piping is necessary. Reference Section 01025 Measurement
and Payment for additional information.
PART 2 - PRODUCTS
2.01 GENERAL:
A. Testing fluid shall be potable water.
2.02 MATERIALS AND EQUIPMENT
A. Unless otherwise indicated, Contractor shall provide pressure gauges, pipes, bulkheads,
pumps, and meters to perform the hydrostatic testing.
PART 3 - EXECUTION
3.01 TESTING
A. All work shall conform to the requirements of the JWSC Standards for Water and Sewer
Design and Construction and the relevant sections of the technical specifications as
noted below.
1. Reference Section 2.5.3.8 of the JWSC Standards for hydrostatic testing of water
mains.
2. Reference Section 4.7.7 of the JWSC Standards for hydrostatic testing of force
mains.

15044-2
3. For hydrostatic testing of HDPE piping reference Section 15075. HDPE piping shall
be tested separately from PVC
4. and DIP piping.
END OF SECTION

INDEX TO
SECTION 15075 - HORIZONTAL DIRECTIONAL DRILLING
Paragraph Title Page
PART 1 - GENERAL
1.01 Scope of Work 15075-1
1.02 Quality Assurance 15075-1
1.03 Qualifications 15075-1
1.04 Project Schedule and Cooperation 15075-1
1.05 Warranty 15075-2
1.06 Reference Standards 15075-2
1.07 Permits 15075-3
1.08 Shop Drawing and Submittals 15075-3
1.09 Notification 15075-7
1.10 Measurement and Payment 15075-7
1.11 Site Preparation 15075-7
1.12 Environmental Protection 15075-8
1.13 Safety 15075-8
1.14 Domestic Water 15075-8
PART 2 - PRODUCTS
2.01 High Density Polyethylene (HDPE, PE) Pipe and Fittings 15075-8
2.02 Fusible Polyvinyl Chloride (PVC) Pipe 15075-10
2.03 Drilling Fluids Shall be a Bentonite Slurry 15075-10
2.04 Delivery, Storage and Handling of Materials 15075-10
2.05 Equipment Requirements 15075-11
PART 3 - EXECUTION
3.01 Drilling Procedures 15075-15
3.02 Pipe Assembly 15075-17
3.03 Swabbing 15075-18
3.04 Testing 15075-19

15075-1
SECTION 15075
HORIZONTAL DIRECTIONAL DRILLING
PART 1. GENERAL
1.01 SCOPE OF WORK:
The work specified in this section consists of furnishing and installing underground utilities using
the horizontal directional drilling (HDD) method of installation for pipe 10 inches and larger
outside diameter (OD), also commonly referred to as directional boring or guided horizontal
boring. This work shall include all services, equipment, materials, and labor for the complete
and proper installation, testing, restoration of underground utilities and environmental
protection and restoration.
1.02 QUALITY ASSURANCE:
The requirements set forth in this document specify a wide range of procedural precautions
necessary to ensure that the very basic, essential aspects of a proper directional bore
installation are adequately controlled. Strict adherence shall be required under specifically
covered conditions outlined in this specification or within any associated permit (i.e.:
railroad, US ACOE, EPD, DOT, Etc.). Adherence to the specifications contained herein, or
the BGJWSC Representative's approval on any aspect of any directional bore operation
covered by this specification, shall in no way relieve the Contractor of their ultimate
responsibility for the satisfactory completion of the work authorized under the Contract. The
HDD contractor shall be responsible for the repair of all damage to private and/or public
property (at no expense to BGJWSC). Repair work shall meet all local and state rules and
requirements.
1.03 QUALIFICATIONS:
The work specified in this Section requires significant previous experience and expertise in
similar work to avoid negative impacts to public safety and the environment. Therefore, the
Contractor performing the work shall be qualified, in BGJWSC's judgment, to complete the
horizontal directional drilling work specified herein. The Contractor shall submit
substantiating evidence of qualifications, in accordance with the provisions of this Section
and the Instructions to Bidders. Failure to submit the required documentation may cause
the Contractor to be declared unqualified to perform the scope of work for the project.
Contractor or subcontractor responsible for horizontal directional drilling operations shall
perform all horizontal directional drilling operations including pipe joining/fusing. In order
to qualify to perform work specified in this Section the Contractor must provide evidence
satisfactory to the Engineer of Record and Owner, as noted in the Instructions to Bidders with
bid response.
1.04 PROJECT SCHEDULE AND COOPERATION:
The project schedule shall be established on the basis of working a normal work schedule as
defined in the Special Conditions, or otherwise indicated in the Construction Drawings.
Unless approved or requested otherwise by the Engineer of Record or Owner, normal or

15075-2
general items of work, such as bacteriological testing, leakage and pressure testing, locate
wire testing, density testing and final inspections, shall be scheduled during the normal work
schedule. Due to operational and manpower limitations on the BGJWSC systems, BGJWSC
may require the contractor to perform work outside of the normal work schedule. These
operational and manpower limitations may include line filling and flushing operation, tie-in
work, (cut-in work or other work) and other phases of the work which may impact the
continued (non-interruptible) service to existing BGJWSC customers. The contractor shall
plan and anticipate the cost impact of these systems limitations and provide such work or
services at no additional cost to BGJWSC.
1.05 WARRANTY:
The Contractor shall supply to BGJWSC a one (1) year unconditional warranty. The
warranty shall include materials and installation and shall constitute complete replacement
and delivery to the site of materials and installation of same to replace defective materials
or defective workmanship with new materials/workmanship conforming to the
specifications.
The pipe manufacturer shall provide a warranty to the Contractor that the pipe conforms to
these specifications and that the pipe shall be free from defects in materials and
workmanship for a period of one (1) year from the date of final completion of the installation.
The manufacturer's warranty shall be in a form acceptable to and for the benefit of BGJWSC
and shall be submitted by the contractor as a condition of final payment. The
manufacturer's warranty to the contractor shall in no way relieve the contractor from its
unconditional warranty to BGJWSC.
The contractor shall warrant to BGJWSC that the methods used on the contract, where
covered by patents or license agreements, are furnished in accordance with such
agreements and that the prices included herein cover all applicable royalties and fees in
accordance with such license agreements. The contractor shall defend, indemnify, and
hold BGJWSC harmless from and against any and all costs, loss, damage or expense arising
out of, or in any way connected with, any claim of infringement of patent, trademark, or
violation of license agreement.
1.06 REFERENCED STANDARDS:
A. The work shall conform to applicable provisions of the BGJWSC Standards for Water
and Sewer Design and Construction, and the following standards, latest editions,
except as modified herein.
B. American Water Works Association (AWWA) Standards:
AWWA C900 Polyvinyl Chloride Pressure Pipe and Fabricated Fittings, 4 inch
through 60 inch.
AWWA C906 Polyethylene (PE) Pressure Pipe and Fittings, 4 inch through 63 inch,
for Water Distribution American Society for Testing and Materials (ASTM)
Standards.
ASTM D638 Standard Test Method for Tensile Properties of Plastics.
ASTM D2122 Standard Method of Determining Dimensions of Thermoplastics Pipe
and Fittings.

15075-3
ASTM D2683 Standard Specification for Socket-Type Polyethylene Fittings for
Outside Diameter-Controlled Polyethylene Pipe and Tubing.
ASTM D2837 Standard Test Method for Obtaining Hydrostatic Design Basis for
Thermoplastic Pipe Materials.
ASTM D3035 Standard Specification for Polyethylene (PE) Plastic Pipe (SDR-PR)
Based on Controlled Outside Diameter.
ASTM E3261 Standard Specification for Butt Heat Fusion Polyethylene Plastic
Fittings for Polyethylene (PE) Plastic Pipe and Tubing.
ASTM D3350 Standard Specification for Polyethylene Plastic Pipe and Fittings
Materials.
ASTM F412 Standard Terminology Relating to Plastic Piping Systems.
ASTM F714 Standard Specification for Polyethylene (PE) Plastic Pipe (SDR-PR)
Based on Outside Diameter.
ASTM F2620 Standard Practice for Heat Fusion Joining of Polyethylene Pipe and
Fittings.
1.07 PERMITS:
The Contractor shall verify the existence of all necessary permits before commencing any
work on the project.
1.08 SHOP DRAWING AND SUBMITTALS
A. Work Plan: Prior to beginning work, the Contractor must submit to the BGJWSC
Representative a work plan detailing the procedure and schedule to be used to
execute the project. Horizontal directional drilling shall not commence until the
contractor has received written approval of all work plan submittals from BGJWSC.
1. Methods: The Contractor shall provide complete descriptions of proposed
plans, procedures, and personnel, as well as supporting calculations, for the
following:
a. Drilling operations, addressing: Procedures for pilot hole drilling and
reaming. Procedures for tracking and controlling the drilling head
location. Procedures for preparing as-builts.
b. Drilling fluid management plan.
c. Spoils handling and disposal plan.
d. Pipe storage and handling, addressing: Means and methods for
protecting pipe and ensuring temperature control in accordance
with the Contractor's installation calculations.
e. Pipeline assembly and installation, addressing: Procedures for pipe
joining, pipeline pullback, and pullback monitoring.
f. Prevention of inadvertent fluid losses and spills, and contingencies
for rapid containment and cleanup, addressing: Measures to
mitigate risk of inadvertent fluid returns to surface. Procedures for
monitoring and controlling drilling fluid flows and pressures.
Equipment, resources, and procedures for identifying, containing,
and cleaning up fluid losses and spills.

15075-4
g. Quality control and testing procedures.
h. Safety plan.
2. Schedule: The Contractor shall provide a schedule for all horizontal
directional drilling activities commencing with the site preparation and
terminating on completion of testing and final acceptance of the installed
pipe. The schedule shall address anticipated subsurface conditions and
overall project requirements.
3. Equipment
a. The contractor shall provide the make, model, and technical
specifications for each of the following:
1. Horizontal directional drill rig.
2. Drilling system components.
3. Downhole drilling assembly and reaming equipment.
4. Downhole pressure sub.
5 Guidance and control system.
6. Pulling head.
7. Swivel.
8. Rollers.
9. Solids separation and drill fluid recirculation systems.
10. Pipe fusion equipment.
11. Pipe fusion data logger.
12. Pipe handling equipment.
13. Pigs and pigging equipment.
b. The Contractor shall provide the following specific equipment
information:
1. Calibration certification for the pilot bore guidance and
control system.
2. Calibration certification for the heat fusion datalogger.
4. Supplemental Work Plan Requirements: The Contractor shall provide the
following additional work plan submittals. The submission requirements for
additional work plan submittals including number of copies and delivery of
submittals shall follow the requirements outlined in the Submittals Section of
the Special Conditions. Horizontal directional drilling shall not commence
until the Contractor has received written approval of all supplemental work
plan submittals.
a. The Contractor shall submit acknowledgement of use of the
Maintenance of Traffic plans in the Construction Drawings or shall
submit alternate detailed Maintenance of Traffic plans for entry and
exit pit sites and all areas of construction which will impact typical
roadway or pathway use. Approval of Glynn County will be required
for ALL Maintenance of Traffic plans with the ROW Permit.

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Repair/Overhaul of Flat Panel Up Front Controller (FPUFC) Active Contract Opportunity Notice

DEPT OF DEFENSE

Bid Due: 11/25/2026

Project Project No. Advertise Date Bid Date Chattahoochee River Trail, Phase II GDOT

Cobb County Transportation

Bid Due: 1/15/2027

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-33658-NONST-2027-000000005

State Government of Georgia

Bid Due: 11/23/2026

BL152-26 NOT Beaver Ruin Diversion Pump Station Grinders Replacements Project Buyer Contact :

Gwinnett County

Bid Due: 11/20/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.