MT FLAP BOR 2980(1), Sun River Bridge Replacement

Location: Montana
Posted: Nov 4, 2024
Due: Nov 13, 2024
Agency: TRANSPORTATION, DEPARTMENT OF
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: 69056724B000016
Publication URL: To access bid details, please log in.
Follow
MT FLAP BOR 2980(1), Sun River Bridge Replacement
Active
Contract Opportunity
Notice ID
69056724B000016
Related Notice
69056724B000016
Department/Ind. Agency
TRANSPORTATION, DEPARTMENT OF
Sub-tier
FEDERAL HIGHWAY ADMINISTRATION
Office
690567 WESTERN FEDERAL LANDS DIV
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • Updated Published Date: Nov 04, 2024 03:45 pm PST
  • Original Published Date: Oct 15, 2024 04:38 pm PDT
  • Updated Date Offers Due: Nov 13, 2024 03:00 pm PST
  • Original Date Offers Due: Nov 13, 2024 02:00 pm PST
  • Inactive Policy: Manual
  • Updated Inactive Date: Jun 30, 2025
  • Original Inactive Date: Jun 30, 2025
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
    Augusta , MT 59410
    USA
Description

Update 10/18/2024: QA_10-18-2024.pdf posted to attachments.



Update 10/18/2024: Due to technical error, some physical data files did not upload when the solicitation was initially posted. The remaining physical data files are available under Physical Data_2.zip.



PROJECT: MT FLAP BOR 2980(1), Sun River Bridge Replacement



LOCATION: 50 miles NW of Augusta, MT



WORK: The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge.



The project includes construction of a 3 span, 462-foot long precast-post-tensioned girder bridge with a precast concrete deck. Abutments are founded on both spread footing and piles within an MSE wall fill. Piers are supported on 10 foot diameter drilled shafts. The work may include as an Option demolition of the existing steel truss bridge upon completion of the new structure.



LENGTH: 0.36 miles



TENTATIVE COMPLETION DATE: Fall 2026



CONTRACT TYPE: Sealed Bid, Firm-Fixed-Price



ESTIMATED PRICE RANGE: Between $10 million to $20 million



INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, call the Federal Service Desk at 866-606-8220.



THIS SOLICITATION IS OFFERED FOR FULL AND OPEN COMPETITION ON AN UNRESTRICTED BASIS


Attachments/Links
Contact Information
Contracting Office Address
  • DOT FEDERAL HIGHWAY ADMIN 610 E FIFTH STREET
  • VANCOUVER , WA 98661
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

Oct 15, 2024[Solicitation (Original)] MT FLAP BOR 2980(1), Sun River Bridge Replacement
Oct 16, 2024[Solicitation (Updated)] MT FLAP BOR 2980(1), Sun River Bridge Replacement
Oct 18, 2024[Solicitation (Updated)] MT FLAP BOR 2980(1), Sun River Bridge Replacement
Oct 21, 2024[Solicitation (Updated)] MT FLAP BOR 2980(1), Sun River Bridge Replacement
Oct 23, 2024[Solicitation (Updated)] MT FLAP BOR 2980(1), Sun River Bridge Replacement
Oct 24, 2024[Solicitation (Updated)] MT FLAP BOR 2980(1), Sun River Bridge Replacement
Oct 31, 2024[Solicitation (Updated)] MT FLAP BOR 2980(1), Sun River Bridge Replacement
Nov 5, 2024[Solicitation (Updated)] MT FLAP BOR 2980(1), Sun River Bridge Replacement
Nov 6, 2024[Solicitation (Updated)] MT FLAP BOR 2980(1), Sun River Bridge Replacement
Nov 7, 2024[Solicitation (Updated)] MT FLAP BOR 2980(1), Sun River Bridge Replacement
Nov 11, 2024[Solicitation (Updated)] MT FLAP BOR 2980(1), Sun River Bridge Replacement
Nov 12, 2024[Solicitation (Updated)] MT FLAP BOR 2980(1), Sun River Bridge Replacement
Nov 13, 2024[Solicitation (Updated)] MT FLAP BOR 2980(1), Sun River Bridge Replacement
Nov 21, 2024[Solicitation (Updated)] MT FLAP BOR 2980(1), Sun River Bridge Replacement
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow The State of Montana JOC Ordering Agreement Solicitation Active Contract Opportunity Notice

POSTAL SERVICE

Bid Due: 7/02/2026

Follow CUSTER GALLATIN NATIONAL FOREST - Sweet Trunk Trail #274 Active Contract Opportunity

AGRICULTURE, DEPARTMENT OF

Bid Due: 7/01/2026

Title Closes 2026-2029 Design and Review of Non-Bridge Structural Items Term Contract 06/12/2026

State Government of Montana

Bid Due: 6/12/2026

Bid - CoB - MSU Sewer Interceptor Replacement - Phase 1 Department: Community

City of Bozeman

Bid Due: 6/10/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.