| Location: | New York |
|---|---|
| Posted: | Sep 24, 2025 |
| Due: | Oct 20, 2025 |
| Agency: | The New York State Contract Reporter |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Description: Construction of a new 42-foot span precast concrete bridge with a 75-year service life. The bridge will be widened to two 11-foot lanes and 4-foot shoulders, with an improved hydraulic opening to adequately pass the 100-year storm. Approach roadway reconstruction will be done to allow for excavation and construction of the bridge as well as approving geometry. medium stone streambank protection will be used to prevent erosion, and new approach guiderail and bridge railing will be installed. Due Date: 10/20/2025 2:00 PMContract Term: 150 days Location: Town of Murray Ad Type: General
|

With GovernmentContracts, you can:
...is proposing to rehabilitate the pedestrian pathway and its associated railings, stabilize the ...
Westchester County
Bid Due: 6/18/2026
...with a new facade, entry stairs, doors, and railings shall be demolished and ...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 6/11/2026
...submission will not be considered. Work consists of replacement of damaged white thermoplastic ...
Port Chester village
Bid Due: 7/02/2026