Purchase & installation of Electric Vehicle Charging Stations - EP26/27-01

Location: Rhode Island
Posted: Oct 6, 2026
Due: Oct 21, 2026
Agency: City of East Providence
Type of Government: State & Local
Category:
  • 23 - Ground Effect Vehicles, Motor Vehicles, Trailers, and Cycles
Solicitation No: EP26/27-01
Publication URL: To access bid details, please log in.
Home » RFPs » Construction » Purchase & installation of Electric Vehicle Charging Stations
Purchase & installation of Electric Vehicle Charging Stations
Solicitation #
EP26/27-01
RFP Type
Construction
Closing Date
Wed, 10/21/2026 - 11:00am

CITY OF EAST PROVIDENCE

DEPARTMENT OF PLANNING & ECONOMIC DEVELOPMENT

REQUEST FOR PROPOSALS

RFP EP26/27-01

PURCHASE & INSTALLATION OF ELECTRIC VEHICLE CHARGING STATIONS

BID OPENING WEDNESDAY, OCTOBER 21, 2026, AT 11:00AM

ADVERTISEMENT

The City of East Providence is seeking competitive proposals from qualified vendors, equipment manufacturers, and licensed electrical contractors to furnish, deliver, install, and network six (6) commercial-grade Dual-Port Level 2 Electric Vehicle (EV) Charging Stations. The project location is the new Community Center located at 610 Waterman Ave, East Providence, RI 02914.

There will be a pre-bid site visit on Tuesday, October 6, 2026, at 2:00pm, located at the site of the new Community Center at 610 Waterman Ave, East Providence, RI 02914.

Specifications may be downloaded from the City’s website https://eastprovidenceri.gov/rfp

One (1) original, one (1) copy and 1 Thumb Drive of the proposal shall be submitted in one (1) sealed envelope to East Providence City Hall, Controllers Office, Room 103, Attn: Jessica Lamprey, Procurement Specialist, 145 Taunton Ave., East Providence, RI 02914 no later than WEDNESDAY, OCTOBER 21, 2026, AT 11:00AM. The bids will be publicly opened and recorded that same day in Conference Room 306, located on the third floor of East Providence City Hall. Bids received at a time of 11:01 AM or later will be rejected. The outside envelope needs to be marked RFP EP26/27-01 PURCHASE & INSTALLATION OF ELECTRIC VEHICLE CHARGING STATIONS.

The City reserves the right to waive any informality in order to reject any or all bids if deemed to be in the best interest of the City.

Any questions must be submitted in writing to Dominic Leonardo, Senior Planner, at dleonardo@eastprovidenceri.gov and Jessica Lamprey, Procurement Specialist at jlamprey@eastprovidenceri.gov no later than WEDNESDAY, OCTOBER 7, 2026, AT 4:00PM.


File/Document
Auxiliary Fields
  • Construction

Attachment Preview

CITY OF EAST PROVIDENCE
DEPARTMENT OF PLANNING AND ECONOMIC DEVELOPMENT
REQUEST FOR PROPOSALS
EP26/27-01
PURCHASE & INSTALLATION OF ELECTRIC VEHICLE CHARGING STATIONS
BID OPENING WENDESDAY, OCTOBER 14, 2026, AT 11:00AM
SPECIFICATIONS
I. Introduction
The City of East Providence is seeking competitive proposals from qualified vendors,
equipment manufacturers, and licensed electrical contractors to furnish, deliver,
install, and network six (6) commercial-grade Dual-Port Level 2 Electric Vehicle
(EV) Charging Stations. The project location is the new Community Center located at
610 Waterman Ave, East Providence, RI 02914.
The scope encompasses turnkey services including hardware procurement, full
electrical site preparation, concrete pad/base fabrication, physical protective bollard
installation, testing, commissioning, and a minimum three (3) year cloud-based
software network management service agreement.
II. SCOPE OF WORK & TECHNICAL SPECIFICATIONS
The selected Contractor shall provide all labor, tools, equipment, materials, permits,
and supervision necessary for a complete operational turnkey installation in full
compliance with local, state, and national electrical codes.
A. Hardware & Certification Requirements (6 Units)
* Energy Star Certification: All EVSE equipment purchased and installed must
be ENERGY STAR-certified. Level 1 (120V) equipment does not qualify.
* Charging Type: Commercial Level 2 EV Charging Stations (Dual-Port
configuration preferred).
* Output Power: Minimum 7.2 kW to 19.2 kW per port (30A to 80A continuous
output capacity per port).
* Connector Standard: SAE J1772 standard compliant (or dual J1772/NACS
option). Cables must be a minimum of 18-25 feet with integrated cable
management or retraction systems.
* Access & Payment: Integrated cellular communications, RFID reader, contact-
less credit card reader, and mobile application payment compatibility.
* Enclosure & Durability: NEMA 3R or NEMA 4 rated, weather-proof, vandal-
resistant enclosures suitable for outdoor New England climate conditions.
B. Site & Accessibility Requirements

* ADA Accessibility: At least one (1) ADA-accessible parking space must be
designated at the installation site in full compliance with applicable ADA
requirements, including proper operating heights, clear ground space, accessible
routes, and appropriate signage.
* Concrete Bases: Pour and cure dedicated concrete foundations/mounting pads
designed to manufacturer specifications for each charger unit.
* Bollard Protection: Install heavy-duty, steel concrete-filled protective bollards
(minimum 2 bollards per charging unit) painted high-visibility safety yellow or
covered with durable protective sleeves.
* Signage & Striping: Provide standard pavement markings (EV Charging Only, ADA
accessibility symbols) and post-mounted regulatory signage for all designated EV
charging spaces.
C. Permitting, Timeline & Execution
* Permitting: All required municipal, building, and electrical permits must be
obtained prior to installation. The contractor is responsible for filing and securing
all necessary permits.
* Execution Timeline: The project must be fully installed and operational no later
than December 5, 2026.
* Utility Coordination: Coordinate with local power utilities as necessary for service
capacity review or meter tie-ins.
D. Network, Cloud Service & Software Agreement
* Agreement Term & Commencement: A minimum three (3) year network/cloud
service agreement must be obtained and maintained for all installed EVSE units,
commencing from the date of operational status.
* Core Capabilities:
o Remote monitoring, automated diagnostics, fault reporting, and over-the-air
firmware updates.
o Customizable pricing schedules (e.g., fee-per-kWh, fee-per-hour, idle fees, or
municipal employee discounts).
o Automated payment processing and revenue collection/reimbursement to the
City.
o Comprehensive reporting dashboards tracking energy consumption, GHG
reductions, usage metrics, and revenue generation.
o Open Charge Point Protocol (OCPP) compliance (OCPP 1.6J or higher) to
prevent vendor lock-in.
E. Warranty & Maintenance
* Minimum 3-year comprehensive manufacturer warranty covering hardware, parts,
and labor.
* Service Level Agreement (SLA) specifying response times for hardware outages and
maintenance support.
III. SUBMISSION REQUIREMENTS & PROPOSAL STRUCTURE
Proposals must be organized logically and include the following mandatory sections:
1. Executive Summary & Company Qualifications: Profile of firm, years in business,
relevant licensing, and experience with municipal or commercial EVSE installations.

2. Technical Approach & Project Schedule: Detailed work plan confirming compliance
with the 6-month operational deadline, equipment spec sheets verifying ENERGY
STAR certification, trenching/pad design layout, and ADA layout design.
3. Network Software Specifications: Detailed capabilities of the cloud platform, security
features, reporting samples, and OCPP compliance proof.
4. References: Minimum of three (3) references for similar municipal or commercial EV
charging projects completed within the past 3 years.
5. Cost Proposal Sheet: Itemized pricing structured per Bid Form.
IV. EVALUATION CRITERIA
Evaluation Criteria Weight
Total Cost Proposal: Overall cost-effectiveness including hardware, installation, and
35%
3-year cloud fees.
Technical Specification & Compliance: Verification of ENERGY STAR
25%
certification, Level 2 specs, NEMA weather rating, and ADA site design.
Firm Experience & References: Demonstrated track record with municipal/public
20%
EVSE projects, licenses, and references.
Project Timeline & Execution: Ability to complete full installation and operational
10%
status within the required 6-month window.
Cloud Platform & Software Capabilities: OCPP compliance, payment integration,
10%
reporting features, and long-term support.
Any questions must be submitted in writing to Dominic Leonardo, Senior Planner, at
dleonardo@eastprovidenceri.gov and Jessica Lamprey, Procurement Specialist at
jlamprey@eastprovidenceri.gov no later than WEDNESDAY, OCTOBER 7, 2026, AT
4:00PM.

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...or hand-delivered in sealed envelopes addressed to the Town of North Kingstown Planning ...

Town of North Kingstown

Bid Due: 11/09/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.