Stillman Hall - Classroom Pool Rms 135 and 145

Location: Ohio
Posted: Oct 30, 2026
Due: Nov 16, 2026
Agency: Ohio Facility Construction Commission
Type of Government: State & Local
Category:
  • 71 - Furniture
Solicitation No: OSU-270077
Publication URL: To access bid details, please log in.
Publish Date Due Date Project Number Owner Authority Project Name Primary Service Estimated Project Cost Q&A Short List Notes
2026/10/30 2026/11/16 OSU-270077 The Ohio State University Local Higher Education Stillman Hall - Classroom Pool Rms 135 and 145 D-B $666,000 N/A TBD

Attachment Preview

Request for Qualifications (Design-Build Contract)
State of Ohio Standard Forms and Documents
Administration of Project: Local Higher Education
Stillman Hall - Classroom Pool Rms 135 and
Project Name 145 Response Deadline 11/16/2026 2:00 PM local time
Project Location Stillman Hall (0084) Project Number OSU-270077
City / County Columbus/ Franklin Project Manager David Warye
Owner The Ohio State University Contracting Authority Local Higher Education
Delivery Method Design-Build Prevailing Wages State
No. of paper copies requested (stapled, not bound) 0 No. of electronic copies requested (PDF) 1
Submit the Statements of Qualifications (Form F110-330) via email to 330Submittals@osu.edu. In the subject line, include the
project number and name for the RFQ you are responding to. See Section G of this RFQ for additional submittal instructions.
Submit all questions regarding this RFQ in writing to David Warye at warye.6@osu.edu with the project number and name
included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the
OFCC website at Project Opportunities on a regular basis until one week before the response deadline. The name of the party
submitting a question will not be included on the Q&A document.
Project Overview
A. Project Description
For this project, the Owner will be requesting a Competitive GMP at the time of Request for Proposal as part of
the Best Value selection process.
Stillman Hall is an academic building used by the Department of Arts and Sciences Advancement, College of Social Work,
and Office of Outreach and Engagement. The original portion of the building was constructed in 1939. The north wing of
the building was added in 1997. This project will renovate rooms 135, 145, 130 and corridor X107C located on the first
floor to align to the university strategic goals of modernizing existing classrooms, as well as the need to provide larger,
collaborative classrooms to better support evolving teaching and learning needs.
The Program of Requirements ("POR") is being developed by OTDI-Physical Learning Environments Interior Designer
and will be shared with the shortlisted teams for preparation of their GMP.
All aspects of the project and related issues will be implemented and operated consistently with the Contracting Authority
and/or Owner's policies and procedures.
B. Scope of Services
The Owner will be requesting a GMP as part of the Best Value selection process; therefore, self-performed work will be
approved, subject to the firm submitting an acceptable subcontractor plan. The short-listed firms are treated as approved
subcontractors for this purpose. There will be no obligation for the selected firm to solicit bids from subcontractors for the
purpose of comparing the price of proposed self-performed work. In addition, the contingency utilization provisions related
to the award of a low subcontractor bid are waived.
Per layout received from OTDI-PLE Interior Designer, room 135 is to be extended towards room 145 to accommodate the
need for a larger classroom capacity. Room 130 and corridor X107C will be impacted by the demolition of the wall
separating Rooms 135 and 145. The Design-Builder should plan on removing all existing power within the walls to be
demolished, conduits are to be capped in place.
Existing ceiling grid and light fixtures are to be demolished. New lighting layout and technology systems are to be
designed in full compliance with the University's Building Design Standards (BDS), with particular attention to classroom-
specific requirements. The Design Builder shall perform all necessary modifications to the existing HVAC and electrical
systems to support the new layout for all rooms impacted by the renovations (rooms 130, 135/145, and Corridor X107C).
F180-01-2022-MAR Publish Date:10/30/2026 Page 1 of 7

Request for Qualifications (Design-Build Contract) continued
Rooms 135/145, Room 130, and corridor X107C finishes are to be upgraded in accordance with the University's approved
branding palette. Existing markerboards in room 135 and chair rail are to be replaced. Four (4) new 12' whiteboards are to
be provided as part of the renovations, final count location is to be coordinated with OTDI-PLE during design. Built-in
counters in room 130 are to be removed.
The Design Builder is responsible for all wall patching, repair, and surface preparation required prior to the installation of
new finishes. The Design-Builder/Architect-Engineer (DB-A/E) shall propose finish materials and color selections for
rooms 135/145, 130 and corridor X107C that are consistent with the University's branding palette. Final finishes selections
shall be reviewed and approved by OTDI-PLE Interior Designer prior to procurement or installation.
FF&E selection and procurement are excluded from the Design-Build scope of work. However, the Design-Builder shall
coordinate with the University's selected FF&E vendor to ensure timing delivery and installation prior to the start of AUT '27
semester.
Stillman Hall- Room 135, 145, 130 and corridor
X107C existing layout.
Stillman Hall- Room 135, 130 and corridor
X107C proposed layout
F180-01-2022-MAR Publish Date: [leave blank] Page 2 of 7

Request for Qualifications (Design-Build Contract) continued
There are two alternates proposed for this project, see scope of renovations below.
Alternate #1- First floor corridors X105C and X106C flooring replacement: Existing flooring and cove base are to be
removed and replaced. The Design-Builder/Architect-Engineer (DB-A/E) shall propose finishes materials and color
selections in accordance with the University's approved branding palette. Final finishes selections shall be coordinated
with finishes proposed for base scope and should be reviewed and approved by OTDI-PLE Interior Designer prior to
procurement or installation.
Alternate #2 - Lounge areas 103 & 107 finishes and A/V upgrades (pathways only): Existing flooring and cove base
are to be removed and replaced within lounge areas 103 and 107. The Design-Builder/Architect-Engineer (DB-A/E) shall
propose finishes materials and color selections in accordance with the University's approved branding palette. Final
finishes selections shall be coordinated with finishes proposed for base scope and should be reviewed and approved by
OTDI-PLE Interior Designer prior to procurement or installation.
New A/V pathways and electrical changes within lounge areas 103 and 107 are to be coordinated during design.
FF&E selection and procurement are excluded from the Design-Build scope of work. However, the Design-Builder shall
coordinate with the University's selected FF&E vendor to ensure timing delivery and installation prior to the start of AUT '27
semester.
F180-01-2022-MAR Publish Date: [leave blank] Page 3 of 7

Request for Qualifications (Design-Build Contract) continued
The selected Design-Builder ("DB"), as a portion of its required Scope of Services and prior to submitting its proposal, will
discuss and clarify with the Contracting Authority and/or Owner, the breakdown of the Agreement detailed cost
components, to address the Owner's project requirements and refine the project schedule. Participate in the Encouraging
Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement.
As required by the Agreement, and as properly authorized, provide the following categories of services: develop and
maintain estimates of probable construction cost, Target Value Budget/Target Value Design, project schedules, and
construction schedules; lead and manage the Schematic Design, Design Development, Subcontractor Prequalification
and Bidding process, Construction Documents, Construction and Closeout stages.
The project shall follow the applicable University Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf
The selected DB will be required to sign the standard agreement provided at time of Request for Proposal. No
modifications to the requirements in the agreement will be accepted. Required Professional Liability Insurance will be per
General Conditions Articles 10.3.7, 10.3.8 and 10.3.9.
The preconstruction and construction services are generally described below. With the exception of self-performed work,
subcontracts including but not limited to Plumbing, Fire Protection, HVAC, and Electrical trades will be awarded by the DB
to prequalified vendors using a competitive process. The parties will engage in an "open book" pricing method in which all
subcontracted work shall be based upon competitive pricing that will be reviewed by the Contracting Authority/Owner, the
Criteria A/E and the DB. The Contracting Authority/Owner shall have access to all books, records, documents and other
data in the DB's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or
performance of the Agreement.
Preconstruction Services: The DB will work cooperatively with the Contracting Authority/Owner, Criteria A/E and Project
Team, and will provide, among other services, schedule development, estimate development, program verification,
schematic design, design development, subcontractor prequalification and bidding, construction documents preparation,
constructability review, permits, budgeting, Target Value Budget/Target Value Design, and preconstruction planning
throughout the preconstruction stages.
Construction Services: The DB shall construct the Project pursuant to the construction documents and in accordance with
the schedule requirements. The DB shall hold all subcontracts and shall be fully responsible for the means and methods
of construction, weekly progress meetings, testing and inspections, project safety, project completion within the schedule
agreed upon in the preconstruction phase, compliance with all applicable laws and regulations including monitoring
compliance with all EDGE, equal employment, and prevailing wage requirements, and submitting monthly reports of these
activities to the Contracting Authority. All subcontracts shall be on the subcontract form prescribed by OAC Section 153:1-
03-02. The Contracting Authority reserves the right to approve the DB's selection of subcontractors and any supplemental
terms to the subcontract form.
The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors
and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects within
Ohio State buildings are set forth in the Building Design Standards Appendix V and are summarized here:
https://fod.osu.edu/resources under the section titled "Construction Site Safety Requirements."
Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using e-
Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. The Ohio
State University Project Closeout Standards can be accessed via the OSU FOD vender resource website
(https://fod.osu.edu/resources) under Post Construction / Close Out.
For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form
F110-330), below is a list of relevant scope of work requirements for this RFQ:
1. Design Build Project Delivery Method
2. Role on Projects completed as the Design Build
3. Mechanical, Electrical and Technology Design Experience
4. Sustainable Design Experience
5. Interiors/Finishes
For the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330),
projects must have been completed by the Design Build Firm.
F180-01-2022-MAR Publish Date: [leave blank] Page 4 of 7

Qualifications Due 11/16/2026
RFP issued to the Short-Listed Firms 11/17/2026
Proposals Due 11/25/2026
Interviews 11/30/2026
Selection of DB 12/02/2026

Request for Qualifications (Design-Build Contract) continued
C. Funding / Estimated Budget
Total Project Cost $666,000 State Funding $0
Construction Cost $497,000 Other Funding $666,000
D. Anticipated Schedule E. EDGE Participation Goal
DB Preconstruction Services Start 01 / 2027
Percent of the DB's total compensation
Construction Stage Notice to Proceed 04 / 2027 excluding DB's Contingency* 5%
Substantial Completion of all Work 08 / 2027
*Preconstruction Stage Compensation plus Contract Sum
DB Services Completed 10 / 2027 minus DB's Contingency
F. Evaluation Criteria for Selection
Selection Criteria: The DB will be selected using (i) qualifications-based process during the Request for Qualifications
(RFQ) stage to develop a short list and (ii) best value process during the Request for Proposal (RFP) stage. The
qualifications-based criteria for the RFQ is included in this announcement. The best value criteria used in evaluating
proposals from short listed firms will include such factors that are determined to derive or offer the greatest value to the
State and Owner, combining both qualifications and fee.
Short List: Each firm responding to this RFQ will be evaluated and selected based on its qualifications and the
qualifications and experience of the particular individuals identified as the candidate's proposed team for the Project. After
evaluating the responses to this RFQ, the Contracting Authority will select a short list of no fewer than three candidates
that it considers to be the most qualified, except if the Contracting Authority determines that fewer than three firms are
qualified, it will only select the qualified firms.
Request for Proposal: The short-listed firms shall be sent a Request for Proposal ("RFP") that will invite the firms to submit
pricing proposals containing their proposed preconstruction stage compensation, construction stage personnel costs,
itemized construction stage general conditions costs, construction stage contingency percentage, construction stage
design fee percentage, and design-build fee percentage. The short-listed candidates will also receive (i) form of the
Agreement with the Contracting Authority containing the contract terms and conditions, (ii) set of the most recent criteria
documents and (iii) proposed Project schedule.
Pre-Proposal Meeting: Prior to submitting a response to the RFP, the short-listed firms will be invited to meet individually
with the Contracting Authority/Owner. The purpose of the pre-proposal meeting is to permit the short-listed firms an
opportunity to ask the Contracting Authority/Owner questions in an individual setting to help the firms prepare their
responses to the RFP. The Contracting Authority will notify each short-listed firm to schedule individual times for the pre-
proposal meetings.
At the pre-proposal meeting, short-listed firms will be required to submit the completed Contractor Pre-Work Evaluation
form, available here https://fod.osu.edu/resources, under the section titled "Construction Site Safety Requirements."
Interview: After submitting responses to the RFP, the short-listed firms will be interviewed by the Contracting
Authority/Owner. The purpose of the interview will be to meet the proposed Project team, become familiar with key
personnel, and understand the project approach and ability to meet the stated objectives for the Project. Please be
prepared to discuss with specificity the firm's capacity to conduct this work in compliance with the timetable, budget and
EDGE expectations. The Contracting Authority will notify each short-listed firm to schedule individual times for the
interviews.
Selection Schedule: Tentative schedule is subject to change.
Qualifications Due 11/16/2026
RFP issued to the Short-Listed Firms 11/17/2026
Proposals Due 11/25/2026
Interviews 11/30/2026
Selection of DB 12/02/2026
Cancellation and Rejection: The Contracting Authority reserves the right to reject all proposals and cancel at any time for
any reason this solicitation, any portion of this solicitation or any phase of the Project. The Contracting Authority shall
have no liability to any proposer arising out of such cancellation or rejection. The Contracting Authority reserves the right
to waive minor variations in the selection process.
F180-01-2022-MAR Publish Date: [leave blank] Page 5 of 7

Request for Qualifications (Design-Build Contract) continued
Interested DB firms are required to submit the Commitment to Participate in the EDGE Business Assistance Program form
in its Statement of Qualifications (Form F110-330) submitted in response to the RFQ, to indicate its intent to contract with
and use EDGE-certified Business Enterprise(s), as a part of the DB's team. The EDGE Affidavit and / or waiver request
letter and Demonstration of Good Faith Effort form(s) with complete documentation must be attached to the DB's
Proposal. Both forms can be accessed via the OFCC website at Procurement Forms.
If the DB firm intends to receive points for exceeding the EDGE Participation Goal, it must provide BOTH a
completed Commitment to Participate form AND a completed Statement of Intent to Contract and to Perform forms
signed by both parties with its Statement of Qualifications.
For all Statements of Qualifications, please identify the EDGE-certified Business Enterprises, by name, which will
participate in the delivery of the proposed professional services solicited in the RFQ.
Interested DB firms must indicate on their Statement of Qualifications, the locations where their services will be performed
in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12D related to
providing services only within the United States and the requirements of Executive Order 2022-02D prohibiting purchases
from or investment in any Russian institution or company. Failure to do so may cause their Statement of Qualifications to
be rejected.
G. Submittal Instructions
Firms are required to submit the current version of Statement of Qualifications (Form F110-330) available via the OFCC
website at Procurement Forms.
Electronic submittals should be combined into one PDF file saved with the form name, project number listed on the RFQ
and your firm's name (ex. F110-330_OSU-nnnnnn_Firm Name). Use the "print" feature of Adobe Acrobat or similar
software for creating a PDF rather than using a scanner. If possible, please reduce the file size of the PDF. In Acrobat, go
to Advanced, then PDF Optimizer.
Statements of Qualifications must be submitted electronically by email. Submittals are limited to one email with a
maximum file size of 25 MB.
Unless otherwise noted or exempt, all documents submitted to the Contracting Authority in response to this RFQ and
subsequent RFP are public and will be available for inspection at the conclusion of the selection process. The following
information shall remain confidential and will not be released: (1) Proposal Form(s), except for cost category subtotals
which will be transferred to the Best Value Rating Form; (2) Financial Capacity; and (3) Bonding/Insurance.
Proposers are requested to submit the following information in response to this RFQ within Section H of Form F110-330.
1. Summary: Provide a summary, on one page or less, describing why your firm/team is the most qualified for the
Project.
2. Bonding/Insurance: Provide evidence of capacity to provide bonding in the amount of the construction budget
(e.g. a letter from your Surety agent stating that one or more Sureties will issue Bonds in the amount of the
construction budget if your team is selected) and a copy of the firm's certificate of insurance showing the firm's
current limits of liability for commercial general liability, employer's liability, business automobile liability, and
professional liability insurance.
3. Management Systems: Describe the scheduling and cost control systems the firm would propose to use for the
Project.
a. The project team (Owner / C-AE / DB) will be required to utilize eBuilder, the University's Project
Management System, for all compatible services required by the University. Please comment on
incorporating this system into your construction services and in conjunction with your prescribed corporate
project management systems, if any.
4. Self-Performed Work: Indicate whether the firm intends to self-perform any work on the Project through a
competitive process and, if so, the nature of the work and capability to self-perform.
5. Estimating: Demonstrated track record of performance of in-house estimating on projects comparable to the
Project.
6. Scheduling: Demonstrated track record of performance of managing projects to the original schedule.
Firms are requested to identify professional registrations, memberships and credentials including but not limited to: LEED
GA, LEED AP, LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and construction
industry credentials. Identify that information on the resume page for individual in Block 22, Section E of the F110-330
form.
F180-01-2022-MAR Publish Date: [leave blank] Page 6 of 7

Selection Criteria Value Score
1. Primary Firm Location and Workload (Maximum 10 points)
a. Proximity of firm to project site Less than 50 miles 5
50 miles to 100 miles 2
More than 100 miles 0
b. Amount of contracts awarded by Contracting Authority in previous 24 months Less than $200,000 5
$200,000 to $1,000,000 2
More than $1,000,000 0
2. Primary Qualifications (Maximum 35 points)
a. Project management lead Experience / ability of project manager to manage scope / budget / schedule / quality 0 - 10
b. Project design lead Experience / creativity of project designer to achieve owner's vision and requirements 0 - 10 Max = 25
c. Technical staff Experience / ability of technical staff to coordinate construction documents and develop accurate estimates and schedules 0 - 5
d. Construction administration staff Experience / ability of field representatives to identify and solve issues during construction 0 - 10
3. Key Consultant Qualifications (Maximum 15 points)
a. Key consultants Experience / ability of key consultants to perform effectively and collaboratively 0 - 10
b. Proposed EDGE-certified Consultant participation* One point for every 2 percent 0 - 5
increase in Services compensation** over
theEDGE participation goal
4. Overall Team Qualifications (Maximum 10 points)
a. Previous team collaboration Less than 4 sample projects 0 Max = 3
4 to 6 sample projects 2
More than 6 sample projects 3
b. OSU Sustainability Standards or LEED*** project experience LEED projects 1 Max = 2
OSU Sustainability Standards projects 2
c. BIM project experience Training and knowledge 1 Max = 3
Direct project experience 3
d. Team organization Clarity of responsibility / communication demonstrated by table of organization 0 - 2
5. Overall Team Experience (Maximum 30 points)
a. Previous team performance Past performance as indicated by evaluations and letters of reference 0 - 10
b. Experience with similar projects / delivery methods Less than 5 projects 0 - 3
5 to 7 projects 4 - 6
More than 7 projects 7 - 10
c. Budget and schedule management Performance in completing projects within original construction budget and schedule 0 - 5
d. Knowledge of Ohio Capital Improvements process Less than 5 projects 0 - 1
5 to 7 projects 2 - 3
More than 7 projects 4 - 5
Subtotal

Design-Build Selection Rating Form
State of Standard Forms and Documents
Project Name Stillman Hall - Classroom Pool Rms 135 and 145 Proposer Firm
Project Number OSU-270077 City, State, Zip
Selection Criteria Value Score
1. Primary Firm Location and Workload (Maximum 10 points)
Less than 50 miles 5
a. Proximity of firm to project site 50 miles to 100 miles 2
More than 100 miles 0
Less than $200,000 5
b. Amount of contracts awarded by Contracting
$200,000 to $1,000,000 2
Authority in previous 24 months
More than $1,000,000 0
2. Primary Qualifications (Maximum 35 points)
Experience / ability of project manager to
a. Project management lead 0 - 10
manage scope / budget / schedule / quality
Experience / creativity of project designer to
b. Project design lead 0 - 10
achieve owner's vision and requirements
Experience / ability of technical staff to
Max =
c. Technical staff coordinate construction documents and 0 - 5
25
develop accurate estimates and schedules
Experience / ability of field representatives to
d. Construction administration staff 0 - 10
identify and solve issues during construction
3. Key Consultant Qualifications (Maximum 15 points)
Experience / ability of key consultants to
a. Key consultants 0 - 10
perform effectively and collaboratively
One point for every 2 percent
b. Proposed EDGE-certified Consultant participation* increase in Services compensation** over 0 - 5
theEDGE participation goal
4. Overall Team Qualifications (Maximum 10 points)
Less than 4 sample projects 0
a. Previous team collaboration 4 to 6 sample projects 2 Max = 3
More than 6 sample projects 3
b. OSU Sustainability Standards or LEED*** project LEED projects 1
Max = 2
experience OSU Sustainability Standards projects 2
Training and knowledge 1
c. BIM project experience Max = 3
Direct project experience 3
Clarity of responsibility / communication
d. Team organization 0 - 2
demonstrated by table of organization
5. Overall Team Experience (Maximum 30 points)
Past performance as indicated by
a. Previous team performance 0 - 10
evaluations and letters of reference
Less than 5 projects 0 - 3
b. Experience with similar projects / delivery methods 5 to 7 projects 4 - 6
More than 7 projects 7 - 10
Performance in completing projects within
c. Budget and schedule management 0 - 5
original construction budget and schedule
Less than 5 projects 0 - 1
d. Knowledge of Ohio Capital Improvements process 5 to 7 projects 2 - 3
More than 7 projects 4 - 5
* Must be comprised of consulting firm(s) and NOT the lead firm
** Preconstruction Stage Compensation plus Contract Sum minus Subcontracted Work, Self-performed
Work, and DB's Contingency Subtotal
*** Leadership in Energy & Environmental Design administered by the Green Building Certification
Institute
Notes: Evaluator:
Name
Signature Date
F180-01-2022-MAR Publish Date:10/30/2026 Page 7 of 7

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Solicitation ID: SRC0000042738 Solicitation Name: SFM - ACAD - FY27 - Non-IT Goods

State Government of Ohio

Bid Due: 11/18/2026

Due 2/4/2027 4:00 pm US/Eastern Question Deadline 12/1/2026 12:00 pm US/Eastern Open 2026-CON-1229-RFP

Columbus Regional Airport Authority

Bid Due: 2/04/2027

Solicitation ID: SRC0000042896 Solicitation Name: CHJCF_Game Room Makeover_10/30/2026 Original Begin Date: 11/4/2026 2:00:14

State Government of Ohio

Bid Due: 11/23/2026

George Miller Covered Bridge Restoration November 23, 2026 @ 10:00 AM Open

County of Brown

Bid Due: 11/23/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.