Jennings Hall - Classroom Pool Rms 001 and 155

Location: Ohio
Posted: Oct 30, 2026
Due: Nov 16, 2026
Agency: Ohio Facility Construction Commission
Type of Government: State & Local
Category:
  • 71 - Furniture
Solicitation No: OSU-270078
Publication URL: To access bid details, please log in.
Publish Date Due Date Project Number Owner Authority Project Name Primary Service Estimated Project Cost Q&A Short List Notes
2026/10/30 2026/11/16 OSU-270078 The Ohio State University Local Higher Education Jennings Hall - Classroom Pool Rms 001 and 155 D-B $1,460,000 N/A TBD

Attachment Preview

Request for Qualifications (Design-Build Contract)
State of Ohio Standard Forms and Documents
Administration of Project: Local Higher Education
Jennings Hall - Classroom Pool Rms 001
Project Name and 155 Response Deadline 11/16/2026 2:00 PM local time
Project Location Jennings Hall (0014) Project Number OSU-270078
City / County Columbus/ Franklin Project Manager David Warye
Owner The Ohio State University Contracting Authority Local Higher Education
Delivery Method Design-Build Prevailing Wages State
No. of paper copies requested (stapled, not bound) 0 No. of electronic copies requested (PDF) 1
Submit the Statements of Qualifications (Form F110-330) via email to 330Submittals@osu.edu. In the subject line, include the
project number and name for the RFQ you are responding to. See Section G of this RFQ for additional submittal instructions.
Submit all questions regarding this RFQ in writing to David Warye at warye.6@osu.edu with the project number and name
included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the
OFCC website at Project Opportunities on a regular basis until one week before the response deadline. The name of the party
submitting a question will not be included on the Q&A document.
Project Overview
A. Project Description
For this project, the Owner will be requesting a Competitive GMP at the time of Request for Proposal as part of
the Best Value selection process.
Jennings Hall is an academic building used by the Department of Arts and Sciences Advancement, original construction in
1914, spans 112,502 square feet and is located on 1735 Neil Avenue, Columbus, OH. The HVAC system features air
handling units with heating and cooling loops, supported by pumps and auxiliary cooling systems.
All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority
and/or Owner's policies and procedures.
This project is to renovate Lecture Hall 155 located on the first floor and Lecture Hall 001 located on the ground floor. The
renovations are to start the last week of April 2027 and all construction activities are to be completed prior to Fall
Semester 2027. Criteria documents prepared by the OSU-OTDI Lead Interior Designer, as well as the Hazardous
Materials (HazMat) survey, will be made available to short-listed firms for use in the development of their technical and
cost proposals.
OTDI-LCE requires three weeks prior to Fall Semester to install technology systems in both Lecture Halls. OTDI-LCE will
provide and install AV technology which includes projects, displays, projection screens, mounting accessories and ceiling
mounted microphones. Design Builder (DB) to provide mounting structure for ceiling mounted projectors and video
displays. Provide duplex receptacles in ceiling for each projector as well as wall boxes and wire path for low voltage.
The DB is responsible for all wall patching, repair, and surface preparation required prior to the installation of new finishes.
The DB shall propose finish materials and color selections for both Lecture Halls that are consistent with the University's
branding palette. Final finishes selections shall be reviewed and approved by the OSU-OTDI Lead Interior Designer prior
to procurement or installation.
DB shall perform all necessary modifications to existing HVAC and electrical systems to support the new ceiling layout.
DB to provide any necessary modifications in the Lecture Halls to support OSU's deferred maintenance program as
needed in the spaces.
F180-01-2022-MAR Publish Date: 10/30/2026 Page 1 of 6

Request for Qualifications (Design-Build Contract) continued
Lecture Hall 001 (3,233 S.F.)
The scope of work for Lecture Hall 001 shall include the removal of partition walls around the ADA ramp and all fixed
seating. Existing ceiling grid and lighting fixtures are to be demolished. Provide new grid, ceiling tile and lighting. Lighting
layout and technology systems are to be designed in full compliance with University's Building Design Standards (BDS),
with particular attention to classroom specific requirements. OTDI will demolish all existing technology between 5/5/27 and
5/7/27. Existing chalkboards are to be removed and replaced with new whiteboards. The contractor is to field-verify all
existing wall dimensions. Final whiteboard quantities and locations shall be coordinated during design with the OTDI Lead
Interior Designer. All existing acoustical panel tackboards shall be removed and replaced.
The contractor is to install the owner-provided projection screen and coordinate any required electrical modifications to
support the installation.
Provide new fixed seating (Classroom Pool standard: KI Concerto), new carpet and paint. Provide new signage outside of
Lecture Hall as well as new ST-25 flag signs above doors. Provide new door Classroom Pool hardware and stickers
indicating emergency lock use.
DB to provide geo-technical support to investigate water penetration reported in the lower portion of Lecture Hall.
Lecture Hall 155 (1,921 S.F.)
The scope of work for Lecture Hall 155 shall include the removal of all fixed seating. Existing ceiling grid and lighting
fixtures to be demolished. Provide new grid, ceiling tile and lighting. Lighting layout and technology systems are to be
designed in full compliance with University's Building Design Standards (BDS), with particular attention to classroom
specific requirements. OTDI will demolish all existing technology between 5/5/27 and 5/7/27. Existing chalkboards are to
be removed and replaced with new whiteboards. The contactor is to field-verify all existing wall dimensions. Final
whiteboard quantities and locations shall be coordinated during the design phase with the OTDI Lead Interior Designer;
however, the design shall include a minimum of four (4) new whiteboards. All existing acoustical panel tackboards shall be
removed and replaced.
The contractor is to install the owner-provided projection screen and coordinate any required electrical modifications to
support the installation.
Provide new fixed seating (Classroom Pool standard: KI Concerto), new carpet and paint. Provide new signage outside of
Lecture Hall as well as new ST-25 flag signs above doors. Provide new door Classroom Pool hardware and stickers
indicating emergency lock use.
DB to address tier/slope of seating area to reduce trip hazard.
The DB shall plan for and implement all necessary asbestos abatement measures to address asbestos-containing debris
identified by EHS on the surface on the existing ceiling tiles.
B. Scope of Services
The Owner will be requesting a GMP as part of the Best Value selection process; therefore, self-performed work will be
approved, subject to the firm submitting an acceptable subcontractor plan. The short-listed firms are treated as approved
subcontractors for this purpose. There will be no obligation for the selected firm to solicit bids from subcontractors for the
purpose of comparing the price of proposed self-performed work. In addition, the contingency utilization provisions related
to the award of a low subcontractor bid are waived.
The selected Design-Builder ("DB"), as a portion of its required Scope of Services and prior to submitting its proposal, will
discuss and clarify with the Contracting Authority and/or Owner, the breakdown of the Agreement detailed cost
components, to address the Owner's project requirements and refine the project schedule. Participate in the Encouraging
Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement.
As required by the Agreement, and as properly authorized, provide the following categories of services: develop and
maintain estimates of probable construction cost, Target Value Budget/Target Value Design, project schedules, and
construction schedules; lead and manage the Schematic Design, Design Development, Subcontractor Prequalification
and Bidding process, Construction Documents, Construction and Closeout stages.
The project shall follow the applicable University Sustainability Standards: https://fod.osu.edu/sites/default/files/div_18.pdf.
F180-01-2022-MAR Publish Date: [leave blank] Page 2 of 6

Request for Qualifications (Design-Build Contract) continued
The selected DB will be required to sign the standard agreement provided at time of Request for Proposal. No
modifications to the requirements in the agreement will be accepted. Required Professional Liability Insurance will be per
General Conditions Articles 10.3.7, 10.3.8 and 10.3.9.
The preconstruction and construction services are generally described below. With the exception of self-performed work,
subcontracts including but not limited to Plumbing, Fire Protection, HVAC, and Electrical trades will be awarded by the DB
to prequalified vendors using a competitive process. The parties will engage in an "open book" pricing method in which all
subcontracted work shall be based upon competitive pricing that will be reviewed by the Contracting Authority/Owner, the
Criteria A/E and the DB. The Contracting Authority/Owner shall have access to all books, records, documents and other
data in the DB's possession related to itself, its subcontractors and material suppliers pertaining to bidding, pricing or
performance of the Agreement.
Preconstruction Services: The DB will work cooperatively with the Contracting Authority/Owner, Criteria A/E and Project
Team, and will provide, among other services, schedule development, estimate development, program verification,
schematic design, design development, subcontractor prequalification and bidding, construction documents preparation,
constructability review, permits, budgeting, Target Value Budget/Target Value Design, and preconstruction planning
throughout the preconstruction stages.
Construction Services: The DB shall construct the Project pursuant to the construction documents and in accordance with
the schedule requirements. The DB shall hold all subcontracts and shall be fully responsible for the means and methods
of construction, weekly progress meetings, testing and inspections, project safety, project completion within the schedule
agreed upon in the preconstruction phase, compliance with all applicable laws and regulations including monitoring
compliance with all EDGE, equal employment, and prevailing wage requirements, and submitting monthly reports of these
activities to the Contracting Authority. All subcontracts shall be on the subcontract form prescribed by OAC Section 153:1-
03-02. The Contracting Authority reserves the right to approve the DB's selection of subcontractors and any supplemental
terms to the subcontract form.
The Ohio State University is dedicated to providing a safe and healthy environment for students, patients, staff, visitors
and contractors. While not exclusive, guidelines governing safety expectations for construction/ renovation projects within
Ohio State buildings are set forth in the Building Design Standards Appendix V and are summarized here:
https://fod.osu.edu/resources under the section titled "Construction Site Safety Requirements."
Closeout Services: The closeout for this project is required to be delivered in an electronic cloud-based format using e-
Builder Project Management System and adhere to The Ohio State University Project Closeout Standards. The Ohio
State University Project Closeout Standards can be accessed via the OSU FOD vender resource website
(https://fod.osu.edu/resources) under Post Construction / Close Out.
For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form
F110-330), below is a list of relevant scope of work requirements for this RFQ:
1. Sustainable Design Experience
For the purpose of the selection of 10 Relevant Projects in Section F of the Statement of Qualification (Form F110-330),
projects must have been completed by the Design Build Firm.
C. Funding / Estimated Budget
Total Project Cost $1,460,000 State Funding $0
Construction Cost $1,165,000 Other Funding $1,460,000
D. Anticipated Schedule E. EDGE Participation Goal
DB Preconstruction Services Start 01 / 2027
Percent of the DB's total compensation
Construction Stage Notice to Proceed 04 / 2027 excluding DB's Contingency* 5%
Substantial Completion of all Work 08 / 2027
*Preconstruction Stage Compensation plus Contract Sum
DB Services Completed 10 / 2027 minus DB's Contingency
F. Evaluation Criteria for Selection
Selection Criteria: The DB will be selected using (i) qualifications-based process during the Request for Qualifications
(RFQ) stage to develop a short list and (ii) best value process during the Request for Proposal (RFP) stage. The
qualifications-based criteria for the RFQ is included in this announcement. The best value criteria used in evaluating
F180-01-2022-MAR Publish Date: [leave blank] Page 3 of 6

Qualifications Due 11/16/2026
RFP issued to the Short-Listed Firms 11/17/2026
Proposals Due 11/30/2026
Interviews 12/02/2026
Selection of DB 12/04/2026

Request for Qualifications (Design-Build Contract) continued
proposals from short listed firms will include such factors that are determined to derive or offer the greatest value to the
State and Owner, combining both qualifications and fee.
Short List: Each firm responding to this RFQ will be evaluated and selected based on its qualifications and the
qualifications and experience of the particular individuals identified as the candidate's proposed team for the Project. After
evaluating the responses to this RFQ, the Contracting Authority will select a short list of no fewer than three candidates
that it considers to be the most qualified, except if the Contracting Authority determines that fewer than three firms are
qualified, it will only select the qualified firms.
Request for Proposal: The short-listed firms shall be sent a Request for Proposal ("RFP") that will invite the firms to submit
pricing proposals containing their proposed preconstruction stage compensation, construction stage personnel costs,
itemized construction stage general conditions costs, construction stage contingency percentage, construction stage
design fee percentage, and design-build fee percentage. The short-listed candidates will also receive (i) form of the
Agreement with the Contracting Authority containing the contract terms and conditions, (ii) set of the most recent criteria
documents and (iii) proposed Project schedule.
Pre-Proposal Meeting: Prior to submitting a response to the RFP, the short-listed firms will be invited to meet individually
with the Contracting Authority/Owner. The purpose of the pre-proposal meeting is to permit the short-listed firms an
opportunity to ask the Contracting Authority/Owner questions in an individual setting to help the firms prepare their
responses to the RFP. The Contracting Authority will notify each short-listed firm to schedule individual times for the pre-
proposal meetings.
At the pre-proposal meeting, short-listed firms will be required to submit the completed Contractor Pre-Work Evaluation
form, available here https://fod.osu.edu/resources, under the section titled "Construction Site Safety Requirements."
Interview: After submitting responses to the RFP, the short-listed firms will be interviewed by the Contracting
Authority/Owner. The purpose of the interview will be to meet the proposed Project team, become familiar with key
personnel, and understand the project approach and ability to meet the stated objectives for the Project. Please be
prepared to discuss with specificity the firm's capacity to conduct this work in compliance with the timetable, budget and
EDGE expectations. The Contracting Authority will notify each short-listed firm to schedule individual times for the
interviews.
Selection Schedule: Tentative schedule is subject to change.
Qualifications Due 11/16/2026
RFP issued to the Short-Listed Firms 11/17/2026
Proposals Due 11/30/2026
Interviews 12/02/2026
Selection of DB 12/04/2026
Cancellation and Rejection: The Contracting Authority reserves the right to reject all proposals and cancel at any time for
any reason this solicitation, any portion of this solicitation or any phase of the Project. The Contracting Authority shall
have no liability to any proposer arising out of such cancellation or rejection. The Contracting Authority reserves the right
to waive minor variations in the selection process.
Interested DB firms are required to submit the Commitment to Participate in the EDGE Business Assistance Program form
in its Statement of Qualifications (Form F110-330) submitted in response to the RFQ, to indicate its intent to contract with
and use EDGE-certified Business Enterprise(s), as a part of the DB's team. The EDGE Affidavit and / or waiver request
letter and Demonstration of Good Faith Effort form(s) with complete documentation must be attached to the DB's
Proposal. Both forms can be accessed via the OFCC website at Procurement Forms.
If the DB firm intends to receive points for exceeding the EDGE Participation Goal, it must provide BOTH a
completed Commitment to Participate form AND a completed Statement of Intent to Contract and to Perform forms
signed by both parties with its Statement of Qualifications.
For all Statements of Qualifications, please identify the EDGE-certified Business Enterprises, by name, which will
participate in the delivery of the proposed professional services solicited in the RFQ.
Interested DB firms must indicate on their Statement of Qualifications, the locations where their services will be performed
in the spaces provided or by attachment in accordance with the requirements of Executive Order 2019-12D related to
providing services only within the United States and the requirements of Executive Order 2022-02D prohibiting purchases
from or investment in any Russian institution or company. Failure to do so may cause their Statement of Qualifications to
be rejected.
F180-01-2022-MAR Publish Date: [leave blank] Page 4 of 6

Request for Qualifications (Design-Build Contract) continued
G. Submittal Instructions
Firms are required to submit the current version of Statement of Qualifications (Form F110-330) available via the OFCC
website at Procurement Forms.
Electronic submittals should be combined into one PDF file saved with the form name, project number listed on the RFQ
and your firm's name (ex. F110-330_OSU-nnnnnn_Firm Name). Use the "print" feature of Adobe Acrobat or similar
software for creating a PDF rather than using a scanner. If possible, please reduce the file size of the PDF. In Acrobat, go
to Advanced, then PDF Optimizer.
Statements of Qualifications must be submitted electronically by email. Submittals are limited to one email with a
maximum file size of 25 MB.
Unless otherwise noted or exempt, all documents submitted to the Contracting Authority in response to this RFQ and
subsequent RFP are public and will be available for inspection at the conclusion of the selection process. The following
information shall remain confidential and will not be released: (1) Proposal Form(s), except for cost category subtotals
which will be transferred to the Best Value Rating Form; (2) Financial Capacity; and (3) Bonding/Insurance.
Proposers are requested to submit the following information in response to this RFQ within Section H of Form F110-330.
1. Summary: Provide a summary, on one page or less, describing why your firm/team is the most qualified for the
Project.
2. Bonding/Insurance: Provide evidence of capacity to provide bonding in the amount of the construction budget
(e.g. a letter from your Surety agent stating that one or more Sureties will issue Bonds in the amount of the
construction budget if your team is selected) and a copy of the firm's certificate of insurance showing the firm's
current limits of liability for commercial general liability, employer's liability, business automobile liability, and
professional liability insurance.
3. Management Systems: Describe the scheduling and cost control systems the firm would propose to use for the
Project.
a. The project team (Owner / C-AE / DB) will be required to utilize eBuilder, the University's Project
Management System, for all compatible services required by the University. Please comment on
incorporating this system into your construction services and in conjunction with your prescribed corporate
project management systems, if any.
4. Self-Performed Work: Indicate whether the firm intends to self-perform any work on the Project through a
competitive process and, if so, the nature of the work and capability to self-perform.
5. Estimating: Demonstrated track record of performance of in-house estimating on projects comparable to the
Project.
6. Scheduling: Demonstrated track record of performance of managing projects to the original schedule.
Firms are requested to identify professional registrations, memberships and credentials including but not limited to: LEED
GA, LEED AP, LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and construction
industry credentials. Identify that information on the resume page for individual in Block 22, Section E of the F110-330
form.
F180-01-2022-MAR Publish Date: [leave blank] Page 5 of 6

Selection Criteria Value Score
1. Primary Firm Location and Workload (Maximum 10 points)
a. Proximity of firm to project site Less than 50 miles 5
50 miles to 100 miles 2
More than 100 miles 0
b. Amount of contracts awarded by Contracting Authority in previous 24 months Less than $200,000 5
$200,000 to 1,000,000 2
More than $1,000,000 0
2. Primary Qualifications (Maximum 35 points)
a. Project management lead Experience / ability of project manager to manage scope / budget / schedule / quality 0 - 10
b. Project design lead Experience / creativity of project designer to achieve owner's vision and requirements 0 - 10 Max = 25
c. Technical staff Experience / ability of technical staff to coordinate construction documents and develop accurate estimates and schedules 0 - 5
d. Construction administration staff Experience / ability of field representatives to identify and solve issues during construction 0 - 10
3. Key Consultant Qualifications (Maximum 15 points)
a. Key consultants Experience / ability of key consultants to perform effectively and collaboratively 0 - 10
b. Proposed EDGE-certified Consultant participation* One point for every 2 percent 0 - 5
increase in Services compensation** over
theEDGE participation goal
4. Overall Team Qualifications (Maximum 10 points)
a. Previous team collaboration Less than 2 sample projects 0 Max = 3
2 to 4 sample projects 2
More than 4 sample projects 3
b. OSU Sustainability Standards or LEED*** project experience LEED projects 1 Max = 2
OSU Sustainability Standards projects 2
c. BIM project experience Training and knowledge 1 Max = 3
Direct project experience 3
d. Team organization Clarity of responsibility / communication demonstrated by table of organization 0 - 2
5. Overall Team Experience (Maximum 30 points)
a. Previous team performance Past performance as indicated by evaluations and letters of reference 0 - 10
b. Experience with similar projects / delivery methods Less than 3 projects 0 - 3
3 to 6 projects 4 - 6
More than 6 projects 7 - 10
c. Budget and schedule management Performance in completing projects within original construction budget and schedule 0 - 5
d. Knowledge of Ohio Capital Improvements process Less than 3 projects 0 - 1
3 to 6 projects 2 - 3
More than 6 projects 4 - 5
Subtotal

Design-Build Selection Rating Form
State of Standard Forms and Documents
Project Name Jennings Hall - Classroom Pool Rms 001 and 155 Proposer Firm
Project Number OSU-270078 City, State, Zip
Selection Criteria Value Score
1. Primary Firm Location and Workload (Maximum 10 points)
Less than 50 miles 5
a. Proximity of firm to project site 50 miles to 100 miles 2
More than 100 miles 0
Less than $200,000 5
b. Amount of contracts awarded by Contracting
$200,000 to 1,000,000 2
Authority in previous 24 months
More than $1,000,000 0
2. Primary Qualifications (Maximum 35 points)
Experience / ability of project manager to
a. Project management lead 0 - 10
manage scope / budget / schedule / quality
Experience / creativity of project designer to
b. Project design lead 0 - 10
achieve owner's vision and requirements
Experience / ability of technical staff to
Max =
c. Technical staff coordinate construction documents and 0 - 5
25
develop accurate estimates and schedules
Experience / ability of field representatives to
d. Construction administration staff 0 - 10
identify and solve issues during construction
3. Key Consultant Qualifications (Maximum 15 points)
Experience / ability of key consultants to
a. Key consultants 0 - 10
perform effectively and collaboratively
One point for every 2 percent
b. Proposed EDGE-certified Consultant participation* increase in Services compensation** over 0 - 5
theEDGE participation goal
4. Overall Team Qualifications (Maximum 10 points)
Less than 2 sample projects 0
a. Previous team collaboration 2 to 4 sample projects 2 Max = 3
More than 4 sample projects 3
b. OSU Sustainability Standards or LEED*** project LEED projects 1
Max = 2
experience OSU Sustainability Standards projects 2
Training and knowledge 1
c. BIM project experience Max = 3
Direct project experience 3
Clarity of responsibility / communication
d. Team organization 0 - 2
demonstrated by table of organization
5. Overall Team Experience (Maximum 30 points)
Past performance as indicated by
a. Previous team performance 0 - 10
evaluations and letters of reference
Less than 3 projects 0 - 3
b. Experience with similar projects / delivery methods 3 to 6 projects 4 - 6
More than 6 projects 7 - 10
Performance in completing projects within
c. Budget and schedule management 0 - 5
original construction budget and schedule
Less than 3 projects 0 - 1
d. Knowledge of Ohio Capital Improvements process 3 to 6 projects 2 - 3
More than 6 projects 4 - 5
* Must be comprised of consulting firm(s) and NOT the lead firm
** Preconstruction Stage Compensation plus Contract Sum minus Subcontracted Work, Self-performed
Work, and DB's Contingency Subtotal
*** Leadership in Energy & Environmental Design administered by the Green Building Certification
Institute
Notes: Evaluator:
Name
Signature Date
F180-01-2022-MAR Publish Date: 10/30/2026 Page 6 of 6

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Solicitation ID: SRC0000042738 Solicitation Name: SFM - ACAD - FY27 - Non-IT Goods

State Government of Ohio

Bid Due: 11/18/2026

Due 2/4/2027 4:00 pm US/Eastern Question Deadline 12/1/2026 12:00 pm US/Eastern Open 2026-CON-1229-RFP

Columbus Regional Airport Authority

Bid Due: 2/04/2027

Solicitation ID: SRC0000042896 Solicitation Name: CHJCF_Game Room Makeover_10/30/2026 Original Begin Date: 11/4/2026 2:00:14

State Government of Ohio

Bid Due: 11/23/2026

George Miller Covered Bridge Restoration November 23, 2026 @ 10:00 AM Open

County of Brown

Bid Due: 11/23/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.