‘OLD SAND BARN' DEMOLITION AT COUNTY COMMONS

Revised - 4/28/26

(Readvertised in Summit Daily on 5/1/26 & 5/8/26, Posted on Website 5/7/26)

Summit County Government (“County”) is soliciting bids from qualified contractors to provide services for the following: Demolition and disposal of an existing metal building and its foundation - located in Frisco, Colorado. The Project includes the following general items of work:

  • Removal of the existing Sand Storage metal building, concrete slab floor and concrete foundation on site. Disposal shall be in accordance with local Designated Disposal Site (DDS) regulations.

Bids for the construction of the Project will be received electronically with the following text in the subject line: “’Old Sand Barn’ Demolition at County Commons” and must be emailed to daniel.gietzen@summitcountyco.gov until Wednesday May 27, 2026, at 2.00 PM local time. Bids will be publicly opened and read aloud at 12pm MST, Thursday May 28, 2026.

The Contract will be awarded to the lowest responsible bidder who best meets the requirements of the project specifications, Summit County and the public interest.

All bids shall be accompanied by a bid bond guarantee in the amount of five percent (5%) of the base proposal bid.

Information and Bidding Documents for the Project can be found on the following designated website:

https://www.summitcountyco.gov/how_do_i/apply_for/bid_postings.php

Bidding Documents may be downloaded from the designated website. The designated website will be updated periodically with addenda, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Owner will not be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website.

A pre-bid site meeting will be held on Thursday May 14, 2026, at 10:00 A.M. MST/MDT. Meet in 2 nd floor lobby in the County Commons Building at 0037 Peak One Drive. We will drive to the project site from there.

The Summit County Board of County Commissioners reserves the right to reject any or all bids, to waive irregularities or informalities, and to conduct such investigations or negotiations as it deems necessary to select the most responsible and responsive bid.

For additional information or bid submission, please contact Dan Gietzen, Capital Project Manager at Daniel.gietzen@summitcountyco.gov


Links
Project description and scope 4-16-26
1995 Sand Barn plans
Sand Barn photos
Public Notice

Share this page
Share this page ×

Copy and paste this code into your website.

Your Link Name

Share this page on your favorite Social network

Close
Please ensure Javascript is enabled for purposes of website accessibility

Attachment Preview

Exhibit A
Project Description – ‘Old Sand Barn’ Demolition, County Commons
(4-16-26)
The Work consists of the complete demolition and offsite disposal of an existing sand
storage structure and associated concrete foundation located at the County Commons
campus, in Frisco Colorado.
The structure was constructed in the mid-1990s and is approximately 60 feet by 122
feet (7,320 SF).
Work shall include, but is not limited to:
Demolition and removal of the entire building structure.
Demolition and removal of all concrete foundations, slabs, and above-grade
concrete walls.
Loading, hauling, and legal disposal of all materials offsite. Disposal to comply
with County Designated Disposal Site (DDS) requirements.
Site grading and restoration to match adjacent existing grades. Summit County
Government will provide the recycled asphalt milling material for this.
Dust control, traffic control, and site safety measures.
Existing Conditions
Limited record drawings are available for the foundation.
Concrete slab thickness averages approximately 10 inches, based on field test
drillings
Reinforcement is assumed but not confirmed
Structure has no active utilities and is considered a dry facility
Schedule
Work shall be completed within 30 calendar days from Notice to Proceed
All work must be completed no later than September 1, 2026
Pre-Bid Meeting
A pre-bid meeting and site visit will be held:
Date: May 7
Time: 11:00 AM MST
Meeting location: Meet in 2nd floor lobby in County Commons Building. Will
drive to project site from there.
Attendance of the pre-bid meeting is optional but strongly encouraged.
Additional site visits may be scheduled by contacting:
Daniel.gietzen@summitcountyco.gov
Appointments are required due to the project location within an active County campus.
*A bid tab sheet and additional project information will be posted
soon. Please check back soon.
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Scott Sands Lake Renovation and Roof Replacement 10/5/2018 11/1/2018 Sherri Spreng Kennedy Focused...

Denver public Schools

Bid Due: 12/31/2035

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.