| Location: | Washington |
|---|---|
| Posted: | Apr 26, 2025 |
| Due: | Apr 28, 2025 |
| Agency: | City of Spokane |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Bid Date | 4/28/25 1:00pm |
Spokane, WA
This project consists of the reconstruction of overlay slabs and concrete channeling, replacement of existing gravity activated flush system with powered flush control system, providing temporary sewer bypass, electrical conduit and conductors, utility service, site lighting, associated electrical wiring, conduit, & panels, relocation of existing flap check valve, reinforced grassed driveway, ventilation pipe repairs, reconstruction of access manholes, sealing CSO tank roof, wall and roof penetrations, and access risers, removal and replacement of concrete curb, steel access gate, and other related miscellaneous items at three combined sewer overflow (CSO) sites.

With GovernmentContracts, you can:
...Bid Number: PW-0161 Bid Title: 95TH PLACE SEWER AND WATER IMPROVEMENTS PROJECT Category: ...
City of Bothell
Bid Due: 12/03/2026
...of the construction of approximately 10 linear feet of storm sewer, 2 drainage ...
City of Spokane
Bid Due: 12/08/2026
...of the construction of approximately 10 linear feet of storm sewer, 2 drainage ...
City of Spokane
Bid Due: 12/08/2026
.... Developer Project Review 12. Construction Support B. SANITARY SEWER: 1. Pump Stations, ...
City of Poulsbo
Bid Due: 11/20/2026