| Location: | Maryland |
|---|---|
| Posted: | Oct 21, 2025 |
| Due: | Oct 21, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912DR25BA006 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
********************
ABSTRACT OF BIDS
********************
The project consists of maintenance dredging approximately 1,500,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2025 through March 2026. The dredging depth for all channels is between 35 and 50 feet mean lower low water (MLLW) with an additional 1 ? 2 foot of allowable overdepth. Approximately 950,000 cy will be dredged from the Maryland approach channels (Brewerton Eastern Extension and Craighill Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 550,000 cy will be dredged from Baltimore Harbor Channels (Brewerton and Seagirt West Channels) and placed at the Cox Creek Dredged Material Containment Facility. The estimated magnitude of construction is between $25,000,000.00 and $100,000,000.00. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of one to two 30 plus cubic yard clamshell dredges, one 24 ? 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ? 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed.
| Aug 4, 2025 | [Presolicitation (Original)] FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD |
| Sep 19, 2025 | [Solicitation (Original)] FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD |
| Oct 3, 2025 | [Solicitation (Updated)] FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD |
| Oct 8, 2025 | [Solicitation (Updated)] FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD |

With GovernmentContracts, you can:
Project ID: Q-10000530 Title: Elliptical Pipe and Bands Addenda: 0 Release Date: 5/27/2026
Baltimore County
Bid Due: 6/18/2026
Follow NEW Electric Scissor Lift, NIST, Gaithersburg, MD Active Contract Opportunity Notice ID
COMMERCE, DEPARTMENT OF
Bid Due: 6/10/2026
Follow NAWCAD WOLF Intent to Sole Source 3D Printer Maintenance Agreement Active Contract
DEPT OF DEFENSE
Bid Due: 6/05/2026
Follow Intent to Sole Source: Statistical Analysis System (SAS) software licenses for DMCS
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 6/12/2026