| Location: | South Carolina |
|---|---|
| Posted: | Mar 19, 2026 |
| Due: | Apr 23, 2026 |
| Agency: | Charleston County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 6176-26B |
| Publication URL: | To access bid details, please log in. |
Project Description: This project is for the construction of the approximate 22-acre Municipal Solid Waste (Class Three) Landfill Cells 3 & 6 at the Bees Ferry Landfill. The project consists of furnishing and installing, complete, including labor, equipment, parts, materials, and other work incidental for the construction of the Bees Ferry Cell 3 & 6 Expansion to include but not limited to abandonment of the existing Ash Monofill within the existing Cell 3 footprint, installation of an approximate 22-acre class three landfill base liner system consisting of approximately 300,000 CY of structural fill soil materials, geosynthetic clay liner, geomembrane liner, geocomposite drainage net, leachate collection piping, 2-foot minimum soil protective (drainage) cover layer, raincover system, and appurtenances. The project is further detailed in the Specifications and Drawings include with this solicitation.

With GovernmentContracts, you can:
...Project Name: Bamberg County Drainage Improvements 2026 Agency/Owner: Bamberg County Ad Publish...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/24/2026
...Project Name: Rose Dhu Creek Comprehensive Drainage Study RFQu Agency/Owner: Town of Bluffton ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/22/2026
...Project Name: Rebid Jones Road Drainage Improvement Project Agency/Owner: Horry County Ad Publish... ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 12/29/2026
..., material, equipment & work to expand existing apron, improve storm drainage system; ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/16/2026